Webb Forging
160 Webb Forging Road, Carlisle, SC 29031Plant Summary Information
Webb Forging is ranked #27 out of 27 distillate fuel oil power plants in South Carolina in terms of total annual net electricity generation.
Webb Forging is comprised of 2 generators and generated 7.3 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Webb Forging |
|---|---|
| Utility Name | Central Electric Power |
| Location | Union County, SC |
| Initial Operation Date | July 2003 |
| Last Update | Dec 2025 |
| Annual Generation | 30.0 MWh |
| Annual Consumption | 1.0 k MMBtu |
| Ranked #12,899 out of 13,081 Power Plants Nationwide | |
| Ranked #1,021 out of 1,233 Distillate Fuel Oil Power Plants Nationwide | |
| Ranked #201 out of 202 South Carolina Power Plants | |
| Ranked #27 out of 27 South Carolina Distillate Fuel Oil Power Plants | |
| Fuel Types | Distillate Fuel Oil |
Map of Webb Forging
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Webb Forging.
Monthly Net Generation for Webb Forging
Monthly Plant Fuel Consumption for Webb Forging
Webb Forging Details
| Summary Information | |
|---|---|
| Plant Name | Webb Forging (7814) |
| Plant Address | 160 Webb Forging Road, Carlisle, SC 29031 |
| Utility | Central Electric Power (59159) |
| Latitude, Longitude | 34.5567, -81.4919 |
| Generation Dates on File | Jan 2003 to Dec 2025 |
| Initial Operation Date | July 2003 |
| Annual Generation | 30.0 MWh |
| Fuel Types | Distillate Fuel Oil |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | SERC |
| Balancing Authority | Duke Energy Carolinas (DUK) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | NA |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Broad River Electric Coop, Inc (2212) SC |
| Grid Voltage | 12.47 kV |
| Energy Storage | No |
Generator 1 Details Operating July 2003
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 2.9 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 2.8 MW |
| Winter Capacity | 2.8 MW |
| Minimum Load | 2 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | July 2003 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 2 Details Operating July 2003
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 2.9 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 2.4 MW |
| Winter Capacity | 2.4 MW |
| Minimum Load | 2 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | July 2003 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Webb Forging Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Distillate Fuel Oil.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1011 | Windom | Windom, MN | 32.0 MWh |
| #1012 | Wilkins Station | Marblehead, MA | 32.0 MWh |
| #1013 | Willmar Municipal East Substation | Willmar, MN | 32.0 MWh |
| #1014 | Mass Inst Tech Cntrl Utilities/Cogen Plt | Cambridge, MA | 209.4 GWh |
| #1015 | Cascade | Cascade, IA | 31.0 MWh |
| #1016 | South Fond Du Lac | Fond du Lac, WI | 20.3 GWh |
| #1017 | Hoisington | Hoisington, KS | 39.0 MWh |
| #1018 | Alliant SBD 8602 Marion Sub | Marion, IA | 30.4 MWh |
| #1019 | Willmar Municipal SW Substation | Willmar, MN | 30.0 MWh |
| #1020 | State Farm | Bloomington, IL | 30.0 MWh |
| #1022 | Westside WWTP | Thomasville, NC | 30.0 MWh |
| #1023 | Durant | Durant, IA | 29.4 MWh |
| #1024 | Mobile | York, NE | 29.0 MWh |
| #1025 | NewYork-Presbyterian Brooklyn Methodist | Brooklyn, NY | 29.0 MWh |
| #1026 | Overall Road Station | Farmington, MO | 29.0 MWh |
| #1027 | Johnson | Johnson, KS | 28.0 MWh |
| #1028 | Marathon Generating Plant | Marathon, FL | 27.7 MWh |
| #1029 | Gillette SBMC | Boston, MA | 54.2 GWh |
| #1030 | Oxford (NE) | Oxford, NE | 82.0 MWh |
| #1031 | Grantsburg Diesel | Grantsburg, WI | 26.5 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Webb Forging.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| 99 Islands | Blacksburg, SC | 31.3 GWh | 32.8 mi |
| Beaverdam Renewable Energy Center | Grey Court, SC | 13.1 GWh | 31.3 mi |
| Cedar Creek (SC) | Great Falls, SC | 101.6 GWh | 35.1 mi |
| Cherokee County Cogen | Gaffney, SC | 644.3 GWh | 36.3 mi |
| City West Diesel Plant | Union, SC | 114.0 MWh | 14.5 mi |
| Clifton Dam 3 Power Station | Converse, SC | 3.7 GWh | 36 mi |
| Dearborn | Great Falls, SC | 70.2 GWh | 34.2 mi |
| Fairfield Pumped Storage | Jenkinsville, SC | 450.6 GWh | 19.6 mi |
| Fishing Creek | Great Falls, SC | 76.8 GWh | 34.2 mi |
| Hecate Energy West Newberry, LLC | Newberry, SC | 6.2 GWh | 23 mi |
| Lockhart | Lockhart, SC | 49.3 GWh | 15.5 mi |
| Midway Green Solar | Union, SC | 20.5 GWh | 10.9 mi |
| Neal Shoals | Union, SC | 13.4 GWh | 7.8 mi |
| Parr Hydro | Jenkinsville, SC | 53.3 GWh | 22.4 mi |
| Pinson Solar Farm | Woodruff, SC | 30.1 GWh | 34.2 mi |
| Sediver | York, SC | 129.0 MWh | 33.1 mi |
| Thermal Kem | Rock Hill, SC | 105.0 MWh | 33.1 mi |
| Union Renewable Energy Facility | Enoree, SC | 15.7 GWh | 19 mi |
| Upper Pacolet Hydro | Pacolet, SC | 4.8 GWh | 29 mi |
| V C Summer | Jenkinsville, SC | 6.9 TWh | 20.5 mi |