| Mountain View IV | AES Distributed Energy | North Palm Springs, CA | California Independent System Operator (CISO) | 186.8 GWh | Jan 2012 | Dec 2024 | Wind |
| Imperial Solar Energy Center West | CSOLAR IV West LLC | Seeley, CA | California Independent System Operator (CISO) | 373.6 GWh | Mar 2016 | Dec 2024 | Solar |
| Stroud Solar Station | Pacific Gas & Electric Co. | Helm, CA | California Independent System Operator (CISO) | 25.0 GWh | Aug 2011 | Oct 2024 | Solar |
| Manzana Wind LLC | Avangrid Power LLC | Rosamond, CA | California Independent System Operator (CISO) | 543.7 GWh | Nov 2012 | Dec 2024 | Wind |
| Solar Borrego I | NRG Solar Borrego I | Borrego Springs, CA | California Independent System Operator (CISO) | 62.2 GWh | Jan 2013 | Dec 2024 | Solar |
| California Valley Solar Ranch | Clearway Energy Operating LLC | California Valley, CA | California Independent System Operator (CISO) | 597.7 GWh | Aug 2012 | Dec 2024 | Solar |
| Solar Photovoltaic Project #42 | Southern California Edison Co | Tulare, CA | California Independent System Operator (CISO) | 7.6 GWh | Oct 2012 | Dec 2024 | Solar |
| AV Solar Ranch One | AV Solar Ranch 1 LLC | Lancaster, CA | California Independent System Operator (CISO) | 556.6 GWh | Jul 2014 | Feb 2026 | Solar |
| Five Points Solar Station | Pacific Gas & Electric Co. | Five Points, CA | California Independent System Operator (CISO) | 15.4 GWh | Aug 2011 | Dec 2024 | Solar |
| Avenal Park | Avenal Solar Holdings LLC | Avenal, CA | California Independent System Operator (CISO) | 9.5 GWh | Jul 2011 | Dec 2024 | Solar |
| Imperial Solar Energy Center South | CSOLAR IV South LLC | Calexico, CA | California Independent System Operator (CISO) | 264.3 GWh | Oct 2013 | Dec 2024 | Solar |
| Sun City Project LLC | Avenal Solar Holdings LLC | Avenal, CA | California Independent System Operator (CISO) | 33.9 GWh | Jul 2011 | Dec 2024 | Solar |
| Agua Caliente Solar Project | Agua Caliente Solar | Dateland, AZ | California Independent System Operator (CISO) | 561.4 GWh | Apr 2012 | Feb 2026 | Solar |
| Sand Drag LLC | Avenal Solar Holdings LLC | Avenal, CA | California Independent System Operator (CISO) | 28.2 GWh | Jul 2011 | Dec 2024 | Solar |
| Bolthouse S&P and Rowen Farms Solar | MMA WBF Power LP | Palmdale, CA | California Independent System Operator (CISO) | 67.0 MWh | Oct 2008 | Apr 2024 | Solar |
| UCI Facilities Management Central Plant | University of California Irvine | Irvine, CA | California Independent System Operator (CISO) | 112.6 GWh | Jun 2007 | Feb 2026 | Natural Gas |
| Imperial Valley Solar, LLC | Imperial Valley Solar, LLC | Calexico, CA | California Independent System Operator (CISO) | 443.5 GWh | Oct 2013 | Dec 2024 | Solar |
| Hatchet Ridge Wind Project | Pattern Operators LP | Burney, CA | California Independent System Operator (CISO) | 268.2 GWh | Nov 2010 | Dec 2024 | Wind |
| Ivanpah 1 | NRG Energy Services | Nipton, CA | California Independent System Operator (CISO) | 198.2 GWh | Nov 2013 | Jan 2026 | Solar : 96.2% Natural Gas : 3.8% |
| Ivanpah 2 | NRG Energy Services | Nipton, CA | California Independent System Operator (CISO) | 229.2 GWh | Nov 2013 | Feb 2026 | Solar : 95.5% Natural Gas : 4.5% |
| Solar Blythe LLC | NRG Solar Blythe | Blythe, CA | California Independent System Operator (CISO) | 41.8 GWh | Nov 2009 | Dec 2024 | Solar |
| CM10 | Consolidated Edison Development Inc. | Boulder City, NV | California Independent System Operator (CISO) | 18.0 GWh | Nov 2008 | Dec 2024 | Solar |
| CalRenew-1 | CalRenew-1 LLC | Mendota, CA | California Independent System Operator (CISO) | 1.3 GWh | Mar 2010 | Dec 2024 | Solar |
| El Cajon Energy Center | Wellhead Services, Inc | El Cajon, CA | California Independent System Operator (CISO) | 9.0 GWh | May 2010 | Dec 2024 | Natural Gas |
| Dillon Wind LLC | Avangrid Power LLC | North Palm Springs, CA | California Independent System Operator (CISO) | 142.4 GWh | Mar 2008 | Dec 2024 | Wind |
| Panoche Energy Center | Panoche Energy Center, LLC | Firebaugh, CA | California Independent System Operator (CISO) | 668.8 GWh | May 2009 | Feb 2026 | Natural Gas |
| CSU Fresno Solar Project | MMA Fresno Power LP | Fresno, CA | California Independent System Operator (CISO) | 1.4 GWh | Nov 2007 | Dec 2024 | Solar |
| Ivanpah 3 | NRG Energy Services | Nipton, CA | California Independent System Operator (CISO) | 231.3 GWh | Nov 2013 | Feb 2026 | Solar : 96.2% Natural Gas : 3.8% |
| Shiloh Wind Project 2 LLC | EDF Renewable Asset Holdings, Inc. | Birds Landing, CA | California Independent System Operator (CISO) | 393.1 GWh | Dec 2008 | Dec 2024 | Wind |
| Vaca Dixon Solar Station | Pacific Gas & Electric Co. | Vacaville, CA | California Independent System Operator (CISO) | 3.2 GWh | Nov 2009 | Dec 2024 | Solar |
| Canyon Power Plant | City of Anaheim - (CA) | Anaheim, CA | California Independent System Operator (CISO) | 13.9 GWh | Jul 2011 | Feb 2026 | Natural Gas |
| SunEdison Walmart Apple Valley DC | SunE M5 Holdings LLC | Apple Valley, CA | California Independent System Operator (CISO) | 716.0 MWh | Feb 2009 | Dec 2024 | Solar |
| Chuckawalla Valley State Prison | SunE CPA CDC1 LLC | Blythe, CA | California Independent System Operator (CISO) | 1.4 GWh | May 2006 | Dec 2024 | Solar |
| SunEdison Anheuser Busch Fairfield | SunE M5 Holdings LLC | Fairfield, CA | California Independent System Operator (CISO) | 1.2 GWh | Nov 2008 | Dec 2024 | Solar |
| Kohls San Bernardino Solar Facility | SunE WF3 KHL A Holdings, LLC | San Bernardino, CA | California Independent System Operator (CISO) | 944.0 MWh | Oct 2007 | Dec 2024 | Solar |
| SunEdison Procter & Gamble Oxnard | SunE U6 Holdings LLC | Oxnard, CA | California Independent System Operator (CISO) | 1.6 GWh | Sep 2009 | Dec 2024 | Solar |
| SunEdison Ironwood State Prison | SunE CPA CDC2 LLC | Blythe, CA | California Independent System Operator (CISO) | 996.0 MWh | Apr 2008 | Dec 2024 | Solar |
| Walgreens Woodland Distribution Center | SunE WG45 Woodland LLC | Woodland, CA | California Independent System Operator (CISO) | 908.0 MWh | Jul 2007 | Dec 2024 | Solar |
| Mariani Packing Vacaville Solar | SunE U6 Holdings LLC | Vacaville, CA | California Independent System Operator (CISO) | 1.3 GWh | Oct 2008 | Dec 2024 | Solar |
| SunEdison Walgreens Moreno Valley | SunE WG113 Moreno Valley LLC | Moreno Valley, CA | California Independent System Operator (CISO) | 900.0 MWh | Aug 2007 | Dec 2024 | Solar |
| Ameresco Chiquita Canyon | AMERESCO Chiquita Canyon LLC | Castaic, CA | California Independent System Operator (CISO) | 2.1 GWh | Oct 2010 | Dec 2024 | Landfill Gas |
| Ameresco Ox Mountain | AMERESCO Ox Mountain Energy LLC | Half Moon Bay, CA | California Independent System Operator (CISO) | 80.8 GWh | Nov 2008 | Feb 2026 | Landfill Gas |
| Mojave Solar Project | Mojave Solar LLC | Hinkley, CA | California Independent System Operator (CISO) | 586.2 GWh | Nov 2014 | Feb 2026 | Solar |
| Panoche Valley Solar Farm | Consolidated Edison Development Inc. | Paicines, CA | California Independent System Operator (CISO) | 266.7 GWh | Dec 2017 | Feb 2026 | Solar |
| Ameresco Keller Canyon | AMERESCO Keller Canyon LLC | Bay Point, CA | California Independent System Operator (CISO) | 19.1 GWh | Jun 2009 | Dec 2024 | Landfill Gas |
| Garnet Wind Energy Center | Terra-Gen Operating Co-Wind | North Palm Springs, CA | California Independent System Operator (CISO) | 11.9 GWh | May 2009 | Dec 2024 | Wind |
| Alpine Solar | Alpine BESS LLC | Lancaster, CA | California Independent System Operator (CISO) | 118.8 GWh | Jan 2013 | Dec 2024 | Solar |
| Alta Wind Energy Center V | Alta Wind V, LLC | Mojave, CA | California Independent System Operator (CISO) | 288.4 GWh | Mar 2011 | Dec 2024 | Wind |
| Alta Wind Energy Center IV | Alta Wind IV, LLC | Mojave, CA | California Independent System Operator (CISO) | 193.4 GWh | Mar 2011 | Dec 2024 | Wind |
| Alta Wind Energy Center III | Alta Wind III, LLC | Mojave, CA | California Independent System Operator (CISO) | 363.2 GWh | Jan 2011 | Dec 2024 | Wind |
| Alta Wind Energy Center II | Alta Wind II, LLC | Mojave, CA | California Independent System Operator (CISO) | 364.6 GWh | Dec 2010 | Dec 2024 | Wind |
| Alta Wind Energy Center I | Alta Wind I, LLC | Mojave, CA | California Independent System Operator (CISO) | 434.7 GWh | Dec 2010 | Dec 2024 | Wind |
| Marsh Landing Generating Station | Marsh Landing LLC | Antioch, CA | California Independent System Operator (CISO) | 14.9 GWh | Apr 2013 | Feb 2026 | Natural Gas |
| G2 Energy Ostrom Road LLC | G2 Energy LLC | Wheatland, CA | California Independent System Operator (CISO) | 29.0 GWh | Jan 2009 | Dec 2024 | Landfill Gas |
| Gap Pacific Distribution Center | MN8 Energy LLC | Fresno, CA | California Independent System Operator (CISO) | 5.4 GWh | Sep 2008 | Dec 2024 | Solar |
| CM48 | Consolidated Edison Development Inc. | Boulder City, NV | California Independent System Operator (CISO) | 94.3 GWh | May 2010 | Dec 2024 | Solar |
| Orange Grove Peaking Facility | Orange Grove Energy LP | Pala, CA | California Independent System Operator (CISO) | 23.6 GWh | May 2010 | Dec 2024 | Natural Gas |
| FPL Energy Montezuma Winds LLC | FPL Energy Montezuma Wind | Birds Landing, CA | California Independent System Operator (CISO) | 85.4 GWh | Oct 2010 | Dec 2024 | Wind |
| Calabasas Gas to Energy Facility | Los Angeles County Sanitation | Agoura, CA | California Independent System Operator (CISO) | 36.3 GWh | Jun 2010 | Dec 2024 | Landfill Gas |
| Midway Peaking LLC | CalPeak Power, LLC | Firebaugh, CA | California Independent System Operator (CISO) | 15.7 GWh | Apr 2009 | Dec 2024 | Natural Gas |
| Terra-Gen VG Wind LLC | Terra-Gen Operating Co-Wind | Tehachapi, CA | California Independent System Operator (CISO) | 7.6 GWh | Dec 1983 | Jun 2024 | Wind |
| Friant Hydro Facility | Friant Power Authority | Friant, CA | California Independent System Operator (CISO) | 59.8 GWh | Mar 1985 | Dec 2024 | Water |
| New-Indy Ontario Mill | New-Indy Ontario LLC | Ontario, CA | California Independent System Operator (CISO) | 245.1 GWh | May 1985 | Feb 2026 | Natural Gas |
| Sierra Pacific Quincy Facility | Sierra Pacific Industries | Quincy, CA | California Independent System Operator (CISO) | 192.5 GWh | Nov 1986 | Dec 2024 | Wood/Wood Waste Solids |
| Burney Creek | Snow Mountain Hydro LLC | Burney, CA | California Independent System Operator (CISO) | 8.9 GWh | Feb 1990 | Dec 2024 | Water |
| Sky River Wind Energy Center | Sky River Wind LLC | Tehachapi, CA | California Independent System Operator (CISO) | 245.0 GWh | Jan 1991 | Dec 2024 | Wind |
| Cove Hydroelectric | Snow Mountain Hydro LLC | Burney, CA | California Independent System Operator (CISO) | 18.4 GWh | Jan 1990 | Dec 2024 | Water |
| Ellwood | Ellwood Power, LLC | Goleta, CA | California Independent System Operator (CISO) | 2.5 GWh | Jul 1974 | Dec 2024 | Natural Gas |
| Lost Creek I | Snow Mountain Hydro LLC | Burney, CA | California Independent System Operator (CISO) | 5.1 GWh | Nov 1989 | Dec 2024 | Water |
| Ponderosa Bailey Creek | Snow Mountain Hydro LLC | Manton, CA | California Independent System Operator (CISO) | 2.9 GWh | Feb 1990 | Dec 2024 | Water |
| Karen Avenue Wind Farm | San Gorgonio Farms Inc | North Palm Springs, CA | California Independent System Operator (CISO) | 23.4 GWh | Dec 1984 | Dec 2024 | Wind |
| Kyocera International Inc.(San Diego) | Kyocera International, Inc | San Diego, CA | California Independent System Operator (CISO) | 9.1 GWh | Aug 2012 | Dec 2024 | Natural Gas |
| Sand Bar Power Plant | Tri-Dam Power Authority | Stanislaus Ntl. Fores, CA | California Independent System Operator (CISO) | 85.5 GWh | Apr 1986 | Dec 2024 | Water |
| Sierra Pacific Burney Facility | Sierra Pacific Industries | Burney, CA | California Independent System Operator (CISO) | 96.3 GWh | Sep 1986 | Dec 2024 | Wood/Wood Waste Solids |
| Marina Landfill Gas | Monterey Regional Waste Mgmt | Marina, CA | California Independent System Operator (CISO) | 22.8 GWh | Mar 1998 | Dec 2024 | Landfill Gas |
| Argus Cogen Plant | Searles Valley Minerals Operations Inc. | Trona, CA | California Independent System Operator (CISO) | 227.2 GWh | Nov 1947 | Feb 2026 | Bituminous Coal : 92.5% Natural Gas : 7.5% |
| East Portal Generator | Calleguas Mun Water District | Chatsworth, CA | California Independent System Operator (CISO) | 3.9 GWh | Dec 1986 | Dec 2024 | Water |
| Kingsburg Cogen | KES Kingsburg LP | Kingsburg, CA | California Independent System Operator (CISO) | 11.0 GWh | Nov 1990 | Nov 2024 | Natural Gas |
| Dinosaur Point | International Turbine Res Inc | Los Banos, CA | California Independent System Operator (CISO) | 4.9 GWh | Apr 1988 | Jun 2024 | Wind |
| Rio Bravo Fresno | Rio Bravo Fresno | Fresno, CA | California Independent System Operator (CISO) | 108.4 GWh | Jun 1988 | Oct 2024 | Wood/Wood Waste Solids : 94.7% Natural Gas : 5.3% |
| SRI International Cogen Project | IPT SRI Cogeneration Inc | Menlo Park, CA | California Independent System Operator (CISO) | 23.9 GWh | Mar 1987 | Feb 2026 | Natural Gas |
| Rio Bravo Rocklin | Rio Bravo Rocklin | Lincoln, CA | California Independent System Operator (CISO) | 155.2 GWh | May 1989 | Dec 2024 | Wood/Wood Waste Solids : 99.1% Natural Gas : 0.9% |
| Sycamore Energy LLC | Sycamore Energy LLC | Santee, CA | California Independent System Operator (CISO) | 23.1 GWh | Mar 2004 | Dec 2024 | Landfill Gas |
| Kern River Cogeneration | Kern River Cogeneration Co | Bakersfield, CA | California Independent System Operator (CISO) | 91.8 GWh | Jun 1985 | Feb 2026 | Natural Gas |
| Harbor Cogen | Harbor Cogeneration Co. | Wilmington, CA | California Independent System Operator (CISO) | 17.4 GWh | Nov 1988 | Dec 2024 | Natural Gas |
| E F Oxnard Energy Facility | EF Oxnard, LLC | Oxnard, CA | California Independent System Operator (CISO) | 4.7 GWh | May 1990 | Dec 2025 | Natural Gas |
| Calistoga Power Plant | Geysers Power Co LLC | Middletown, CA | California Independent System Operator (CISO) | 456.1 GWh | Feb 1984 | Feb 2026 | Geothermal |
| Nacimiento Hydro Project | Monterey Cnty Water Res Agency | Bradley, CA | California Independent System Operator (CISO) | 18.2 GWh | Jun 1987 | Dec 2024 | Water |
| Bowman | Nevada Irrigation District | Nevada City, CA | California Independent System Operator (CISO) | 10.6 GWh | Aug 1986 | Dec 2024 | Water |
| Lockhart Solar PV, LLC | Terra-Gen Operating Co-Solar | Hinkley, CA | California Independent System Operator (CISO) | 241.0 GWh | Nov 1989 | Feb 2026 | Solar |
| Kern Front Limited | WCAC Operating Company | Bakersfield, CA | California Independent System Operator (CISO) | 12.2 GWh | Jan 1989 | Dec 2024 | Natural Gas |
| Double C Generation Limited Partnership | WCAC Operating Company | Bakersfield, CA | California Independent System Operator (CISO) | 14.9 GWh | Feb 1989 | Dec 2024 | Natural Gas |
| Gas Utilization Facility | City of San Diego | San Diego, CA | California Independent System Operator (CISO) | 30.1 GWh | May 1985 | Feb 2026 | Other Biomass Gas |
| Ridgetop Energy LLC | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 27.0 GWh | Dec 1983 | Dec 2024 | Wind |
| Mammoth G2 | Ormat Nevada Inc | Mammoth Lakes, CA | California Independent System Operator (CISO) | 82.3 GWh | Nov 1990 | Dec 2024 | Geothermal |
| Cameron Ridge LLC | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 144.0 GWh | Nov 1984 | Dec 2024 | Wind |
| Mammoth G1 | Ormat Nevada Inc | Mammoth lakes, CA | California Independent System Operator (CISO) | 59.6 GWh | Nov 1984 | Dec 2024 | Geothermal |
| Mammoth G3 | Ormat Nevada Inc | Mammoth Lakes, CA | California Independent System Operator (CISO) | 103.1 GWh | Nov 1990 | Dec 2024 | Geothermal |
| Puente Hills Energy Recovery | Los Angeles County Sanitation | Whittier, CA | California Independent System Operator (CISO) | 147.4 GWh | Sep 1986 | Feb 2026 | Landfill Gas |
| Muck Valley Hydroelectric | Brookfield Renewable Trading and Marketing LP | NA, CA | California Independent System Operator (CISO) | 81.8 GWh | Nov 1988 | Dec 2024 | Water |
Summary of Power Plants By State
Figures are based on February 2026 generation numbers.| State | Rank | Active Plants | Feb 2026 Generation |
|---|---|---|---|
| Alabama | # 10 | 77 | 10,522.92 GWh |
| Alaska | # 48 | 139 | 547.09 GWh |
| Arizona | # 16 | 185 | 7,875.02 GWh |
| Arkansas | # 25 | 114 | 5,134.19 GWh |
| California | # 5 | 1,679 | 13,090.02 GWh |
| Colorado | # 31 | 296 | 4,129.24 GWh |
| Connecticut | # 32 | 162 | 3,713.11 GWh |
| Delaware | # 49 | 33 | 489.00 GWh |
| District of Columbia | # 51 | 16 | 15.28 GWh |
| Florida | # 3 | 334 | 18,619.02 GWh |
| Georgia | # 8 | 248 | 10,834.93 GWh |
| Hawaii | # 47 | 70 | 669.33 GWh |
| Idaho | # 41 | 145 | 1,901.37 GWh |
| Illinois | # 4 | 380 | 14,875.53 GWh |
| Indiana | # 12 | 216 | 9,790.54 GWh |
| Iowa | # 19 | 291 | 6,378.25 GWh |
| Kansas | # 29 | 183 | 4,702.54 GWh |
| Kentucky | # 22 | 60 | 6,056.73 GWh |
| Louisiana | # 17 | 86 | 7,844.56 GWh |
| Maine | # 45 | 215 | 1,304.77 GWh |
| Maryland | # 38 | 203 | 3,022.33 GWh |
| Massachusetts | # 43 | 638 | 1,703.92 GWh |
| Michigan | # 11 | 269 | 9,944.77 GWh |
| Minnesota | # 28 | 764 | 4,707.75 GWh |
| Mississippi | # 23 | 57 | 5,592.62 GWh |
| Missouri | # 24 | 127 | 5,447.62 GWh |
| State | Rank | Active Plants | Feb 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 70 | 2,424.51 GWh |
| Nebraska | # 35 | 125 | 3,248.85 GWh |
| Nevada | # 39 | 114 | 3,017.15 GWh |
| New Hampshire | # 44 | 56 | 1,533.32 GWh |
| New Jersey | # 27 | 386 | 5,076.17 GWh |
| New Mexico | # 37 | 143 | 3,060.89 GWh |
| New York | # 9 | 950 | 10,653.43 GWh |
| North Carolina | # 7 | 904 | 11,173.71 GWh |
| North Dakota | # 33 | 59 | 3,698.46 GWh |
| Ohio | # 6 | 200 | 13,061.62 GWh |
| Oklahoma | # 18 | 142 | 6,415.64 GWh |
| Oregon | # 21 | 271 | 6,135.97 GWh |
| Pennsylvania | # 2 | 252 | 20,963.61 GWh |
| Rhode Island | # 46 | 100 | 708.28 GWh |
| South Carolina | # 15 | 207 | 8,044.42 GWh |
| South Dakota | # 42 | 52 | 1,872.08 GWh |
| Tennessee | # 20 | 88 | 6,323.51 GWh |
| Texas | # 1 | 959 | 41,824.62 GWh |
| Utah | # 36 | 125 | 3,187.35 GWh |
| Vermont | # 50 | 116 | 163.02 GWh |
| Virginia | # 14 | 237 | 9,222.47 GWh |
| Washington | # 13 | 135 | 9,340.69 GWh |
| West Virginia | # 30 | 40 | 4,249.38 GWh |
| Wisconsin | # 26 | 243 | 5,119.83 GWh |
| Wyoming | # 34 | 70 | 3,369.17 GWh |