Dry Bridge Solar (Brown University)
471 Dry Bridge Road, North Kingstown, RI 2852Plant Summary Information
Dry Bridge Solar (Brown University) is ranked #10 out of 107 power plants in Rhode Island in terms of total annual net electricity generation.
Dry Bridge Solar (Brown University) generated 19.9 GWh during the 3-month period between May 2026 to August 2026.
| Plant Name | Dry Bridge Solar (Brown University) |
|---|---|
| Utility Name | MN8 Energy LLC |
| Location | Washington County, RI |
| Initial Operation Date | November 2023 |
| Last Update | Aug 2026 |
| Annual Generation | 61.5 GWh |
| Annual Consumption | 237.5 k MMBtu |
| Ranked #4,041 out of 13,301 Power Plants Nationwide | |
| Ranked #1,105 out of 7,209 Solar Power Plants Nationwide | |
| Ranked #10 out of 107 Rhode Island Power Plants | |
| Ranked #2 out of 74 Rhode Island Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operators |
Constellation Solar Rhode Island LLC (2018 to 2018) GSRP (2019 to 2019) Goldman Sachs Renewable Power Group (2020 to 2020) Goldman Sachs Renewable Power LLC (2021 to 2021) MN8 Energy LLC (2022 to 2025) |
Map of Dry Bridge Solar (Brown University)
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Dry Bridge Solar (Brown University).
Monthly Net Generation for Dry Bridge Solar (Brown University)
Monthly Plant Fuel Consumption for Dry Bridge Solar (Brown University)
Dry Bridge Solar (Brown University) Details
| Summary Information | |
|---|---|
| Plant Name | Dry Bridge Solar (Brown University) (62771) |
| Plant Address | 471 Dry Bridge Road, North Kingstown, RI 2852 |
| Utility | MN8 Energy LLC (61944) |
| Latitude, Longitude | 41.55742, -71.50726 |
| Generation Dates on File | Nov 2023 to Aug 2026 |
| Initial Operation Date | November 2023 |
| Annual Generation | 61.5 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 22-445, 22-446, 22-447, 22-448 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | NPCC |
| Balancing Authority | ISO New England Inc. (ISNE) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Aggregated Transit Energy (59679) MA |
| Grid Voltage | 34.50 kV |
| Energy Storage | No |
Generator DBS1 Details Operating November 2023
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 10 MW |
| Summer Capacity | 10 MW |
| Winter Capacity | 10 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | November 2023 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 20 |
| DC Net Capacity | 12.7 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | Yes |
| Net Metering DC Capacity | 12.7 MW |
| Virtual Net Metering Agreement | No |
Generator DBS2 Details Operating November 2023
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 10 MW |
| Summer Capacity | 10 MW |
| Winter Capacity | 10 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | November 2023 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 20 |
| DC Net Capacity | 12.7 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | Yes |
| Net Metering DC Capacity | 12.7 MW |
| Virtual Net Metering Agreement | No |
Generator DBS3 Details Operating November 2023
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 10 MW |
| Summer Capacity | 10 MW |
| Winter Capacity | 10 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | November 2023 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 20 |
| DC Net Capacity | 12.7 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | Yes |
| Net Metering DC Capacity | 12.7 MW |
| Virtual Net Metering Agreement | No |
Generator DBS4 Details Operating November 2023
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 10 MW |
| Summer Capacity | 10 MW |
| Winter Capacity | 10 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | November 2023 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 20 |
| DC Net Capacity | 12.7 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | Yes |
| Net Metering DC Capacity | 12.7 MW |
| Virtual Net Metering Agreement | No |
Dry Bridge Solar (Brown University) Plant Owners
| Owner Name | Address | Generator | Ownership |
|---|---|---|---|
| Dry Bridge Solar 1, LLC | 6600 N Military Trail, Suite 400, Boca Raton, FL 33496 | Generator DBS1 | 100.00% |
| Dry Bridge Solar 1, LLC | 6600 N Military Trail, Suite 400, Boca Raton, FL 33496 | Generator DBS2 | 100.00% |
| Dry Bridge Solar 1, LLC | 6600 N Military Trail, Suite 400, Boca Raton, FL 33496 | Generator DBS3 | 100.00% |
| Dry Bridge Solar 1, LLC | 6600 N Military Trail, Suite 400, Boca Raton, FL 33496 | Generator DBS4 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1095 | Avalon Solar | Pima, AZ | 64.2 GWh |
| #1096 | Pineview Solar, LLC | Pitts, GA | 63.6 GWh |
| #1097 | Jasper County Solar Project | Heber, IN | 63.3 GWh |
| #1098 | Mililani South Solar Farm | Mililani, HI | 56.7 GWh |
| #1099 | Chevron - Lost Hills Hybrid | Lost Hills, CA | 62.6 GWh |
| #1100 | Pawpaw Solar Plant | Butler, GA | 62.5 GWh |
| #1101 | Mechanicsville Solar | Mechanicsville, VA | 62.1 GWh |
| #1102 | Choctaw Fields Solar Project | Ft Towson, OK | 62.0 GWh |
| #1103 | Innovative Solar 67 | Willard, NC | 61.9 GWh |
| #1104 | Caprock Solar 1 LLC | San Jon, NM | 61.6 GWh |
| #1106 | Cuyama Solar, LLC | Cuyama, CA | 61.5 GWh |
| #1107 | Avra Valley Solar | Marana, AZ | 61.5 GWh |
| #1108 | Pastoria Solar | Lebec, CA | 61.3 GWh |
| #1109 | Solar Borrego I | Borrego Springs, CA | 61.3 GWh |
| #1110 | Gulf Coast Solar Center I | Valparaiso, FL | 61.1 GWh |
| #1111 | Walker Springs II | Gainestown, AL | 60.8 GWh |
| #1112 | Edwards Sanborn E3 | Mojave, CA | 57.7 GWh |
| #1113 | Cimarron Solar Facility | Springer, NM | 60.3 GWh |
| #1114 | Hazlehurst II | Hazlehurst, GA | 60.2 GWh |
| #1115 | San Luis Valley Solar Ranch | Mosca, CO | 59.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Dry Bridge Solar (Brown University).
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| 10 Briggs Solar NG, LLC (East) | East Greenwich, RI | 7.7 GWh | 5.2 mi |
| Exeter Mail CSG | Exeter, RI | 8.9 GWh | 3.2 mi |
| Exeter Renewables 1 | Exeter, RI | 16.2 GWh | 1.8 mi |
| Exeter Ten (CSG) | Exeter, RI | 4.8 GWh | 3.5 mi |
| GD Richmond Beaver River I LLC | Richmond, RI | 6.1 GWh | 8.6 mi |
| GD Richmond Buttonwoods I, LLC | Richmond, RI | 2.0 GWh | 9.5 mi |
| GD West Greenwich Nooseneck I, LLC | West Greenwich, RI | 31.1 GWh | 8 mi |
| Hopkins Hill CSG | West Greenwich, RI | 9.6 GWh | 5.1 mi |
| Kearsarge SKSC1 LLC | South Kingstown, RI | 5.5 GWh | 6 mi |
| Kearsarge SKSC2 LLC | South Kingstown, RI | 5.6 GWh | 4.3 mi |
| North Kingstown Solar LLC | North Kingstown, RI | 3.2 GWh | 3.2 mi |
| Robin Hollow Solar | West Greenwich, RI | 70.1 GWh | 8.5 mi |
| Toray Plastic America's CHP Plant | North Kingstown, RI | 156.8 GWh | 4.8 mi |
| University Solar, LLC | West Greenwich, RI | 28.5 GWh | 8.8 mi |
| WED Kingstown Solar I - East Array | Washington, RI | 4.6 GWh | 7.3 mi |
| WED Kingstown Solar I, LLC - West | Richmond, RI | 2.1 GWh | 7.6 mi |
| WED NK Green | North Kingstown, RI | 2.7 GWh | 2 mi |
| WED Stilson Solar | Richmond, RI | 2.9 GWh | 9.6 mi |
| West Davisville Solar | North Kingstown, RI | 2.9 GWh | 3.5 mi |
| White Brook Renewables PV | West Greenwich, RI | 6.9 GWh | 9.4 mi |