Iredell County LFG Facility
356 Twin Oaks Road, Statesville, NC 28625Plant Summary Information
Iredell County LFG Facility is ranked #4 out of 17 landfill gas power plants in North Carolina in terms of total annual net electricity generation.
Iredell County LFG Facility is comprised of 2 generators and generated 6.5 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Iredell County LFG Facility |
---|---|
Utility Name | Iredell Transmission LLC |
Location | Iredell County, NC |
Initial Operation Date | August 2008 |
Last Update | Dec 2024 |
Annual Generation | 25.7 GWh |
Annual Consumption | 290.6 k MMBtu |
Ranked #4,844 out of 12,288 Power Plants Nationwide | |
Ranked #109 out of 292 Landfill Gas Power Plants Nationwide | |
Ranked #139 out of 868 North Carolina Power Plants | |
Ranked #4 out of 17 North Carolina Landfill Gas Power Plants | |
Fuel Types | Landfill Gas |
Map of Iredell County LFG Facility
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Iredell County LFG Facility.
Monthly Net Generation for Iredell County LFG Facility
Iredell County LFG Facility Details
Summary Information | |
---|---|
Plant Name | Iredell County LFG Facility (56962) |
Plant Address | 356 Twin Oaks Road, Statesville, NC 28625 |
Utility | Iredell Transmission LLC (56261) |
Latitude, Longitude | 35.76928, -80.826 |
Generation Dates on File | Jan 2009 to Dec 2024 |
Initial Operation Date | August 2008 |
Annual Generation | 25.7 GWh |
Fuel Types | Landfill Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 08-19-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Carolinas (DUK) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Self contained radiator |
Ash Impoundment | No |
Transmission / Distribution Owner | EnergyUnited Elec Member Corp (21632) NC |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator 1 Details Operating August 2008
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | n/a |
RTO ISO Location Designation For Reporting Wholesale Sales Data | n/a |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.6 MW |
Winter Capacity | 1.6 MW |
Minimum Load | 1.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 2008 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Subcritical Technology | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator 2 Details Operating August 2008
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | n/a |
RTO ISO Location Designation For Reporting Wholesale Sales Data | n/a |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.6 MW |
Winter Capacity | 1.6 MW |
Minimum Load | 1.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | August 2008 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Subcritical Technology | No |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Iredell County LFG Facility Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Landfill Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#99 | Ameresco Dallas LLC | Dallas, TX | 27.6 GWh |
#100 | Sand Valley Power Station | Collinsville, AL | 27.2 GWh |
#101 | Two Pine Landfill Gas Recovery | North Little Rock, AR | 27.2 GWh |
#102 | Mahoning | New Springfield, OH | 26.8 GWh |
#103 | Liberty I & II LFGTE | Monticello, IN | 26.7 GWh |
#104 | Trail Ridge Landfill Gas Recovery | Baldwin, FL | 26.4 GWh |
#105 | Republic Services Renewable Energy, LLC | Las Vegas, NV | 26.3 GWh |
#106 | DANC LFGTE Facility | Rodman, NY | 25.9 GWh |
#107 | Waste Management Lockwood LFGTE | Sparks, NV | 25.8 GWh |
#108 | Oak Ridge LFGTE | Logansport, IN | 25.8 GWh |
#110 | MM Lopez Energy | Lake View Terrace, CA | 25.5 GWh |
#111 | Oneida Herkimer | Boonville, NY | 25.3 GWh |
#112 | Eastern Landfill Gas LLC | White Marsh, MD | 25.3 GWh |
#113 | Lake Mills Gas Recovery | Lake Mills, IA | 24.8 GWh |
#114 | Terry Bundy Generating Station | Lincoln, NE | 161.2 GWh |
#115 | Archbald Power Station | Archbald, PA | 93.9 GWh |
#116 | Mountain View | Greencastle, PA | 25.6 GWh |
#117 | Salt Lake Energy Systems | Salt Lake City, UT | 24.3 GWh |
#118 | Milner Butte LFGE | Burley, ID | 24.1 GWh |
#119 | Pendleton County LFGTE | Butler, KY | 23.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Iredell County LFG Facility.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
1045 Tomlin Mill Solar | Statesville, NC | 7.7 GWh | 10.2 mi |
Apple Data Center PV3 | Conover, NC | 31.3 GWh | 18.6 mi |
Arndt Farm | Claremont, NC | 8.7 GWh | 19.6 mi |
Catawba Solar LLC | Salisbury, NC | 2.9 GWh | 19.9 mi |
Daniel Farm LLC | Mocksville, NC | 8.5 GWh | 16.2 mi |
Lookout Shoals | Statesville, NC | 105.5 GWh | 14.8 mi |
Marshall (NC) | Terrell, NC | 8.0 TWh | 14.2 mi |
Mocksville Farm | Mocksville, NC | 9.0 GWh | 17.6 mi |
Mocksville Solar | Mocksville, NC | 25.7 GWh | 14.8 mi |
Old Catawba PV 1 | Claremont, NC | 5.6 GWh | 17.7 mi |
Oxford Dam | Conover, NC | 91.9 GWh | 20.8 mi |
Redmon Solar Farm LLC | Cleveland, NC | 4.0 GWh | 9.8 mi |
Rowan | Salisbury, NC | 4.3 TWh | 12.8 mi |
Saw Solar | China Grove, NC | 10.6 GWh | 17.7 mi |
Statesville Solar | Cleveland, NC | 9.1 GWh | 6.7 mi |
Stikeleather Farm | Hiddenite, NC | 9.5 GWh | 18.2 mi |
Taylorsville Solar LLC | Taylorsville, NC | 1.0 GWh | 20.7 mi |
Tripple State Farm | Statesville, NC | 9.8 GWh | 3.7 mi |
West Salisbury Farm LLC | Salisbury, NC | 8.5 GWh | 18.3 mi |
Woodleaf Solar Facility | Salisbury, NC | 11.7 GWh | 12.6 mi |