Lincoln Combustion
6769 Old Plank Road, Stanley, NC 28164Plant Summary Information
Lincoln Combustion is ranked #20 out of 876 power plants in North Carolina in terms of total annual net electricity generation.
Lincoln Combustion is comprised of 17 generators and generated 10.5 GWh during the 3-month period between March 2026 to June 2026.
| Plant Name | Lincoln Combustion |
|---|---|
| Utility Name | Duke Energy Carolinas, LLC |
| Location | Lincoln County, NC |
| Initial Operation Date | May 1995 |
| Last Update | Jun 2026 |
| Annual Generation | 896.1 GWh |
| Annual Consumption | 9.7 M MMBtu |
| Ranked #811 out of 13,094 Power Plants Nationwide | |
| Ranked #471 out of 2,208 Natural Gas Power Plants Nationwide | |
| Ranked #20 out of 876 North Carolina Power Plants | |
| Ranked #14 out of 27 North Carolina Natural Gas Power Plants | |
| Fuel Types | Natural Gas : 95.0% Distillate Fuel Oil : 5.0% |
Map of Lincoln Combustion
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Lincoln Combustion.
Monthly Net Generation for Lincoln Combustion
Monthly Plant Fuel Consumption for Lincoln Combustion
Lincoln Combustion Details
| Summary Information | |
|---|---|
| Plant Name | Lincoln Combustion (7277) |
| Plant Address | 6769 Old Plank Road, Stanley, NC 28164 |
| Utility | Duke Energy Carolinas, LLC (5416) |
| Latitude, Longitude | 35.4317, -81.0347 |
| Generation Dates on File | Jan 2001 to Jun 2026 |
| Initial Operation Date | May 1995 |
| Annual Generation | 896.1 GWh |
| Fuel Types | Natural Gas : 95.0% Distillate Fuel Oil : 5.0% |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | SERC |
| Balancing Authority | Duke Energy Carolinas (DUK) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | Killian Creek |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Duke Energy Carolinas, LLC (5416) NC |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Local Distribution Company (LDC) | PIEDMONT NATURAL GAS |
| Natural Gas Storage | No |
| Liquefied Natural Gas Storage | No |
Generator 10 Details Operating November 1995
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 109.6 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 73 MW |
| Winter Capacity | 96 MW |
| Minimum Load | 73 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | November 1995 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 75 MW |
| Net Winter Capacity With Natural Gas | 93 MW |
| Net Summer Capacity With Oil | 75 MW |
| Net Winter Capacity With Oil | 93 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator 9 Details Operating November 1995
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 109.6 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 71 MW |
| Winter Capacity | 94 MW |
| Minimum Load | 71 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | November 1995 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | No |
|---|---|
| Net Summer Capacity With Natural Gas | 75 MW |
| Net Winter Capacity With Natural Gas | 93 MW |
| Net Summer Capacity With Oil | 75 MW |
| Net Winter Capacity With Oil | 93 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator 11 Details Operating December 1995
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 109.6 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 73 MW |
| Winter Capacity | 95 MW |
| Minimum Load | 73 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 1995 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 74 MW |
| Net Winter Capacity With Natural Gas | 93 MW |
| Net Summer Capacity With Oil | 74 MW |
| Net Winter Capacity With Oil | 93 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator 12 Details Operating December 1995
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 109.6 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 73 MW |
| Winter Capacity | 94 MW |
| Minimum Load | 73 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 1995 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 75 MW |
| Net Winter Capacity With Natural Gas | 93 MW |
| Net Summer Capacity With Oil | 75 MW |
| Net Winter Capacity With Oil | 93 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator 1 Details Operating May 1995
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 109.6 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 73 MW |
| Winter Capacity | 94 MW |
| Minimum Load | 73 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | May 1995 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 76 MW |
| Net Winter Capacity With Natural Gas | 93 MW |
| Net Summer Capacity With Oil | 76 MW |
| Net Winter Capacity With Oil | 93 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator 2 Details Operating May 1995
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 109.6 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 74 MW |
| Winter Capacity | 96 MW |
| Minimum Load | 74 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | May 1995 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 76 MW |
| Net Winter Capacity With Natural Gas | 93 MW |
| Net Summer Capacity With Oil | 76 MW |
| Net Winter Capacity With Oil | 93 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator 3 Details Operating June 1995
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 109.6 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 73 MW |
| Winter Capacity | 95 MW |
| Minimum Load | 73 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | June 1995 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 75 MW |
| Net Winter Capacity With Natural Gas | 93 MW |
| Net Summer Capacity With Oil | 75 MW |
| Net Winter Capacity With Oil | 93 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator 4 Details Operating June 1995
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 109.6 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 73 MW |
| Winter Capacity | 94 MW |
| Minimum Load | 73 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | June 1995 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 75 MW |
| Net Winter Capacity With Natural Gas | 93 MW |
| Net Summer Capacity With Oil | 75 MW |
| Net Winter Capacity With Oil | 93 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator 5 Details Operating July 1995
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 109.6 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 72 MW |
| Winter Capacity | 93 MW |
| Minimum Load | 72 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | July 1995 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 74 MW |
| Net Winter Capacity With Natural Gas | 93 MW |
| Net Summer Capacity With Oil | 74 MW |
| Net Winter Capacity With Oil | 93 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator 6 Details Operating July 1995
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 109.6 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 72 MW |
| Winter Capacity | 93 MW |
| Minimum Load | 72 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | July 1995 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 73 MW |
| Net Winter Capacity With Natural Gas | 93 MW |
| Net Summer Capacity With Oil | 73 MW |
| Net Winter Capacity With Oil | 93 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator 7 Details Operating September 1995
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 109.6 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 72 MW |
| Winter Capacity | 95 MW |
| Minimum Load | 72 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | September 1995 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 76 MW |
| Net Winter Capacity With Natural Gas | 93 MW |
| Net Summer Capacity With Oil | 76 MW |
| Net Winter Capacity With Oil | 93 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator 8 Details Operating September 1995
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 109.6 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 72 MW |
| Winter Capacity | 94 MW |
| Minimum Load | 72 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | September 1995 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 75 MW |
| Net Winter Capacity With Natural Gas | 93 MW |
| Net Summer Capacity With Oil | 75 MW |
| Net Winter Capacity With Oil | 93 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator 13 Details Operating February 1996
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 109.6 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 72 MW |
| Winter Capacity | 93 MW |
| Minimum Load | 72 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | February 1996 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 74 MW |
| Net Winter Capacity With Natural Gas | 93 MW |
| Net Summer Capacity With Oil | 74 MW |
| Net Winter Capacity With Oil | 93 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator 14 Details Operating February 1996
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 109.6 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 72 MW |
| Winter Capacity | 94 MW |
| Minimum Load | 72 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | February 1996 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 74 MW |
| Net Winter Capacity With Natural Gas | 93 MW |
| Net Summer Capacity With Oil | 74 MW |
| Net Winter Capacity With Oil | 93 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator 15 Details Operating March 1996
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 109.6 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 73 MW |
| Winter Capacity | 94 MW |
| Minimum Load | 73 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | March 1996 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 73 MW |
| Net Winter Capacity With Natural Gas | 93 MW |
| Net Summer Capacity With Oil | 73 MW |
| Net Winter Capacity With Oil | 93 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator 16 Details Operating March 1996
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 109.6 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 73 MW |
| Winter Capacity | 93 MW |
| Minimum Load | 73 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | March 1996 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 73 MW |
| Net Winter Capacity With Natural Gas | 93 MW |
| Net Summer Capacity With Oil | 73 MW |
| Net Winter Capacity With Oil | 93 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator 17 Details Operating December 2024
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 402 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 324 MW |
| Winter Capacity | 400 MW |
| Minimum Load | 130 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2024 |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 324 MW |
| Net Winter Capacity With Natural Gas | 400 MW |
| Net Summer Capacity With Oil | 324 MW |
| Net Winter Capacity With Oil | 400 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Lincoln Combustion Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #461 | Ceredo Generating Station | Huntington, WV | 885.9 GWh |
| #462 | Sayreville Cogeneration Facility | Sayreville, NJ | 878.8 GWh |
| #463 | Ladysmith | Woodford, VA | 948.1 GWh |
| #464 | Delaware City Plant | Delaware City, DE | 1.0 TWh |
| #465 | Tiger Bay | Ft. Meade, FL | 870.8 GWh |
| #466 | Astoria Generating Station | Astoria, NY | 870.9 GWh |
| #467 | Black Dog | Burnsville, MN | 870.0 GWh |
| #468 | Handley | Fort Worth, TX | 864.9 GWh |
| #469 | Cannon Falls Energy Center | Cannon Falls, MN | 864.5 GWh |
| #470 | CFB Power Plant | Point Comfort, TX | 851.5 GWh |
| #472 | Invenergy Nelson Expansion LLC | Rock Falls, IL | 848.7 GWh |
| #473 | Lonesome Creek Station | Alexander, ND | 841.7 GWh |
| #474 | Plant X | Earth, TX | 815.7 GWh |
| #475 | River Road Gen Plant | Vancouver, WA | 812.4 GWh |
| #476 | Washington County Cogeneration Facility | McIntosh, AL | 810.5 GWh |
| #477 | Vandolah Power Station | Wauchula, FL | 845.5 GWh |
| #478 | Berkshire Power | Agawam, MA | 809.5 GWh |
| #479 | Faribault Energy Park | Faribault, MN | 800.1 GWh |
| #480 | EG178 Facility | Snyder, TX | 796.0 GWh |
| #481 | Riverside Generating LLC | Catlettsburg, KY | 793.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Lincoln Combustion.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Auten Road Farm, LLC | Gastonia, NC | 9.3 GWh | 10.5 mi |
| Cowans Ford | Stanley, NC | 124.9 GWh | 4.3 mi |
| DE Solar 1725 Drywall Dr | Mt. Holly, NC | 1.2 GWh | 7.6 mi |
| Freemont Solar Center LLC | Stanley, NC | 8.3 GWh | 2.1 mi |
| Gaston County Renewable Energy Center | Dallas, NC | 23.1 GWh | 8.4 mi |
| Gaston Memorial Hospital | Gastonia, NC | 22.0 MWh | 12.3 mi |
| Gaston Solar Power Plant | Cherryville Township, NC | 45.6 GWh | 9.4 mi |
| Gastonia Prime Power Park | Dallas, NC | 86.0 MWh | 13.3 mi |
| Haynes Farm | Lincolnton, NC | 7.9 GWh | 13 mi |
| High Shoals Hydro (NC) | High Shoals, NC | 2.7 GWh | 9.7 mi |
| High Shoals PV1 | High Shoals, NC | 30.7 GWh | 10.7 mi |
| Huntersville Delivery No 2 | Huntersville, NC | 1.0 MWh | 11.8 mi |
| Lincolnton High School | Lincolnton, NC | 148.0 MWh | 13.2 mi |
| Long Creek Waste Water Plant | Dallas, NC | 320.0 MWh | 10.2 mi |
| Maiden Creek Solar Power Plant | Maiden, NC | 114.8 GWh | 13.4 mi |
| Mariposa Solar Center LLC | Stanley, NC | 8.5 GWh | 5 mi |
| Marshall (NC) | Terrell, NC | 7.7 TWh | 12.1 mi |
| McGuire | Huntersville, NC | 19.0 TWh | 4.8 mi |
| Mountain Island | Mount Holly, NC | 90.0 GWh | 7.3 mi |
| Reventure Park | Charlotte, NC | 26.7 GWh | 9.7 mi |