Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Coso Energy Developers | Coso Operating Co LLC | Inyokern, CA | California Independent System Operator (CISO) | 244.2 GWh | Nov 1988 | Dec 2024 | Geothermal |
| Coso Power Developers | Coso Operating Co LLC | Inyokern, CA | California Independent System Operator (CISO) | 312.1 GWh | Oct 1989 | Mar 2026 | Geothermal |
| Coso Finance Partners | Coso Operating Co LLC | Inyokern, CA | California Independent System Operator (CISO) | 371.8 GWh | Jun 1987 | Mar 2026 | Geothermal |
| San Jose Cogeneration | San Jose State University Fclts Dev &Ops | San Jose, CA | California Independent System Operator (CISO) | 35.6 GWh | Nov 1984 | Mar 2026 | Natural Gas |
| Olsen | Olsen Power Partners | Whitmore, CA | California Independent System Operator (CISO) | 13.5 GWh | Dec 1989 | Dec 2024 | Water |
| Sand Bar Power Plant | Tri-Dam Power Authority | Stanislaus Ntl. Fores, CA | California Independent System Operator (CISO) | 85.5 GWh | Apr 1986 | Dec 2024 | Water |
| Friant Hydro Facility | Friant Power Authority | Friant, CA | California Independent System Operator (CISO) | 59.8 GWh | Mar 1985 | Dec 2024 | Water |
| Roaring Creek Water Power | Shasta Hydroelectric Inc | Montgomery Creek, CA | California Independent System Operator (CISO) | 7.0 GWh | Nov 1986 | Dec 2024 | Water |
| Hatchet Creek Project | Mega Renewables | Montgomery Creek, CA | California Independent System Operator (CISO) | 22.6 GWh | Nov 1986 | Dec 2024 | Water |
| Kern River Cogeneration | Kern River Cogeneration Co | Bakersfield, CA | California Independent System Operator (CISO) | 96.8 GWh | Jun 1985 | Mar 2026 | Natural Gas |
| Oxnard | Procter&Gamble Paper Products Co-Oxnard | Oxnard, CA | California Independent System Operator (CISO) | 470.0 GWh | Jun 1982 | Mar 2026 | Natural Gas |
| Berry Cogen | Berry Petroleum Co | Taft, CA | California Independent System Operator (CISO) | 7.6 GWh | Nov 1986 | Sep 2025 | Natural Gas |
| Chalk Cliff Limited | WCAC Operating Company | Bakersfield, CA | California Independent System Operator (CISO) | 3.0 GWh | Feb 1990 | Mar 2026 | Natural Gas |
| Woodland Biomass Power Ltd | DTE Energy Services-Woodland | Woodland, CA | California Independent System Operator (CISO) | 170.9 GWh | Aug 1989 | Dec 2024 | Wood/Wood Waste Solids : 99.5% Natural Gas : 0.5% |
| Argus Cogen Plant | Searles Valley Minerals Operations Inc. | Trona, CA | California Independent System Operator (CISO) | 215.9 GWh | Nov 1947 | Mar 2026 | Bituminous Coal : 88.8% Natural Gas : 11.2% |
| Greenleaf 2 Power Plant | Greenleaf Energy LLC | Yuba City, CA | California Independent System Operator (CISO) | 51.1 GWh | Sep 1989 | Mar 2026 | Natural Gas |
| East Portal Generator | Calleguas Mun Water District | Chatsworth, CA | California Independent System Operator (CISO) | 3.9 GWh | Dec 1986 | Dec 2024 | Water |
| Altamont Gas Recovery | WM Renewable Energy LLC | Livermore, CA | California Independent System Operator (CISO) | 38.9 GWh | Feb 1969 | Dec 2024 | Landfill Gas |
| Greenleaf 1 | Calpine Greenleaf Holding, Inc. | Yuba City, CA | California Independent System Operator (CISO) | 4.1 GWh | Jan 1989 | Dec 2024 | Natural Gas |
| Marathon Bay Area Cogen | Tesoro Marketing & Refining Co. LLC (Martinez) | Martinez, CA | California Independent System Operator (CISO) | 596.8 GWh | Jan 1987 | Mar 2026 | Natural Gas |
| Sycamore Energy LLC | Sycamore Energy LLC | Santee, CA | California Independent System Operator (CISO) | 23.1 GWh | Mar 2004 | Dec 2024 | Landfill Gas |
| Kingsburg Cogen | KES Kingsburg LP | Kingsburg, CA | California Independent System Operator (CISO) | 11.0 GWh | Nov 1990 | Nov 2024 | Natural Gas |
| Painted Hills Wind Park | Terra-Gen Operating Co-Wind | Whitewater, CA | California Independent System Operator (CISO) | 154.0 GWh | Oct 1985 | Mar 2026 | Wind |
| Rio Bravo Hydro Project | Olcese Water District | Bakersfield, CA | California Independent System Operator (CISO) | 34.6 GWh | Apr 1989 | Oct 2024 | Water |
| Pacific-Ultrapower Chinese Station | IHI Power Services Corp | Jamestown, CA | California Independent System Operator (CISO) | 107.6 GWh | Sep 1986 | Mar 2026 | Wood/Wood Waste Solids : 99.4% Gaseous Propane : 0.6% |
| Burney Forest Products | Burney Forest Products, A Joint Venture | Burney, CA | California Independent System Operator (CISO) | 193.3 GWh | Sep 1989 | Dec 2024 | Wood/Wood Waste Solids : 94.4% Natural Gas : 5.6% |
| Collins Pine Project | Collins Pine Co | Chester, CA | California Independent System Operator (CISO) | 10.3 GWh | Nov 1985 | Dec 2024 | Wood/Wood Waste Solids |
| Edom Hills Project 1 LLC | Edom Hills Project 1 LLC | Cathedral City, CA | California Independent System Operator (CISO) | 12.4 GWh | Aug 2008 | Nov 2024 | Wind |
| Bowman | Nevada Irrigation District | Nevada City, CA | California Independent System Operator (CISO) | 10.6 GWh | Aug 1986 | Dec 2024 | Water |
| Mesa Wind Power LLC | Brookfield Renewable Trading and Marketing LP | North Palm Springs, CA | California Independent System Operator (CISO) | 111.7 GWh | Oct 1984 | Mar 2026 | Wind |
| Sky River Wind Energy Center | Sky River Wind LLC | Tehachapi, CA | California Independent System Operator (CISO) | 245.0 GWh | Jan 1991 | Dec 2024 | Wind |
| McKittrick Limited | WCAC Operating Company | Bakersfield, CA | California Independent System Operator (CISO) | 4.4 GWh | Sep 1991 | Mar 2026 | Natural Gas |
| SRI International Cogen Project | IPT SRI Cogeneration Inc | Menlo Park, CA | California Independent System Operator (CISO) | 24.0 GWh | Mar 1987 | Mar 2026 | Natural Gas |
| New-Indy Ontario Mill | New-Indy Ontario LLC | Ontario, CA | California Independent System Operator (CISO) | 247.5 GWh | May 1985 | Mar 2026 | Natural Gas |
| Harbor Cogen | Harbor Cogeneration Co. | Wilmington, CA | California Independent System Operator (CISO) | 17.4 GWh | Nov 1988 | Dec 2024 | Natural Gas |
| Badger Creek Limited | WCAC Operating Company | Bakersfield, CA | California Independent System Operator (CISO) | 4.5 GWh | Mar 1991 | Mar 2026 | Natural Gas |
| Salka Cabazon Wind | Salka Cabazon Wind LLC | North Palm Springs, CA | California Independent System Operator (CISO) | 7.9 GWh | Dec 1998 | Dec 2024 | Wind |
| San Joaquin Solar | GASNA 6P, LLC | Helm, CA | California Independent System Operator (CISO) | 24.5 GWh | Sep 2018 | Dec 2024 | Solar |
| RE Garland A | Southern Power Co | Rosamond, CA | California Independent System Operator (CISO) | 58.2 GWh | Aug 2016 | Dec 2024 | Solar |
| Santa Rita Jail Fuel Cell | SRJFC, LLC | Dublin, CA | California Independent System Operator (CISO) | 9.2 GWh | Nov 2016 | Dec 2024 | Natural Gas |
| Verwey-Hanford Dairy Digester #1 | AlsoEnergy | Hanford, CA | California Independent System Operator (CISO) | 901.6 MWh | Sep 2016 | Dec 2024 | Other Biomass Gas |
| AT&T Holger | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 1.3 GWh | May 2016 | Dec 2024 | Natural Gas |
| AT&T Anaheim | Bloom Energy | Anaheim, CA | California Independent System Operator (CISO) | 9.7 GWh | Aug 2016 | Dec 2024 | Natural Gas |
| American Kings Solar, LLC | MN8 Energy LLC | Lemoore, CA | California Independent System Operator (CISO) | 314.4 GWh | Nov 2020 | Mar 2026 | Solar |
| PVN Milliken, LLC | PVN Milliken, LLC | Ontario, CA | California Independent System Operator (CISO) | 4.8 GWh | May 2017 | Dec 2024 | Solar |
| Stanton Energy Reliability Center Hybrid | Wellhead Services, Inc | Stanton, CA | California Independent System Operator (CISO) | 1.7 GWh | Jun 2020 | Mar 2026 | Natural Gas |
| Foundation CDCR LAC | Foundation CA Fund VIII Manager, LLC | Lancaster, CA | California Independent System Operator (CISO) | 4.7 GWh | Nov 2017 | Dec 2024 | Wind |
| Longboat Solar, LLC | Duke Energy Renewables Services | Barstow, CA | California Independent System Operator (CISO) | 42.0 GWh | Nov 2016 | Dec 2024 | Solar |
| Sun Streams, LLC | EDP Renewables North America LLC | Arlington, AZ | California Independent System Operator (CISO) | 412.6 GWh | Dec 2019 | Mar 2026 | Solar |
| Bakersfield Industrial PV 1 | AES Distributed Energy | Bakersfield, CA | California Independent System Operator (CISO) | 2.1 GWh | Nov 2017 | Dec 2024 | Solar |
| Genentech Vacaville Meter #1 | Tesla Inc. | Vacaville, CA | California Independent System Operator (CISO) | 11.0 GWh | Apr 2017 | Dec 2024 | Solar |
| SCDA Solar 1 | SCDA Solar 1, LLC | Sacramento, CA | California Independent System Operator (CISO) | 13.4 GWh | Sep 2017 | Dec 2024 | Solar |
| Golden Fields Solar I, LLC | MN8 Energy LLC | Rosamond, CA | California Independent System Operator (CISO) | 138.6 GWh | Nov 2016 | Mar 2026 | Solar |
| Bayshore Solar B, LLC | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 45.4 GWh | Nov 2017 | Dec 2024 | Solar |
| Bayshore Solar C, LLC | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 41.3 GWh | Nov 2017 | Dec 2024 | Solar |
| Ramona Solar Energy | San Diego Gas & Electric Co | Ramona, CA | California Independent System Operator (CISO) | 5.0 GWh | Mar 2017 | Dec 2024 | Solar |
| Bayshore Solar A, LLC | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 46.4 GWh | Nov 2017 | Dec 2024 | Solar |
| Marin Clean Energy Solar One | AES Distributed Energy | Richmond, CA | California Independent System Operator (CISO) | 21.3 GWh | Nov 2017 | Dec 2024 | Solar |
| Redwood 4 Solar Farm | 54 KR 8me LLC | Edison, CA | California Independent System Operator (CISO) | 39.9 GWh | Nov 2017 | Dec 2024 | Solar |
| Solar Star California, XLI, LLC | MN8 Energy LLC | Rosamond, CA | California Independent System Operator (CISO) | 142.3 GWh | Nov 2016 | Mar 2026 | Solar |
| Lindberg Field Solar 2 | Lindberg Field Solar 2, LLC | San Diego, CA | California Independent System Operator (CISO) | 1.7 GWh | Jan 2017 | Dec 2024 | Solar |
| NextEra Westside PV | Westside Solar, LLC | Five Points, CA | California Independent System Operator (CISO) | 40.6 GWh | Feb 2017 | Dec 2024 | Solar |
| CSUF Nutwood Solar | MN8 Energy LLC | Fullerton, CA | California Independent System Operator (CISO) | 3.1 GWh | Nov 2016 | Dec 2024 | Solar |
| CSUF State College | MN8 Energy LLC | Fullerton, CA | California Independent System Operator (CISO) | 1.6 GWh | Nov 2016 | Dec 2024 | Solar |
| Solar Star California, XLIV, LLC | MN8 Energy LLC | Pearblossom, CA | California Independent System Operator (CISO) | 17.7 GWh | Nov 2016 | Dec 2024 | Solar |
| Whitney Point Solar | Whitney Point Solar, LLC | Five Points, CA | California Independent System Operator (CISO) | 44.4 GWh | Feb 2017 | Dec 2024 | Solar |
| Voyager Wind I | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 359.9 GWh | Nov 2019 | Mar 2026 | Wind |
| Cloverdale Solar Center | Adapture Renewables, Inc. | Cloverdale, CA | California Independent System Operator (CISO) | 2.1 GWh | Apr 2019 | Dec 2024 | Solar |
| Bakersfield PV 1 | AES Distributed Energy | Bakersfield, CA | California Independent System Operator (CISO) | 5.2 GWh | Nov 2017 | Dec 2024 | Solar |
| Delano Land 1 | AES Distributed Energy | Delano, CA | California Independent System Operator (CISO) | 963.0 MWh | Nov 2017 | Dec 2024 | Solar |
| Manteca Land PV | AES Distributed Energy | Manteca, CA | California Independent System Operator (CISO) | 1.6 GWh | Nov 2017 | Dec 2024 | Solar |
| SunAnza | Arizona Electric Pwr Coop Inc | Anza, CA | California Independent System Operator (CISO) | 7.9 GWh | Aug 2017 | Dec 2024 | Solar |
| Solar Blythe 2 | NRG Solar Blythe II LLC | Blythe, CA | California Independent System Operator (CISO) | 38.1 GWh | Mar 2017 | Dec 2024 | Solar |
| Foundation Scheid Vineyards | Foundation CA Fund VIII Manager, LLC | Greenfield, CA | California Independent System Operator (CISO) | 3.9 GWh | Aug 2017 | Dec 2024 | Wind |
| Munro Valley Solar | Ecos Energy LLC | Olancha, CA | California Independent System Operator (CISO) | 10.7 GWh | Sep 2016 | Dec 2024 | Solar |
| RCWD PV Project | MN8 Energy LLC | Murrieta, CA | California Independent System Operator (CISO) | 7.7 GWh | May 2016 | Dec 2024 | Solar |
| CA Dept of Public Health at Richmond | California PV Energy LLC | Richmond, CA | California Independent System Operator (CISO) | 4.0 GWh | Dec 2016 | Dec 2024 | Solar |
| White Wing Solar | Leeward Asset Management, LLC | Yuma, AZ | California Independent System Operator (CISO) | 443.3 GWh | Sep 2024 | Mar 2026 | Solar |
| E&B Resources | Terraform Arcadia | Bakersfield, CA | California Independent System Operator (CISO) | 2.2 GWh | Nov 2013 | Dec 2024 | Solar |
| Jacumba Solar Farm | Invenergy Services LLC | Jacumba, CA | California Independent System Operator (CISO) | 48.3 GWh | Jun 2017 | Dec 2024 | Solar |
| Corcoran | Terraform Arcadia | Corcoran, CA | California Independent System Operator (CISO) | 1.7 GWh | Dec 2013 | Dec 2024 | Solar |
| NLP Granger | Heelstone Energy Holdings, LLC | Valley Center, CA | California Independent System Operator (CISO) | 4.8 GWh | Aug 2016 | Dec 2024 | Solar |
| Valley Center | Heelstone Energy Holdings, LLC | Valley Center, CA | California Independent System Operator (CISO) | 4.7 GWh | Nov 2016 | Dec 2024 | Solar |
| CD4 | CD4 | Mammoth Lakes, CA | California Independent System Operator (CISO) | 276.9 GWh | Jun 2022 | Dec 2024 | Geothermal |
| Tracy 210 | Costco Wholesale | Tracy, CA | California Independent System Operator (CISO) | 21.2 GWh | Feb 2019 | Dec 2024 | Natural Gas |
| Windsor Floating Solar | CA ODEVI LLC | Windsor, CA | California Independent System Operator (CISO) | 2.5 GWh | Oct 2020 | Dec 2024 | Solar |
| SCCCD - Clovis Community College | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 2.0 GWh | Nov 2018 | Dec 2024 | Solar |
| Grossmont HS Solar Project | MN8 Energy LLC | El Cajon, CA | California Independent System Operator (CISO) | 1.8 GWh | Nov 2018 | Dec 2024 | Solar |
| North Kern State Prison Phase II | SunE P11L Holdings, LLC | Delano, CA | California Independent System Operator (CISO) | 6.5 GWh | Aug 2012 | Dec 2024 | Solar |
| Lafayette 2 - MLK Jr. Hospital (MLK) | MN8 Energy LLC | Los Angeles, CA | California Independent System Operator (CISO) | 2.3 GWh | Jul 2020 | Dec 2024 | Solar |
| OES Biogas Power | Organic Energy Solutions, Inc. | San Bernardino, CA | California Independent System Operator (CISO) | 4.9 GWh | - | Dec 2024 | Other Biomass Gas |
| CalCity Solar 1 | CalCity Solar 1, LLC | California City, CA | California Independent System Operator (CISO) | 7.9 GWh | Oct 2019 | Dec 2024 | Solar |
| Santa Barbara ReSource Center | County of Santa Barbara | Goleta, CA | California Independent System Operator (CISO) | 5.4 GWh | May 2022 | Dec 2024 | Other Biomass Gas |
| SCCCD - Fresno Community College | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 2.8 GWh | Sep 2018 | Dec 2024 | Solar |
| Reedley Community College Solar | Forefront Power, LLC | Reedley, CA | California Independent System Operator (CISO) | 3.8 GWh | Nov 2018 | Dec 2024 | Solar |
| Eagle Creek | ZGlobal Inc | Taft, CA | California Independent System Operator (CISO) | 6.5 GWh | Nov 2019 | Dec 2024 | Solar |
| Illumina Way SD | Bloom Energy | San Diego, CA | California Independent System Operator (CISO) | 29.4 GWh | Aug 2019 | Dec 2024 | Natural Gas |
| ATT North Watney | Bloom Energy | Fairfield, CA | California Independent System Operator (CISO) | 8.2 GWh | Nov 2019 | Dec 2024 | Natural Gas |
| Fresno Hoover High School Hybrid | Forefront Power, LLC | Fresno, CA | California Independent System Operator (CISO) | 2.0 GWh | Feb 2020 | Dec 2024 | Solar |
| PSREC/SIAD Solar | Plumas Sierra Rural Electric Coop | Herlong, CA | California Independent System Operator (CISO) | 6.2 GWh | Aug 2018 | Dec 2024 | Solar |
Summary of Power Plants By State
Figures are based on March 2026 generation numbers.| State | Rank | Active Plants | Mar 2026 Generation |
|---|---|---|---|
| Alabama | # 10 | 76 | 10,194.39 GWh |
| Alaska | # 48 | 139 | 566.31 GWh |
| Arizona | # 15 | 183 | 8,256.99 GWh |
| Arkansas | # 25 | 114 | 4,973.03 GWh |
| California | # 5 | 1,656 | 15,197.83 GWh |
| Colorado | # 30 | 294 | 4,491.41 GWh |
| Connecticut | # 31 | 161 | 3,992.67 GWh |
| Delaware | # 49 | 33 | 248.78 GWh |
| District of Columbia | # 51 | 16 | 18.32 GWh |
| Florida | # 3 | 334 | 19,802.71 GWh |
| Georgia | # 8 | 247 | 10,697.11 GWh |
| Hawaii | # 46 | 69 | 784.18 GWh |
| Idaho | # 42 | 144 | 1,957.44 GWh |
| Illinois | # 4 | 379 | 15,489.73 GWh |
| Indiana | # 12 | 216 | 9,257.49 GWh |
| Iowa | # 21 | 289 | 6,478.67 GWh |
| Kansas | # 23 | 183 | 5,489.55 GWh |
| Kentucky | # 29 | 59 | 4,637.74 GWh |
| Louisiana | # 17 | 86 | 8,003.69 GWh |
| Maine | # 45 | 212 | 1,313.24 GWh |
| Maryland | # 39 | 202 | 2,834.84 GWh |
| Massachusetts | # 44 | 639 | 1,383.17 GWh |
| Michigan | # 13 | 268 | 8,564.76 GWh |
| Minnesota | # 26 | 760 | 4,875.53 GWh |
| Mississippi | # 24 | 55 | 5,467.46 GWh |
| Missouri | # 22 | 125 | 5,500.53 GWh |
| State | Rank | Active Plants | Mar 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 69 | 2,464.49 GWh |
| Nebraska | # 37 | 121 | 3,330.39 GWh |
| Nevada | # 35 | 114 | 3,487.65 GWh |
| New Hampshire | # 43 | 54 | 1,520.13 GWh |
| New Jersey | # 28 | 379 | 4,705.05 GWh |
| New Mexico | # 33 | 142 | 3,587.89 GWh |
| New York | # 9 | 935 | 10,247.40 GWh |
| North Carolina | # 11 | 896 | 9,821.46 GWh |
| North Dakota | # 32 | 59 | 3,854.12 GWh |
| Ohio | # 6 | 200 | 12,175.28 GWh |
| Oklahoma | # 19 | 142 | 7,305.54 GWh |
| Oregon | # 20 | 266 | 6,583.30 GWh |
| Pennsylvania | # 2 | 249 | 20,000.86 GWh |
| Rhode Island | # 47 | 100 | 610.71 GWh |
| South Carolina | # 14 | 204 | 8,273.25 GWh |
| South Dakota | # 41 | 52 | 2,184.62 GWh |
| Tennessee | # 18 | 88 | 7,335.80 GWh |
| Texas | # 1 | 961 | 46,858.09 GWh |
| Utah | # 38 | 125 | 3,184.50 GWh |
| Vermont | # 50 | 117 | 217.82 GWh |
| Virginia | # 16 | 233 | 8,059.42 GWh |
| Washington | # 7 | 131 | 10,773.76 GWh |
| West Virginia | # 34 | 40 | 3,543.98 GWh |
| Wisconsin | # 27 | 239 | 4,794.79 GWh |
| Wyoming | # 36 | 70 | 3,358.51 GWh |