Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Riverview Energy Center | Gilroy Energy Center for Riverview | Antioch, CA | California Independent System Operator (CISO) | 21.9 GWh | Apr 2003 | Dec 2024 | Natural Gas |
| Agua Mansa Power Plant | E I Colton LLC | Colton, CA | California Independent System Operator (CISO) | 8.8 GWh | May 2003 | Dec 2024 | Natural Gas |
| Border Hybrid Energy Center | CalPeak Power, LLC | San Diego, CA | California Independent System Operator (CISO) | 14.8 GWh | Oct 2001 | Dec 2024 | Natural Gas |
| Sonoma Central Landfill Phase II | County of Sonoma Dept of Trnsp | Petaluma, CA | California Independent System Operator (CISO) | 5.0 GWh | May 1996 | Dec 2024 | Landfill Gas |
| Sonoma Central Landfill Phase I | County of Sonoma Dept of Trnsp | Petaluma, CA | California Independent System Operator (CISO) | 5.6 GWh | Jun 1993 | Dec 2024 | Landfill Gas |
| Los Esteros Critical Energy Center | Los Esteros Critical Energy Facility LLC | San Jose, CA | California Independent System Operator (CISO) | 140.4 GWh | Jan 2003 | Oct 2025 | Natural Gas |
| Mountain View I & II | AES Distributed Energy | North Palm Springs, CA | California Independent System Operator (CISO) | 286.4 GWh | May 2001 | Oct 2025 | Wind |
| Hanford Energy Park Peaker | MRP San Joaquin Energy LLC. | Hanford, CA | California Independent System Operator (CISO) | 6.1 GWh | Aug 2001 | Sep 2025 | Natural Gas |
| Oasis Wind | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 238.4 GWh | Nov 2004 | Dec 2024 | Wind |
| Indigo Energy Facility | Diamond Generating Corporation | North Palm Springs, CA | California Independent System Operator (CISO) | 24.6 GWh | Jun 2001 | Dec 2024 | Natural Gas |
| CalPeak Power Vaca Dixon Peaker Plant | CalPeak Power, LLC | Vacaville, CA | California Independent System Operator (CISO) | 3.5 GWh | May 2002 | Dec 2024 | Natural Gas |
| CalPeak Power Panoche Peaker Plant | CalPeak Power, LLC | Firebaugh, CA | California Independent System Operator (CISO) | 10.5 GWh | Nov 2001 | Dec 2024 | Natural Gas |
| Kumeyaay Wind | Leeward Asset Management, LLC | Campo, CA | California Independent System Operator (CISO) | 127.2 GWh | Nov 2005 | Dec 2024 | Wind |
| Cuyamaca Peak Energy Plant | San Diego Gas & Electric Co | El Cajon, CA | California Independent System Operator (CISO) | 5.9 GWh | Apr 2002 | Dec 2024 | Natural Gas |
| CalPeak Power Enterprise Peaker Plant | CalPeak Power, LLC | Escondido, CA | California Independent System Operator (CISO) | 6.1 GWh | Oct 2001 | Dec 2024 | Natural Gas |
| Pastoria Energy Facility, LLC | Calpine Corp - Pastoria Energy Center | Lebec, CA | California Independent System Operator (CISO) | 3.8 TWh | Apr 2005 | Oct 2025 | Natural Gas |
| High Desert Power Plant | MRP Generation Holdings, LLC | Victorville, CA | California Independent System Operator (CISO) | 3.5 TWh | Mar 2003 | Oct 2025 | Natural Gas |
| Goose Haven Energy Center | Goose Haven Energy Center | Suisun, CA | California Independent System Operator (CISO) | 13.0 GWh | Dec 2002 | Dec 2024 | Natural Gas |
| Lambie Energy Center | Gilroy Energy Center LLC | Suisun, CA | California Independent System Operator (CISO) | 9.7 GWh | Dec 2002 | Dec 2024 | Natural Gas |
| Escondido Energy Center | Wellhead Services, Inc | Escondido, CA | California Independent System Operator (CISO) | 9.4 GWh | Dec 2013 | Dec 2024 | Natural Gas |
| Chula Vista Energy Center | Wellhead Services, Inc | Chula Vista, CA | California Independent System Operator (CISO) | 1.8 GWh | Apr 2001 | Nov 2024 | Natural Gas |
| Creed Energy Center | Creed Energy Center LLC | Suisun, CA | California Independent System Operator (CISO) | 6.3 GWh | Dec 2002 | Dec 2024 | Natural Gas |
| Bear Valley Power Plant | Bear Valley Electric Service | Big Bear Lake, CA | California Independent System Operator (CISO) | 307.0 MWh | Dec 2004 | Dec 2024 | Natural Gas |
| Gilroy Peaking Energy Center | Calpine Gilroy Cogen LP | Gilroy, CA | California Independent System Operator (CISO) | 23.3 GWh | Oct 2001 | Dec 2024 | Natural Gas |
| Henrietta Peaker | MRP San Joaquin Energy LLC. | Lemoore, CA | California Independent System Operator (CISO) | 4.2 GWh | May 2002 | Oct 2025 | Natural Gas |
| Clearwater Power Plant | City of Riverside - (CA) | Corona, CA | California Independent System Operator (CISO) | 10.3 GWh | Feb 2005 | Dec 2024 | Natural Gas |
| Ameresco Santa Cruz Energy | AMERESCO Santa Cruz Energy LLC | Watsonville, CA | California Independent System Operator (CISO) | 16.5 GWh | Dec 2005 | Dec 2024 | Landfill Gas |
| King City Peaking | Calpine Corp-King City | King City, CA | California Independent System Operator (CISO) | 11.9 GWh | Mar 2002 | Dec 2024 | Natural Gas |
| Buena Vista Energy LLC | Leeward Asset Management, LLC | Byron, CA | California Independent System Operator (CISO) | 89.6 GWh | Nov 2006 | Dec 2024 | Wind |
| Larkspur Energy Facility | Diamond Generating Corporation | San Diego, CA | California Independent System Operator (CISO) | 24.4 GWh | Jun 2001 | Dec 2024 | Natural Gas |
| Diablo Winds LLC | Sequitur Renewables, LLC | Livermore, CA | California Independent System Operator (CISO) | 20.5 GWh | Nov 2004 | Dec 2024 | Wind |
| Helzel & Schwarzhoff 86 | Wind Stream Operations LLC | Tehachapi, CA | California Independent System Operator (CISO) | 3.3 GWh | Nov 1986 | Dec 2024 | Wind |
| ZCO | Wind Stream Operations LLC | Tehachapi, CA | California Independent System Operator (CISO) | 1.4 GWh | Nov 1985 | Dec 2024 | Wind |
| Yuba City Energy Center | Calpine Corp-Yuba City | Yuba City, CA | California Independent System Operator (CISO) | 39.1 GWh | Jul 2002 | Dec 2024 | Natural Gas |
| Genesis Solar Energy Project | Genesis Solar LLC | Blythe, CA | California Independent System Operator (CISO) | 625.0 GWh | Oct 2013 | Oct 2025 | Solar |
| Sentinel Energy Center, LLC | Sentinel Energy Center LLC | Desert Hot Springs, CA | California Independent System Operator (CISO) | 138.4 GWh | Apr 2013 | Oct 2025 | Natural Gas |
| Caltech Central | Bloom Energy 2009 PPA | Pasadena, CA | California Independent System Operator (CISO) | 8.7 GWh | Oct 2010 | Dec 2024 | Natural Gas |
| Yolo County Solar Project | Yolo County of | Woodland, CA | California Independent System Operator (CISO) | 534.0 MWh | Nov 2010 | Dec 2023 | Solar |
| Mariposa Energy Project | Diamond Generating Corporation | Byron, CA | California Independent System Operator (CISO) | 45.4 GWh | Sep 2012 | Sep 2025 | Natural Gas |
| Mountain View IV | AES Distributed Energy | North Palm Springs, CA | California Independent System Operator (CISO) | 186.8 GWh | Jan 2012 | Dec 2024 | Wind |
| Imperial Solar Energy Center West | CSOLAR IV West LLC | Seeley, CA | California Independent System Operator (CISO) | 373.6 GWh | Mar 2016 | Dec 2024 | Solar |
| Stroud Solar Station | Pacific Gas & Electric Co. | Helm, CA | California Independent System Operator (CISO) | 25.0 GWh | Aug 2011 | Oct 2024 | Solar |
| Manzana Wind LLC | Avangrid Power LLC | Rosamond, CA | California Independent System Operator (CISO) | 543.7 GWh | Nov 2012 | Dec 2024 | Wind |
| Solar Borrego I | NRG Solar Borrego I | Borrego Springs, CA | California Independent System Operator (CISO) | 62.2 GWh | Jan 2013 | Dec 2024 | Solar |
| California Valley Solar Ranch | Clearway Energy Operating LLC | California Valley, CA | California Independent System Operator (CISO) | 597.7 GWh | Aug 2012 | Dec 2024 | Solar |
| Solar Photovoltaic Project #42 | Southern California Edison Co | Tulare, CA | California Independent System Operator (CISO) | 7.6 GWh | Oct 2012 | Dec 2024 | Solar |
| AV Solar Ranch One | AV Solar Ranch 1 LLC | Lancaster, CA | California Independent System Operator (CISO) | 571.7 GWh | Jul 2014 | Oct 2025 | Solar |
| Five Points Solar Station | Pacific Gas & Electric Co. | Five Points, CA | California Independent System Operator (CISO) | 15.4 GWh | Aug 2011 | Dec 2024 | Solar |
| Avenal Park | Avenal Solar Holdings LLC | Avenal, CA | California Independent System Operator (CISO) | 9.5 GWh | Jul 2011 | Dec 2024 | Solar |
| Imperial Solar Energy Center South | CSOLAR IV South LLC | Calexico, CA | California Independent System Operator (CISO) | 264.3 GWh | Oct 2013 | Dec 2024 | Solar |
| Sun City Project LLC | Avenal Solar Holdings LLC | Avenal, CA | California Independent System Operator (CISO) | 33.9 GWh | Jul 2011 | Dec 2024 | Solar |
| Agua Caliente Solar Project | Agua Caliente Solar | Dateland, AZ | California Independent System Operator (CISO) | 543.7 GWh | Apr 2012 | Oct 2025 | Solar |
| Sand Drag LLC | Avenal Solar Holdings LLC | Avenal, CA | California Independent System Operator (CISO) | 28.2 GWh | Jul 2011 | Dec 2024 | Solar |
| Bolthouse S&P and Rowen Farms Solar | MMA WBF Power LP | Palmdale, CA | California Independent System Operator (CISO) | 67.0 MWh | Oct 2008 | Apr 2024 | Solar |
| UCI Facilities Management Central Plant | University of California Irvine | Irvine, CA | California Independent System Operator (CISO) | 112.6 GWh | Jun 2007 | Oct 2025 | Natural Gas |
| Imperial Valley Solar, LLC | Imperial Valley Solar, LLC | Calexico, CA | California Independent System Operator (CISO) | 443.5 GWh | Oct 2013 | Dec 2024 | Solar |
| Hatchet Ridge Wind Project | Pattern Operators LP | Burney, CA | California Independent System Operator (CISO) | 268.2 GWh | Nov 2010 | Dec 2024 | Wind |
| Ivanpah 1 | NRG Energy Services | Nipton, CA | California Independent System Operator (CISO) | 187.4 GWh | Nov 2013 | Oct 2025 | Solar : 97.0% Natural Gas : 3.0% |
| Ivanpah 2 | NRG Energy Services | Nipton, CA | California Independent System Operator (CISO) | 250.9 GWh | Nov 2013 | Oct 2025 | Solar : 95.5% Natural Gas : 4.5% |
| Solar Blythe LLC | NRG Solar Blythe | Blythe, CA | California Independent System Operator (CISO) | 41.8 GWh | Nov 2009 | Dec 2024 | Solar |
| CM10 | Consolidated Edison Development Inc. | Boulder City, NV | California Independent System Operator (CISO) | 18.0 GWh | Nov 2008 | Dec 2024 | Solar |
| CalRenew-1 | CalRenew-1 LLC | Mendota, CA | California Independent System Operator (CISO) | 1.3 GWh | Mar 2010 | Dec 2024 | Solar |
| El Cajon Energy Center | Wellhead Services, Inc | El Cajon, CA | California Independent System Operator (CISO) | 9.0 GWh | May 2010 | Dec 2024 | Natural Gas |
| Dillon Wind LLC | Avangrid Power LLC | North Palm Springs, CA | California Independent System Operator (CISO) | 142.4 GWh | Mar 2008 | Dec 2024 | Wind |
| Panoche Energy Center | Panoche Energy Center, LLC | Firebaugh, CA | California Independent System Operator (CISO) | 878.0 GWh | May 2009 | Oct 2025 | Natural Gas |
| CSU Fresno Solar Project | MMA Fresno Power LP | Fresno, CA | California Independent System Operator (CISO) | 1.4 GWh | Nov 2007 | Dec 2024 | Solar |
| Ivanpah 3 | NRG Energy Services | Nipton, CA | California Independent System Operator (CISO) | 235.6 GWh | Nov 2013 | Oct 2025 | Solar : 96.2% Natural Gas : 3.8% |
| Shiloh Wind Project 2 LLC | EDF Renewable Asset Holdings, Inc. | Birds Landing, CA | California Independent System Operator (CISO) | 393.1 GWh | Dec 2008 | Dec 2024 | Wind |
| Vaca Dixon Solar Station | Pacific Gas & Electric Co. | Vacaville, CA | California Independent System Operator (CISO) | 3.2 GWh | Nov 2009 | Dec 2024 | Solar |
| Canyon Power Plant | City of Anaheim - (CA) | Anaheim, CA | California Independent System Operator (CISO) | 16.1 GWh | Jul 2011 | Oct 2025 | Natural Gas |
| SunEdison Walmart Apple Valley DC | SunE M5 Holdings LLC | Apple Valley, CA | California Independent System Operator (CISO) | 716.0 MWh | Feb 2009 | Dec 2024 | Solar |
| Chuckawalla Valley State Prison | SunE CPA CDC1 LLC | Blythe, CA | California Independent System Operator (CISO) | 1.4 GWh | May 2006 | Dec 2024 | Solar |
| SunEdison Anheuser Busch Fairfield | SunE M5 Holdings LLC | Fairfield, CA | California Independent System Operator (CISO) | 1.2 GWh | Nov 2008 | Dec 2024 | Solar |
| Kohls San Bernardino Solar Facility | SunE WF3 KHL A Holdings, LLC | San Bernardino, CA | California Independent System Operator (CISO) | 944.0 MWh | Oct 2007 | Dec 2024 | Solar |
| SunEdison Procter & Gamble Oxnard | SunE U6 Holdings LLC | Oxnard, CA | California Independent System Operator (CISO) | 1.6 GWh | Sep 2009 | Dec 2024 | Solar |
| SunEdison Ironwood State Prison | SunE CPA CDC2 LLC | Blythe, CA | California Independent System Operator (CISO) | 996.0 MWh | Apr 2008 | Dec 2024 | Solar |
| Walgreens Woodland Distribution Center | SunE WG45 Woodland LLC | Woodland, CA | California Independent System Operator (CISO) | 908.0 MWh | Jul 2007 | Dec 2024 | Solar |
| Mariani Packing Vacaville Solar | SunE U6 Holdings LLC | Vacaville, CA | California Independent System Operator (CISO) | 1.3 GWh | Oct 2008 | Dec 2024 | Solar |
| SunEdison Walgreens Moreno Valley | SunE WG113 Moreno Valley LLC | Moreno Valley, CA | California Independent System Operator (CISO) | 900.0 MWh | Aug 2007 | Dec 2024 | Solar |
| Ameresco Chiquita Canyon | AMERESCO Chiquita Canyon LLC | Castaic, CA | California Independent System Operator (CISO) | 2.1 GWh | Oct 2010 | Dec 2024 | Landfill Gas |
| Ameresco Ox Mountain | AMERESCO Ox Mountain Energy LLC | Half Moon Bay, CA | California Independent System Operator (CISO) | 82.3 GWh | Nov 2008 | Oct 2025 | Landfill Gas |
| Mojave Solar Project | Mojave Solar LLC | Hinkley, CA | California Independent System Operator (CISO) | 591.1 GWh | Nov 2014 | Oct 2025 | Solar |
| Panoche Valley Solar Farm | Consolidated Edison Development Inc. | Paicines, CA | California Independent System Operator (CISO) | 279.4 GWh | Dec 2017 | Oct 2025 | Solar |
| Ameresco Keller Canyon | AMERESCO Keller Canyon LLC | Bay Point, CA | California Independent System Operator (CISO) | 19.1 GWh | Jun 2009 | Dec 2024 | Landfill Gas |
| Garnet Wind Energy Center | Terra-Gen Operating Co-Wind | North Palm Springs, CA | California Independent System Operator (CISO) | 11.9 GWh | May 2009 | Dec 2024 | Wind |
| Alpine Solar | Alpine BESS LLC | Lancaster, CA | California Independent System Operator (CISO) | 118.8 GWh | Jan 2013 | Dec 2024 | Solar |
| Alta Wind Energy Center V | Alta Wind V, LLC | Mojave, CA | California Independent System Operator (CISO) | 288.4 GWh | Mar 2011 | Dec 2024 | Wind |
| Alta Wind Energy Center IV | Alta Wind IV, LLC | Mojave, CA | California Independent System Operator (CISO) | 193.4 GWh | Mar 2011 | Dec 2024 | Wind |
| Alta Wind Energy Center III | Alta Wind III, LLC | Mojave, CA | California Independent System Operator (CISO) | 363.2 GWh | Jan 2011 | Dec 2024 | Wind |
| Alta Wind Energy Center II | Alta Wind II, LLC | Mojave, CA | California Independent System Operator (CISO) | 364.6 GWh | Dec 2010 | Dec 2024 | Wind |
| Alta Wind Energy Center I | Alta Wind I, LLC | Mojave, CA | California Independent System Operator (CISO) | 434.7 GWh | Dec 2010 | Dec 2024 | Wind |
| Marsh Landing Generating Station | Marsh Landing LLC | Antioch, CA | California Independent System Operator (CISO) | 17.7 GWh | Apr 2013 | Oct 2025 | Natural Gas |
| G2 Energy Ostrom Road LLC | G2 Energy LLC | Wheatland, CA | California Independent System Operator (CISO) | 29.0 GWh | Jan 2009 | Dec 2024 | Landfill Gas |
| Gap Pacific Distribution Center | MN8 Energy LLC | Fresno, CA | California Independent System Operator (CISO) | 5.4 GWh | Sep 2008 | Dec 2024 | Solar |
| CM48 | Consolidated Edison Development Inc. | Boulder City, NV | California Independent System Operator (CISO) | 94.3 GWh | May 2010 | Dec 2024 | Solar |
| Orange Grove Peaking Facility | Orange Grove Energy LP | Pala, CA | California Independent System Operator (CISO) | 23.6 GWh | May 2010 | Dec 2024 | Natural Gas |
| FPL Energy Montezuma Winds LLC | FPL Energy Montezuma Wind | Birds Landing, CA | California Independent System Operator (CISO) | 85.4 GWh | Oct 2010 | Dec 2024 | Wind |
| Calabasas Gas to Energy Facility | Los Angeles County Sanitation | Agoura, CA | California Independent System Operator (CISO) | 36.3 GWh | Jun 2010 | Dec 2024 | Landfill Gas |
| Midway Peaking LLC | CalPeak Power, LLC | Firebaugh, CA | California Independent System Operator (CISO) | 15.7 GWh | Apr 2009 | Dec 2024 | Natural Gas |
| Terra-Gen VG Wind LLC | Terra-Gen Operating Co-Wind | Tehachapi, CA | California Independent System Operator (CISO) | 7.6 GWh | Dec 1983 | Jun 2024 | Wind |
Summary of Power Plants By State
Figures are based on October 2025 generation numbers.| State | Rank | Active Plants | Oct 2025 Generation |
|---|---|---|---|
| Alabama | # 7 | 76 | 11,041.22 GWh |
| Alaska | # 49 | 144 | 484.88 GWh |
| Arizona | # 11 | 184 | 9,400.73 GWh |
| Arkansas | # 24 | 116 | 5,068.08 GWh |
| California | # 4 | 1,734 | 16,078.58 GWh |
| Colorado | # 30 | 302 | 4,272.03 GWh |
| Connecticut | # 38 | 166 | 3,176.41 GWh |
| Delaware | # 48 | 33 | 521.87 GWh |
| District of Columbia | # 51 | 16 | 15.93 GWh |
| Florida | # 2 | 321 | 22,593.36 GWh |
| Georgia | # 6 | 262 | 11,885.65 GWh |
| Hawaii | # 47 | 73 | 845.96 GWh |
| Idaho | # 44 | 147 | 1,448.54 GWh |
| Illinois | # 5 | 382 | 15,897.55 GWh |
| Indiana | # 12 | 211 | 9,138.69 GWh |
| Iowa | # 18 | 292 | 6,552.01 GWh |
| Kansas | # 31 | 187 | 4,138.18 GWh |
| Kentucky | # 23 | 60 | 5,089.89 GWh |
| Louisiana | # 14 | 86 | 8,618.27 GWh |
| Maine | # 45 | 215 | 1,114.12 GWh |
| Maryland | # 35 | 203 | 3,540.16 GWh |
| Massachusetts | # 41 | 648 | 1,963.73 GWh |
| Michigan | # 9 | 272 | 10,045.59 GWh |
| Minnesota | # 27 | 765 | 4,687.69 GWh |
| Mississippi | # 20 | 57 | 6,085.50 GWh |
| Missouri | # 21 | 127 | 5,515.65 GWh |
| State | Rank | Active Plants | Oct 2025 Generation |
|---|---|---|---|
| Montana | # 40 | 71 | 2,455.83 GWh |
| Nebraska | # 36 | 129 | 3,412.31 GWh |
| Nevada | # 33 | 114 | 3,578.95 GWh |
| New Hampshire | # 43 | 60 | 1,661.03 GWh |
| New Jersey | # 25 | 393 | 4,903.52 GWh |
| New Mexico | # 37 | 143 | 3,370.59 GWh |
| New York | # 8 | 956 | 10,108.60 GWh |
| North Carolina | # 13 | 906 | 9,082.37 GWh |
| North Dakota | # 34 | 60 | 3,554.85 GWh |
| Ohio | # 10 | 197 | 9,920.42 GWh |
| Oklahoma | # 17 | 142 | 7,167.46 GWh |
| Oregon | # 26 | 275 | 4,755.34 GWh |
| Pennsylvania | # 3 | 256 | 16,669.60 GWh |
| Rhode Island | # 46 | 100 | 886.30 GWh |
| South Carolina | # 15 | 208 | 8,061.53 GWh |
| South Dakota | # 42 | 52 | 1,892.35 GWh |
| Tennessee | # 22 | 88 | 5,198.50 GWh |
| Texas | # 1 | 947 | 48,837.92 GWh |
| Utah | # 39 | 125 | 3,044.05 GWh |
| Vermont | # 50 | 117 | 151.45 GWh |
| Virginia | # 19 | 239 | 6,515.03 GWh |
| Washington | # 16 | 137 | 7,971.98 GWh |
| West Virginia | # 29 | 39 | 4,608.16 GWh |
| Wisconsin | # 28 | 250 | 4,687.23 GWh |
| Wyoming | # 32 | 70 | 3,770.47 GWh |