Ward WTP
2011 Kivett Dr., High Point, NC 27260Plant Summary Information
Ward WTP is ranked #35 out of 49 distillate fuel oil power plants in North Carolina in terms of total annual net electricity generation.
Ward WTP is comprised of 2 generators and generated 18.1 MWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Ward WTP |
|---|---|
| Utility Name | City Of High Point |
| Location | Guilford County, NC |
| Initial Operation Date | February 1999 |
| Last Update | Dec 2024 |
| Annual Generation | 110.0 MWh |
| Annual Consumption | 1.3 k MMBtu |
| Ranked #12,104 out of 12,539 Power Plants Nationwide | |
| Ranked #789 out of 1,236 Distillate Fuel Oil Power Plants Nationwide | |
| Ranked #858 out of 873 North Carolina Power Plants | |
| Ranked #35 out of 49 North Carolina Distillate Fuel Oil Power Plants | |
| Fuel Types | Distillate Fuel Oil |
| Previous Operator |
Town Of High Point (2013 to 2017) City Of High Point (2018 to 2024) |
Map of Ward WTP
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Ward WTP.
Monthly Net Generation for Ward WTP
Ward WTP Details
| Summary Information | |
|---|---|
| Plant Name | Ward WTP (57607) |
| Plant Address | 2011 Kivett Dr., High Point, NC 27260 |
| Utility | City Of High Point (56934) |
| Latitude, Longitude | 35.9678, -79.9708 |
| Generation Dates on File | Jan 2010 to Dec 2024 |
| Initial Operation Date | February 1999 |
| Annual Generation | 110.0 MWh |
| Fuel Types | Distillate Fuel Oil |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | SERC |
| Balancing Authority | Duke Energy Carolinas (DUK) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Town of High Point (8571) NC |
| Grid Voltage | 12.47 kV |
| Energy Storage | No |
Generator 1 Details Operating February 1999
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 1 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 1 MW |
| Winter Capacity | 1 MW |
| Minimum Load | 1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | February 1999 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 2 Details Operating February 1999
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 1 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 1 MW |
| Winter Capacity | 1 MW |
| Minimum Load | 1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | February 1999 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Ward WTP Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Distillate Fuel Oil.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #779 | Lime Creek | Mason City, IA | 115.0 MWh |
| #780 | Salem Street Dept | Salem, VA | 115.0 MWh |
| #781 | Monument | Dayton, OH | 114.0 MWh |
| #782 | Weatherly(PA) RTO BTM | Weatherly, PA | 114.0 MWh |
| #783 | CG PS Victoria WWTP, LLC | Victoria, TX | 114.0 MWh |
| #784 | Ascutney | Weatherfield, VT | 113.0 MWh |
| #785 | Wahoo | Wahoo, NE | 132.0 MWh |
| #786 | Baldwin City Plant No 2 | Baldwin City, KS | 199.0 MWh |
| #787 | Cape Gas Turbine | Portland, ME | 111.0 MWh |
| #788 | Southwick | Houston, TX | 111.0 MWh |
| #790 | Ferndale Generating Station | Ferndale, WA | 1.7 TWh |
| #791 | South Fond Du Lac | Fond du Lac, WI | 5.4 GWh |
| #792 | William Floyd School District | Mastic Beach, NY | 3.2 GWh |
| #793 | Bayville Central Facility | Bayville, NJ | 2.0 GWh |
| #794 | Larsen Memorial | Lakeland, FL | 298.1 GWh |
| #795 | Ord | Ord, NE | 106.0 MWh |
| #796 | North Generation Plant | Greenfield, IA | 105.0 MWh |
| #797 | NCAH Central Utility Plant | Ames, IA | 3.3 GWh |
| #798 | Westside WWTP | Thomasville, NC | 103.0 MWh |
| #799 | Progress Drive Generation Station | Shelby, OH | 103.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Ward WTP.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Beth | Julian, NC | 7.5 GWh | 19.7 mi |
| Changeup | Asheboro, NC | 3.9 GWh | 18.3 mi |
| Charlie | Julian, NC | 6.3 GWh | 20.2 mi |
| Davidson Gas Producers LLC | Lexington, NC | 11.5 GWh | 14.8 mi |
| DE Solar 657 Brigham Rd | Greensboro, NC | 580.0 MWh | 9.5 mi |
| Eastside WWTP | High Point, NC | 276.0 MWh | 3.9 mi |
| High Point, POLO | High Point, NC | 60.0 MWh | 0.6 mi |
| High Point, Pump Station Rd | High Point, NC | 61.0 MWh | 1.7 mi |
| Ingredion Winston Salem | Winston-Salem, NC | 49.5 GWh | 15 mi |
| Lowe Solar Energy Storage | Asheboro, NC | 3.7 GWh | 17.6 mi |
| Millikan Farm | Randleman, NC | 9.3 GWh | 15.2 mi |
| Salem Energy Systems LLC | Winston-Salem, NC | 7.5 GWh | 19.5 mi |
| South Winston Farm, LLC | Winston-Salem, NC | 8.8 GWh | 19 mi |
| Spencer Meadow Solar Energy Storage | Asheboro, NC | 3.7 GWh | 17.6 mi |
| Tanager Holdings | Asheboro, NC | 5.8 GWh | 18.2 mi |
| Thunderhead | Asheboro, NC | 3.2 GWh | 18.1 mi |
| Trinity Solar | Trinity, NC | 7.4 GWh | 7.1 mi |
| Waste Management Piedmont LFGTE Project | Kernersville, NC | 9.0 GWh | 16.1 mi |
| Westside WWTP | Thomasville, NC | 103.0 MWh | 8 mi |
| White Street Renewables | Greensboro, NC | 15.6 GWh | 16.7 mi |