Misenheimer Solar LLC
49753 Glenmore Road, Gold Hill, NC 28071Plant Summary Information
Misenheimer Solar LLC is ranked #47 out of 876 power plants in North Carolina in terms of total annual net electricity generation.
Misenheimer Solar LLC generated 38.7 GWh during the 3-month period between August 2025 to November 2025.
| Plant Name | Misenheimer Solar LLC |
|---|---|
| Utility Name | Misenheimer Solar LLC |
| Location | Stanly County, NC |
| Initial Operation Date | April 2024 |
| Last Update | Nov 2025 |
| Annual Generation | 161.9 GWh |
| Annual Consumption | 579.5 k MMBtu |
| Ranked #2,796 out of 12,574 Power Plants Nationwide | |
| Ranked #553 out of 6,426 Solar Power Plants Nationwide | |
| Ranked #47 out of 876 North Carolina Power Plants | |
| Ranked #9 out of 761 North Carolina Solar Power Plants | |
| Fuel Types | Solar |
Map of Misenheimer Solar LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Misenheimer Solar LLC.
Monthly Net Generation for Misenheimer Solar LLC
Misenheimer Solar LLC Details
| Summary Information | |
|---|---|
| Plant Name | Misenheimer Solar LLC (66237) |
| Plant Address | 49753 Glenmore Road, Gold Hill, NC 28071 |
| Utility | Misenheimer Solar LLC (65344) |
| Latitude, Longitude | 35.47813, -80.30013 |
| Generation Dates on File | Apr 2024 to Nov 2025 |
| Initial Operation Date | April 2024 |
| Annual Generation | 161.9 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 19-65-001 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | Duke Energy Carolinas (DUK) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Duke Energy Carolinas, LLC (5416) NC |
| Grid Voltage | 100.00 kV |
| Energy Storage | No |
Generator GEN01 Details Operating April 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 74.4 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 74.4 MW |
| Winter Capacity | 74.4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | April 2024 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Bifacial | Yes |
| Azimuth Angle | 180 |
| DC Net Capacity | 104 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Misenheimer Solar LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #543 | Water Strider Solar | Nathalie, VA | 163.7 GWh |
| #544 | Hardeetown Solar Power Plant | Chiefland, FL | 163.7 GWh |
| #545 | Hobnail Solar | Hephzibah, GA | 163.5 GWh |
| #546 | Cabin Creek Solar, LLC | Biscoe, NC | 163.3 GWh |
| #547 | Terrill Creek | Green Cove Springs, FL | 163.3 GWh |
| #548 | Lily Solar | Martin, SC | 163.3 GWh |
| #549 | Sandy Creek Solar Power Plant | Panama City, FL | 163.2 GWh |
| #550 | Echo River Solar | Live Oak, FL | 161.6 GWh |
| #551 | Lone Star Solar | Cameron, SC | 160.9 GWh |
| #552 | OETN1 | Obion, TN | 162.0 GWh |
| #554 | Bay Trail Solar Power Plant | Crystal River, FL | 161.9 GWh |
| #555 | Wilkinson Solar LLC | Pantego, NC | 161.9 GWh |
| #556 | Pecan Tree | Defuniak Springs, FL | 161.8 GWh |
| #557 | Columbia Solar Power Plant | Fort White, FL | 160.7 GWh |
| #558 | Swallowtail | Defuniak Springs, FL | 160.0 GWh |
| #559 | Altavista Solar | Lynch Station, VA | 159.9 GWh |
| #560 | Cove Mountain Solar | Beryl, UT | 159.3 GWh |
| #561 | Yuma Solar + Storage | Fortuna Foothills, AZ | 152.6 GWh |
| #562 | G.S.E. One LLC | Bonham, TX | 158.9 GWh |
| #563 | Blake Solar Plant | Charles Town, WV | 158.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Misenheimer Solar LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Albemarle Hospital Unit | Albemarle, NC | 120.0 MWh | 9.9 mi |
| Albemarle Prime Power Park | New London, NC | 90.0 MWh | 9.7 mi |
| Buck | Salisbury, NC | 4.0 TWh | 16.8 mi |
| Buddy Solar | Gold Hill, NC | 5.5 GWh | 5.7 mi |
| Catawba Solar LLC | Salisbury, NC | 2.9 GWh | 15.8 mi |
| Davidson V | Lexington, NC | 2.4 GWh | 18.2 mi |
| ESA Albemarle NC Solar | Albemarle, NC | 4.3 GWh | 11.4 mi |
| Falls Hydro | Badin, NC | 126.5 GWh | 13.9 mi |
| High Rock Hydro | Denton, NC | 141.0 GWh | 9.3 mi |
| Meadowbrook Solar Farm | Rockwell, NC | 8.6 GWh | 7.2 mi |
| Misenheimer Farm | Richfield, NC | 8.9 GWh | 0.8 mi |
| Narrows (NC) | Badin, NC | 487.5 GWh | 12.4 mi |
| NC 102 Project LLC | Midland, NC | 140.0 GWh | 17 mi |
| Organ Church Solar | Rockwell, NC | 10.2 GWh | 9.1 mi |
| Rockwell Solar LLC | Rockwell, NC | 4.5 GWh | 10.8 mi |
| Salisbury Solar | Salisbury, NC | 7.6 GWh | 12.7 mi |
| Spencer Farm, LLC | Salisbury, NC | 9.5 GWh | 17.3 mi |
| Stanly Solar, LLC | Albemarle, NC | 90.0 GWh | 13.5 mi |
| Tuckertown Hydro | New London, NC | 137.6 GWh | 7 mi |
| Violet Solar | Mount Pleasant, NC | 8.0 GWh | 8.5 mi |