Directory of Power Plants in the United States
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
Corcoran Solar | Consolidated Edison Development Inc. | Corcoran, CA | California Independent System Operator (CISO) | 34.6 GWh | Jul 2013 | Dec 2024 | Solar |
Honda Torrance | Bloom Energy | Torrance, CA | California Independent System Operator (CISO) | 762.0 MWh | Nov 2012 | Dec 2023 | Natural Gas |
Xilinx San Jose | Bloom Energy | San Jose, CA | California Independent System Operator (CISO) | 8.3 GWh | Jan 2012 | Dec 2024 | Natural Gas |
Roll Lost Hills | Bloom Energy | Lost Hills, CA | California Independent System Operator (CISO) | 5.5 GWh | Nov 2012 | Dec 2023 | Natural Gas |
North Sky River Energy LLC | North Sky River Energy LLC | Weldon, CA | California Independent System Operator (CISO) | 435.0 GWh | Nov 2012 | Dec 2024 | Wind |
Roll Delano | Bloom Energy | Delano, CA | California Independent System Operator (CISO) | 8.9 GWh | Aug 2012 | Dec 2023 | Natural Gas |
Roll Delano 2 | Bloom Energy | Delano, CA | California Independent System Operator (CISO) | 7.4 GWh | Aug 2012 | Dec 2023 | Natural Gas |
Atwell Island | SPS Atwell Island LLC | Alpaugh, CA | California Independent System Operator (CISO) | 33.3 GWh | Feb 2013 | Dec 2024 | Solar |
Gridley Main | Altus Power America Management, LLC | Gridley, CA | California Independent System Operator (CISO) | 1.6 GWh | Feb 2013 | Dec 2024 | Solar |
Gridley Main Two | Altus Power America Management, LLC | Gridley, CA | California Independent System Operator (CISO) | 4.0 GWh | Mar 2013 | Dec 2023 | Solar |
White River Solar | Consolidated Edison Development Inc. | Alpaugh, CA | California Independent System Operator (CISO) | 44.3 GWh | Jun 2013 | Dec 2024 | Solar |
Foundation AB | Foundation HA Energy Generation, LLC | Fairfield, CA | California Independent System Operator (CISO) | 2.1 GWh | Oct 2011 | Dec 2024 | Wind |
Venable Solar 2 | Venable Solar, LLC | Blythe, CA | California Independent System Operator (CISO) | 3.4 GWh | Mar 2015 | Dec 2024 | Solar |
Oakley Solar Project | Oakley Solar Project LLC | Oakley, CA | California Independent System Operator (CISO) | 2.4 GWh | May 2013 | Dec 2023 | Solar |
Venable Solar 1 | Venable Solar, LLC | Blythe, CA | California Independent System Operator (CISO) | 3.4 GWh | Mar 2015 | Dec 2024 | Solar |
TA-High Desert LLC | TA-High Desert LLC | Lancaster, CA | California Independent System Operator (CISO) | 56.8 GWh | Feb 2013 | Dec 2024 | Solar |
Cold Canyon 1 | Toro Energy of California SLO | San Luis Obispo, CA | California Independent System Operator (CISO) | 10.0 GWh | Jun 2013 | Dec 2023 | Landfill Gas |
Pinyon Pine II | Pinyon Pines Wind II, LLC | Mojave, CA | California Independent System Operator (CISO) | 233.1 GWh | Oct 2012 | Dec 2024 | Wind |
West Gates Solar Station | Pacific Gas & Electric Co. | Huron, CA | California Independent System Operator (CISO) | 19.2 GWh | Apr 2013 | Dec 2024 | Solar |
L-8 Solar Project | L-8 Solar Project LLC | Palmdale, CA | California Independent System Operator (CISO) | 2.4 GWh | Apr 2012 | Dec 2024 | Solar |
Alta Wind VIII | Nextera Energy Resources | Mojave, CA | California Independent System Operator (CISO) | 222.0 GWh | Dec 2011 | Dec 2024 | Wind |
Industry MetroLink PV 1 | City of Industry | Industry, CA | California Independent System Operator (CISO) | 1.1 GWh | Mar 2012 | Dec 2024 | Solar |
Parnassus Central Utility Plant | University of California-San Francisco | San Francisco, CA | California Independent System Operator (CISO) | 68.7 GWh | Dec 1995 | Apr 2025 | Natural Gas |
Univ of California San Diego Solar | University of California San Diego | La Jolla, CA | California Independent System Operator (CISO) | 2.1 GWh | Nov 2008 | Dec 2024 | Solar |
CSUF Trigeneration | California State University at Fullerton | Fullerton, CA | California Independent System Operator (CISO) | 38.0 GWh | Sep 2010 | Apr 2025 | Natural Gas : 82.1% Solar : 17.9% |
G2 Energy Hay Rd | G2 Energy LLC | Vacaville, CA | California Independent System Operator (CISO) | 12.2 GWh | May 2013 | Dec 2024 | Landfill Gas |
RE Victor Phelan Solar One LLC | MN8 Energy LLC | Adelanto, CA | California Independent System Operator (CISO) | 44.7 GWh | Nov 2013 | Dec 2024 | Solar |
Golden Springs Building D | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 651.0 MWh | Feb 2012 | Dec 2024 | Solar |
Golden Springs Building C-1 | Golden Springs Development Company LLC | Santa Fe Springs, CA | California Independent System Operator (CISO) | 1.3 GWh | Jan 2012 | Dec 2024 | Solar |
Energy Center | University of Redlands | Redlands, CA | California Independent System Operator (CISO) | 1.5 GWh | Jan 2007 | Dec 2024 | Natural Gas |
Porterville Solar | Altus Power America Management, LLC | Porterville, CA | California Independent System Operator (CISO) | 5.7 GWh | Dec 2013 | Dec 2024 | Solar |
Lindsay Solar | Altus Power America Management, LLC | Lindsay, CA | California Independent System Operator (CISO) | 6.2 GWh | Dec 2013 | Dec 2024 | Solar |
Naval Air Weapons Station China Lake | MN8 Energy LLC | Ridgecrest, CA | California Independent System Operator (CISO) | 22.0 GWh | Aug 2012 | Dec 2024 | Solar |
Ivanhoe Solar | Altus Power America Management, LLC | Visalia, CA | California Independent System Operator (CISO) | 5.6 GWh | Dec 2013 | Dec 2024 | Solar |
Radiance Solar 4 | Greenbacker Renewable Energy Corporation | Lancaster, CA | California Independent System Operator (CISO) | 3.3 GWh | Jun 2013 | Dec 2024 | Solar |
Exeter Solar | Altus Power America Management, LLC | Exeter, CA | California Independent System Operator (CISO) | 4.6 GWh | Jan 2014 | Dec 2024 | Solar |
Radiance Solar 5 | Greenbacker Renewable Energy Corporation | Lancaster, CA | California Independent System Operator (CISO) | 2.8 GWh | Jun 2013 | Dec 2024 | Solar |
Kingsburg Solar | Altus Power America Management, LLC | Kingsburg, CA | California Independent System Operator (CISO) | 6.0 GWh | Nov 2013 | Dec 2024 | Solar |
Taylor Farms Salinas | Bloom Energy | Salinas, CA | California Independent System Operator (CISO) | 7.6 GWh | Aug 2012 | Dec 2023 | Natural Gas |
Life Technologies Carlsbad | Bloom Energy | Carlsbad, CA | California Independent System Operator (CISO) | 8.6 GWh | Jul 2012 | Dec 2024 | Natural Gas |
Foundation IE | Foundation HA Energy Generation, LLC | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 373.0 MWh | Nov 2011 | Dec 2024 | Wind |
Juniper Networks Sunnyvale | Bloom Energy | Sunnyvale, CA | California Independent System Operator (CISO) | 3.9 GWh | Nov 2012 | Dec 2024 | Natural Gas |
Foundation NWNA | Foundation CA Fund V Manager, LLC | Cabazon, CA | California Independent System Operator (CISO) | 18.1 GWh | Nov 2012 | Dec 2024 | Wind |
Wagner Wind LLC | Greenbacker Renewable Energy Corporation | Palm Springs, CA | California Independent System Operator (CISO) | 15.5 GWh | Nov 2012 | Dec 2024 | Wind |
Kaiser Downey | Bloom Energy 2009 PPA | Downey, CA | California Independent System Operator (CISO) | 8.7 GWh | May 2012 | Dec 2024 | Natural Gas |
Palo Verde College | Scale Sustainable I, LLC | Blythe, CA | California Independent System Operator (CISO) | 2.0 GWh | Jul 2009 | Dec 2023 | Solar |
Delano Energy Center | Wellhead Services, Inc | Delano, CA | California Independent System Operator (CISO) | 7.3 GWh | Dec 2012 | Dec 2024 | Natural Gas |
Ameresco Butte County | Ameresco Butte County LLC | Paradise, CA | California Independent System Operator (CISO) | 16.8 GWh | Jan 2013 | Dec 2024 | Landfill Gas |
La Joya Del Sol | CVI CleanCapital Solar 1 LLC | Fresno, CA | California Independent System Operator (CISO) | 1.4 GWh | Nov 2012 | Dec 2024 | Solar |
Lone Valley Solar Park I LLC | Lone Valley Solar Park I LLC | Lucerne Valley, CA | California Independent System Operator (CISO) | 23.6 GWh | Nov 2014 | Dec 2024 | Solar |
Victor Dry Farm Ranch A | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 9.7 GWh | May 2015 | Dec 2024 | Solar |
Victor Dry Farm Ranch B | AES Distributed Energy | Victorville, CA | California Independent System Operator (CISO) | 9.5 GWh | May 2015 | Dec 2024 | Solar |
J.R. Simplot Company | J.R. Simplot Company | Lathrop, CA | California Independent System Operator (CISO) | 8.9 GWh | Sep 1993 | Dec 2023 | Waste Heat |
Foundation RRM | Foundation CA Fund V Manager, LLC | Cabazon, CA | California Independent System Operator (CISO) | 8.9 GWh | Nov 2012 | Dec 2024 | Wind |
SEPV 8 | Duke Energy Renewables Services | Twentynine Palms, CA | California Independent System Operator (CISO) | 32.7 GWh | May 2013 | Dec 2024 | Solar |
Foundation Cemex Madison | Foundation CA Fund V Manager, LLC | Madison, CA | California Independent System Operator (CISO) | 1.6 GWh | Jul 2012 | Dec 2024 | Wind |
C&H Sugar Plant | C&H Sugar Company Inc | Crockett, CA | California Independent System Operator (CISO) | 34.2 GWh | Sep 1957 | Apr 2025 | Purchased Steam |
Heliocentric | Heliocentric LLC | Palmdale, CA | California Independent System Operator (CISO) | 2.0 GWh | Feb 2012 | Dec 2024 | Solar |
Dinuba Wastewater Treatment Plant | AES Distributed Energy | Dinuba, CA | California Independent System Operator (CISO) | 1.4 GWh | Oct 2011 | Dec 2024 | Solar |
Sunshine Gas Producers | Sunshine Gas Producers LLC | Sylmar, CA | California Independent System Operator (CISO) | 123.2 GWh | Jul 2014 | Apr 2025 | Landfill Gas |
Centinela Solar Energy | Arevon Energy, Inc. | Calexico, CA | California Independent System Operator (CISO) | 352.7 GWh | Jun 2013 | Dec 2024 | Solar |
Newberry Solar 1 LLC | Newberry Solar 1 LLC | Newberry Springs, CA | California Independent System Operator (CISO) | 1.3 GWh | Nov 2013 | Dec 2023 | Solar |
Grassland 1&2 Solar Project | Yolo County of | Davis, CA | California Independent System Operator (CISO) | 1.6 GWh | Jun 2013 | Jun 2024 | Solar |
Pinyon Pine I | Pinyon Pines Wind I, LLC | Mojave, CA | California Independent System Operator (CISO) | 306.6 GWh | Oct 2012 | Dec 2024 | Wind |
Solar Star 1 | Solar Star California XIX, LLC | Rosamond, CA | California Independent System Operator (CISO) | 891.8 GWh | Feb 2014 | Apr 2025 | Solar |
Solar Star 2 | Solar Star California XX, LLC | Rosamond, CA | California Independent System Operator (CISO) | 724.3 GWh | Feb 2014 | Apr 2025 | Solar |
RE Kansas South LLC | RE Kansas South LLC | Lemoore, CA | California Independent System Operator (CISO) | 49.2 GWh | May 2013 | Dec 2024 | Solar |
Castle Rock Vineyards | Castle Rock Cooling | Delano, CA | California Independent System Operator (CISO) | 1.7 GWh | Aug 2010 | Dec 2024 | Solar |
Alta Wind X | Alta Wind X, LLC | Mojave, CA | California Independent System Operator (CISO) | 336.5 GWh | Dec 2013 | Dec 2023 | Wind |
Hoag Hospital Cogen Plant | Hoag Memorial Presbyterian Hospital | Newport Beach, CA | California Independent System Operator (CISO) | 8.8 GWh | Jun 2006 | Apr 2025 | Natural Gas |
Alta Wind XI | Alta Wind XI, LLC | Mojave, CA | California Independent System Operator (CISO) | 269.5 GWh | Dec 2013 | Dec 2024 | Wind |
Franklin Templeton San Mateo | Bloom Energy | San Mateo, CA | California Independent System Operator (CISO) | 9.3 GWh | Oct 2011 | Dec 2024 | Natural Gas |
Ameresco Johnson Canyon | Ameresco Johnson Canyon LLC | Gonzales, CA | California Independent System Operator (CISO) | 8.7 GWh | Apr 2013 | Dec 2024 | Landfill Gas |
Kaiser Ontario | Bloom Energy 2009 PPA | Ontario, CA | California Independent System Operator (CISO) | 2.8 GWh | Sep 2012 | Dec 2024 | Natural Gas |
SEPV9 Power Plant | Duke Energy Renewables Services | Twentynine Palms, CA | California Independent System Operator (CISO) | 24.3 GWh | May 2013 | Dec 2024 | Solar |
Mustang Hills LLC | Mustang Hills, LLC (Longroad) | Mojave, CA | California Independent System Operator (CISO) | 301.5 GWh | Apr 2012 | Dec 2024 | Wind |
Tahquitz High School | AES Distributed Energy | Hemet, CA | California Independent System Operator (CISO) | 1.6 GWh | Aug 2012 | Dec 2024 | Solar |
Santa Cruz Energy | Santa Cruz Energy LLC | Santa Cruz, CA | California Independent System Operator (CISO) | 4.6 GWh | Oct 2009 | Dec 2024 | Landfill Gas |
Windstar 1 | Nextera Energy Resources | Tehachapi, CA | California Independent System Operator (CISO) | 263.0 GWh | Jan 2012 | Dec 2024 | Wind |
Imperial Solar Energy Center West | CSOLAR IV West LLC | Seeley, CA | California Independent System Operator (CISO) | 373.6 GWh | Mar 2016 | Dec 2024 | Solar |
Foundation ST | Foundation HA Energy Generation, LLC | Tracy, CA | California Independent System Operator (CISO) | 2.2 GWh | May 2011 | Dec 2024 | Wind |
Vaca Dixon Solar Station | Pacific Gas & Electric Co. | Vacaville, CA | California Independent System Operator (CISO) | 3.2 GWh | Nov 2009 | Dec 2024 | Solar |
Broadridge Cogen | Broadridge Customer Communications | El Dorado Hills, CA | California Independent System Operator (CISO) | 15.8 GWh | Apr 2008 | Dec 2024 | Natural Gas : 91.9% Solar : 8.1% |
Imperial Solar Energy Center South | CSOLAR IV South LLC | Calexico, CA | California Independent System Operator (CISO) | 264.3 GWh | Oct 2013 | Dec 2024 | Solar |
Stroud Solar Station | Pacific Gas & Electric Co. | Helm, CA | California Independent System Operator (CISO) | 25.0 GWh | Aug 2011 | Oct 2024 | Solar |
Rising Tree Wind Farm | Rising Tree Wind Farm LLC | Mojave, CA | California Independent System Operator (CISO) | 249.0 GWh | Dec 2014 | Dec 2024 | Wind |
Robert O Schulz Solar Farm | South San Joaquin Irr District | Oakdale, CA | California Independent System Operator (CISO) | 2.1 GWh | Apr 2008 | Dec 2024 | Solar |
Teichert Materials-Teichert Vernalis | Foundation HA Energy Generation, LLC | San Joaquin, CA | California Independent System Operator (CISO) | 1.9 GWh | Sep 2010 | Dec 2024 | Wind |
Orange Grove Peaking Facility | Orange Grove Energy LP | Pala, CA | California Independent System Operator (CISO) | 23.6 GWh | May 2010 | Dec 2024 | Natural Gas |
Manzana Wind LLC | Avangrid Power LLC | Rosamond, CA | California Independent System Operator (CISO) | 543.7 GWh | Nov 2012 | Dec 2024 | Wind |
Mariposa Energy Project | Diamond Generating Corporation | Byron, CA | California Independent System Operator (CISO) | 73.7 GWh | Sep 2012 | Apr 2025 | Natural Gas |
Sentinel Energy Center, LLC | Sentinel Energy Center LLC | Desert Hot Springs, CA | California Independent System Operator (CISO) | 311.2 GWh | Apr 2013 | Apr 2025 | Natural Gas |
University of California San Diego Hybri | University of California San Diego | La Jolla, CA | California Independent System Operator (CISO) | 219.1 GWh | Jun 2001 | Apr 2025 | Natural Gas |
Oxnard Paper Mill | New-Indy, Oxnard LLC | Oxnard, CA | California Independent System Operator (CISO) | 190.8 GWh | Feb 1986 | Apr 2025 | Natural Gas |
Shiloh III Wind Project LLC | EDF Renewable Asset Holdings, Inc. | Birds Landing, CA | California Independent System Operator (CISO) | 265.2 GWh | Nov 2011 | Dec 2024 | Wind |
Gap Pacific Distribution Center | MN8 Energy LLC | Fresno, CA | California Independent System Operator (CISO) | 5.4 GWh | Sep 2008 | Dec 2024 | Solar |
Marsh Landing Generating Station | Marsh Landing LLC | Antioch, CA | California Independent System Operator (CISO) | 118.9 GWh | Apr 2013 | Apr 2025 | Natural Gas |
Ameresco Chiquita Canyon | AMERESCO Chiquita Canyon LLC | Castaic, CA | California Independent System Operator (CISO) | 2.1 GWh | Oct 2010 | Dec 2024 | Landfill Gas |
Ivanpah 2 | NRG Energy Services | Nipton, CA | California Independent System Operator (CISO) | 276.7 GWh | Nov 2013 | Apr 2025 | Solar : 95.9% Natural Gas : 4.1% |
Walnut Creek Energy Park | Walnut Creek LLC | Industry, CA | California Independent System Operator (CISO) | 204.3 GWh | Mar 2013 | Apr 2025 | Natural Gas |
Summary of Power Plants By State
Figures are based on April 2025 generation numbers.State | Rank | Active Plants | Apr 2025 Generation |
---|---|---|---|
Alabama | # 7 | 75 | 10,243.20 GWh |
Alaska | # 48 | 142 | 476.79 GWh |
Arizona | # 15 | 173 | 7,447.02 GWh |
Arkansas | # 31 | 99 | 3,937.58 GWh |
California | # 4 | 1,664 | 15,684.45 GWh |
Colorado | # 28 | 290 | 4,479.29 GWh |
Connecticut | # 37 | 162 | 2,832.47 GWh |
Delaware | # 49 | 32 | 450.59 GWh |
District of Columbia | # 51 | 16 | 13.07 GWh |
Florida | # 2 | 317 | 20,430.69 GWh |
Georgia | # 6 | 248 | 11,378.75 GWh |
Hawaii | # 46 | 68 | 750.53 GWh |
Idaho | # 44 | 145 | 1,489.98 GWh |
Illinois | # 5 | 358 | 14,828.23 GWh |
Indiana | # 14 | 208 | 7,809.31 GWh |
Iowa | # 19 | 294 | 6,020.16 GWh |
Kansas | # 21 | 180 | 5,162.37 GWh |
Kentucky | # 25 | 57 | 4,785.23 GWh |
Louisiana | # 16 | 83 | 7,414.75 GWh |
Maine | # 45 | 208 | 1,052.11 GWh |
Maryland | # 36 | 196 | 3,016.71 GWh |
Massachusetts | # 43 | 623 | 1,491.61 GWh |
Michigan | # 9 | 269 | 9,486.98 GWh |
Minnesota | # 27 | 765 | 4,502.46 GWh |
Mississippi | # 20 | 56 | 5,727.48 GWh |
Missouri | # 23 | 120 | 5,119.33 GWh |
State | Rank | Active Plants | Apr 2025 Generation |
---|---|---|---|
Montana | # 40 | 70 | 2,029.46 GWh |
Nebraska | # 38 | 127 | 2,575.70 GWh |
Nevada | # 33 | 110 | 3,434.99 GWh |
New Hampshire | # 42 | 56 | 1,516.23 GWh |
New Jersey | # 22 | 385 | 5,160.42 GWh |
New Mexico | # 32 | 139 | 3,447.34 GWh |
New York | # 8 | 930 | 9,830.59 GWh |
North Carolina | # 10 | 909 | 9,044.94 GWh |
North Dakota | # 35 | 57 | 3,134.93 GWh |
Ohio | # 12 | 197 | 8,321.20 GWh |
Oklahoma | # 18 | 136 | 6,341.82 GWh |
Oregon | # 24 | 272 | 4,888.92 GWh |
Pennsylvania | # 3 | 255 | 17,282.62 GWh |
Rhode Island | # 47 | 97 | 690.36 GWh |
South Carolina | # 11 | 200 | 8,436.34 GWh |
South Dakota | # 41 | 52 | 1,909.63 GWh |
Tennessee | # 26 | 86 | 4,565.37 GWh |
Texas | # 1 | 885 | 43,683.73 GWh |
Utah | # 39 | 122 | 2,192.68 GWh |
Vermont | # 50 | 117 | 200.11 GWh |
Virginia | # 17 | 233 | 6,991.48 GWh |
Washington | # 13 | 134 | 8,268.23 GWh |
West Virginia | # 30 | 39 | 3,969.31 GWh |
Wisconsin | # 29 | 244 | 4,163.43 GWh |
Wyoming | # 34 | 73 | 3,236.34 GWh |