Lockhart
420 River Street, Lockhart, SC 29364Plant Summary Information
Lockhart is ranked #11 out of 27 hydroelectric power plants in South Carolina in terms of total annual net electricity generation.
Lockhart is comprised of 5 generators and generated 16.0 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Lockhart |
---|---|
Utility Name | Lockhart Power Co |
Location | Union County, SC |
Initial Operation Date | January 1921 |
Last Update | Dec 2024 |
Annual Generation | 70.0 GWh |
Annual Consumption | 253.9 k MMBtu |
Ranked #3,679 out of 12,312 Power Plants Nationwide | |
Ranked #423 out of 1,323 Water Power Plants Nationwide | |
Ranked #51 out of 192 South Carolina Power Plants | |
Ranked #11 out of 27 South Carolina Water Power Plants | |
Fuel Types | Water |
Map of Lockhart
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Lockhart.
Monthly Net Generation for Lockhart
Lockhart Details
Summary Information | |
---|---|
Plant Name | Lockhart (3275) |
Plant Address | 420 River Street, Lockhart, SC 29364 |
Utility | Lockhart Power Co (11118) |
Latitude, Longitude | 34.7792, -81.4561 |
Generation Dates on File | Jan 2001 to Dec 2024 |
Initial Operation Date | January 1921 |
Annual Generation | 70.0 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Carolinas (DUK) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Broad River |
Ash Impoundment | No |
Transmission / Distribution Owner | Lockhart Power Co (11118) SC |
Grid Voltage | 34.50 kV |
Energy Storage | No |
Generator 2 Details Operating January 1921
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 4.2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 4.2 MW |
Winter Capacity | 4.2 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1921 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator HY1 Details Operating January 1921
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 4.2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 4.2 MW |
Winter Capacity | 4.2 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1921 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator HY3 Details Operating January 1921
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 4.2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 4.2 MW |
Winter Capacity | 4.2 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1921 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator HY4 Details Operating January 1921
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 4.2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 4.2 MW |
Winter Capacity | 4.2 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1921 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Generator HY5 Details Operating January 1921
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 1.2 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.2 MW |
Winter Capacity | 1.2 MW |
Minimum Load | 0.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1921 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Lockhart Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#413 | Arrowrock Hydroelectric Project | Boise, ID | 73.0 GWh |
#414 | London | Handley, WV | 72.9 GWh |
#415 | William F Matson Generating Station | Huntingdon, PA | 72.7 GWh |
#416 | Tallulah Falls | Tallulah Falls, GA | 72.0 GWh |
#417 | Navajo Dam | Farmington, NM | 72.0 GWh |
#418 | Hardy | Newaygo, MI | 71.6 GWh |
#419 | Shoshone Falls | Twin Falls, ID | 71.3 GWh |
#420 | Allegheny Hydro No 8 | Adrian, PA | 70.6 GWh |
#421 | Copco 1 | Hornbrook, CA | 70.4 GWh |
#422 | Boysen | Thermopolis, WY | 70.3 GWh |
#424 | Rhodhiss | Rhodhiss, NC | 69.8 GWh |
#425 | Whitney | Clifton, TX | 69.4 GWh |
#426 | Johnson 2 | Lexington, NE | 69.3 GWh |
#427 | Ocoee 1 | Benton, TN | 69.2 GWh |
#428 | Prospect | Prospect, NY | 69.1 GWh |
#429 | Post Falls | Post Falls, ID | 69.1 GWh |
#430 | Sheldon Springs Hydroelectric | Sheldon Springs, VT | 67.8 GWh |
#431 | Marmet | Marmet, WV | 67.4 GWh |
#432 | Keowee | Seneca, SC | 67.0 GWh |
#433 | Cougar | Lowell, OR | 66.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Lockhart.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
99 Islands | Blacksburg, SC | 36.5 GWh | 17.6 mi |
Atood II | Cowpens, SC | 3.8 GWh | 26.5 mi |
Broad River Energy Center | Gaffney, SC | 683.9 GWh | 21.8 mi |
Catawba | York, SC | 19.2 TWh | 28.9 mi |
Cherokee County Cogen | Gaffney, SC | 647.2 GWh | 22.1 mi |
City West Diesel Plant | Union, SC | 34.0 MWh | 11.5 mi |
Cleveland Cnty Generating Facility | Kings Mountain, NC | 712.0 GWh | 27.1 mi |
Clifton Dam 3 Power Station | Converse, SC | 3.6 GWh | 26.1 mi |
Gaston Shoals | Blacksburg, SC | 15.9 GWh | 26.1 mi |
Limelight Solar II LLC | Spartanburg, SC | 2.8 GWh | 28.1 mi |
Midway Green Solar | Union, SC | 20.6 GWh | 25 mi |
Mill Creek (SC) | Blacksburg, SC | 31.9 GWh | 26.3 mi |
Mohea Solar Energy Center, LLC | Gaffney, SC | 8.2 GWh | 23.4 mi |
Neal Shoals | Union, SC | 11.7 GWh | 8 mi |
Roper Farm, LLC | Grover, NC | 9.6 GWh | 28.2 mi |
Sediver | York, SC | 78.0 MWh | 19.9 mi |
Thermal Kem | Rock Hill, SC | 70.0 MWh | 23 mi |
Union Renewable Energy Facility | Enoree, SC | 19.0 GWh | 23.5 mi |
Upper Pacolet Hydro | Pacolet, SC | 4.0 GWh | 19.1 mi |
Webb Forging | Carlisle, SC | 90.0 MWh | 15.5 mi |