James E. Rogers Energy Complex
Duke Power Rd #1002, Cliffside, NC 28024Plant Summary Information
James E. Rogers Energy Complex is ranked #9 out of 873 power plants in North Carolina in terms of total annual net electricity generation.
James E. Rogers Energy Complex is comprised of 2 generators and generated 2.0 TWh during the 3-month period between June 2025 to September 2025.
| Plant Name | James E. Rogers Energy Complex |
|---|---|
| Utility Name | Duke Energy Carolinas, LLC |
| Location | Cleveland County, NC |
| Initial Operation Date | June 1972 |
| Last Update | Sep 2025 |
| Annual Generation | 5.3 TWh |
| Annual Consumption | 56.1 M MMBtu |
| Ranked #202 out of 12,539 Power Plants Nationwide | |
| Ranked #254 out of 2,243 Natural Gas Power Plants Nationwide | |
| Ranked #9 out of 873 North Carolina Power Plants | |
| Ranked #11 out of 27 North Carolina Natural Gas Power Plants | |
| Fuel Types | Natural Gas : 51.6% Bituminous Coal : 48.2% |
Map of James E. Rogers Energy Complex
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for James E. Rogers Energy Complex.
Monthly Net Generation for James E. Rogers Energy Complex
James E. Rogers Energy Complex Details
| Summary Information | |
|---|---|
| Plant Name | James E. Rogers Energy Complex (2721) |
| Plant Address | Duke Power Rd #1002, Cliffside, NC 28024 |
| Utility | Duke Energy Carolinas, LLC (5416) |
| Latitude, Longitude | 35.22, -81.7594 |
| Generation Dates on File | Jan 2001 to Sep 2025 |
| Initial Operation Date | June 1972 |
| Annual Generation | 5.3 TWh |
| Fuel Types | Natural Gas : 51.6% Bituminous Coal : 48.2% |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | SERC |
| Balancing Authority | Duke Energy Carolinas (DUK) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | Broad River |
| Ash Impoundment | Yes Not Lined Operating |
| Transmission / Distribution Owner | Duke Energy Carolinas, LLC (5416) NC |
| Grid Voltage | 525.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name | Other - Please explain in pipeline notes below. |
| Pipeline Notes | PSNC is the owner/operator of the pipeline between Transco and Cliffside. PSNC is an LDC and their parent company is Dominion. |
Generator 5 Details Operating June 1972
| Technology | Conventional Steam Coal |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 621 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 544 MW |
| Winter Capacity | 546 MW |
| Minimum Load | 127 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | June 1972 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
|---|---|
| Energy Source | Bituminous Coal / Natural Gas / Distillate Fuel Oil |
| Startup Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | OVER |
| Pulverized Coal Technology | Yes |
| Subcritical Technology | Yes |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 6 Details Operating December 2012
| Technology | Conventional Steam Coal |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 909.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 844 MW |
| Winter Capacity | 849 MW |
| Minimum Load | 310 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 2012 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
|---|---|
| Energy Source | Bituminous Coal / Natural Gas / Distillate Fuel Oil |
| Startup Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | OVER |
| Pulverized Coal Technology | Yes |
| Supercritical Technology | Yes |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
James E. Rogers Energy Complex Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #244 | Whiting Clean Energy | Whiting, IN | 2.9 TWh |
| #245 | Gila River Power Block 4 | Gila Bend, AZ | 2.9 TWh |
| #246 | High Bridge | St. Paul, MN | 2.9 TWh |
| #247 | GREC | Chouteau, OK | 3.9 TWh |
| #248 | Hidalgo Energy Center | Edinburg, TX | 2.8 TWh |
| #249 | Eastman Cogeneration Facility | Longview, TX | 2.8 TWh |
| #250 | Currant Creek | Mona, UT | 2.8 TWh |
| #251 | Colusa Generating Station | Maxwell, CA | 2.8 TWh |
| #252 | Ingleside Cogeneration | Houston, TX | 2.8 TWh |
| #253 | Dynegy Moss Landing Power Plant Hybrid | Moss Landing, CA | 2.7 TWh |
| #255 | Empire Generating Co LLC | Rensselaer, NY | 2.8 TWh |
| #256 | Jones | Lubbock, TX | 2.7 TWh |
| #257 | Higgins Generating Station | Primm, NV | 2.7 TWh |
| #258 | Harrison County Power Project | Marshall, TX | 2.7 TWh |
| #259 | Mankato Energy Center | Mankato, MN | 2.7 TWh |
| #260 | Silverhawk | North Las Vegas, NV | 2.7 TWh |
| #261 | East River | New York, NY | 2.7 TWh |
| #262 | RS Cogen | Lake Charles, LA | 2.6 TWh |
| #263 | ExxonMobil Baytown Turbine | Baytown, TX | 2.6 TWh |
| #264 | Newark Energy Center | Newark, NJ | 2.6 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding James E. Rogers Energy Complex.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| 232 Long Branch 29 Solar I, LLC | Shelby, NC | 2.1 GWh | 11.3 mi |
| Audrey Solar | Shelby, NC | 4.4 GWh | 10.8 mi |
| Ayrshire | Shelby, NC | 32.4 GWh | 9.2 mi |
| Beetle Solar | Mooresboro, NC | 6.2 GWh | 6.1 mi |
| Broad River Solar, LLC | Mooresboro, NC | 98.0 GWh | 2.3 mi |
| Charlotte Solar | Forest City, NC | 8.8 GWh | 4.6 mi |
| Clear Solar I, LLC | Forest City, NC | 6.0 GWh | 7.7 mi |
| Gamble Solar | Bostic, NC | 5.8 GWh | 9.5 mi |
| Gaston Shoals | Blacksburg, SC | 15.9 GWh | 10.8 mi |
| Innovative Solar 15, LLC | Ellenboro, NC | 2.9 GWh | 6.9 mi |
| Innovative Solar 18, LLC | Bostic, NC | 3.5 GWh | 11.1 mi |
| Lafayette Solar I, LLC | Shelby, NC | 3.3 GWh | 11 mi |
| Old Caroleen Solar Farm | Forest City, NC | 1.9 GWh | 6.1 mi |
| Ruff Solar LLC | Ellenboro, NC | 40.6 GWh | 7 mi |
| Rutherford Farm | Forest City, NC | 136.3 GWh | 4.8 mi |
| Shelby Randolph Road Solar 1, LLC | Shelby, NC | 3.3 GWh | 11.4 mi |
| Shelby Solar Energy Generation Facility | Shelby, NC | 1.3 GWh | 9.5 mi |
| Shelby, NC | Shelby, NC | 39.0 MWh | 10.4 mi |
| Sophie Solar | Mooresboro, NC | 7.5 GWh | 6.8 mi |
| Warbler Holdings | Shelby, NC | 7.2 GWh | 10.2 mi |