7800 Rochester Hwy, Seneca, SC 29672Plant Summary Information
Oconee is ranked #5 out of 13,081 power plants nationwide in terms of total annual net electricity generation.
Oconee is comprised of 3 generators and generated 5.4 TWh during the 3-month period between February 2026 to May 2026.
| Plant Name | Oconee |
|---|---|
| Utility Name | Duke Energy Carolinas, LLC |
| Location | Oconee County, SC |
| Initial Operation Date | July 1973 |
| Last Update | May 2026 |
| Annual Generation | 22.0 TWh |
| Annual Consumption | 250.0 M MMBtu |
| Ranked #5 out of 13,081 Power Plants Nationwide | |
| Ranked #5 out of 54 Nuclear Power Plants Nationwide | |
| Ranked #1 out of 202 South Carolina Power Plants | |
| Ranked #1 out of 4 South Carolina Nuclear Power Plants | |
| Fuel Types | Nuclear |
Map of Oconee
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Oconee.
Monthly Net Generation for Oconee
Monthly Plant Fuel Consumption for Oconee
Oconee Details
| Summary Information | |
|---|---|
| Plant Name | Oconee (3265) |
| Plant Address | 7800 Rochester Hwy, Seneca, SC 29672 |
| Utility | Duke Energy Carolinas, LLC (5416) |
| Latitude, Longitude | 34.7939, -82.8986 |
| Generation Dates on File | Jan 2001 to May 2026 |
| Initial Operation Date | July 1973 |
| Annual Generation | 22.0 TWh |
| Fuel Types | Nuclear |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | SERC |
| Balancing Authority | Duke Energy Carolinas (DUK) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | Keowee River |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Duke Energy Carolinas, LLC (5416) SC |
| Grid Voltage | 500.00 kV |
| Energy Storage | No |
Generator 1 Details Operating July 1973
| Technology | Nuclear |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 886.7 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 861.9 MW |
| Winter Capacity | 890 MW |
| Minimum Load | 847 MW |
| Uprate/Derate Completed | Yes |
| Uprate Or Derate Completed | May 2025 |
| Status | Operating |
|---|---|
| First Operation Date | July 1973 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Nuclear |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | OVER |
| Multiple Fuels | No |
| Cofire Fuels | No |
Generator 3 Details Operating December 1974
| Technology | Nuclear |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 893.3 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 872.9 MW |
| Winter Capacity | 901 MW |
| Minimum Load | 859 MW |
| Uprate/Derate Completed | Yes |
| Uprate Or Derate Completed | May 2025 |
| Status | Operating |
|---|---|
| First Operation Date | December 1974 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Nuclear |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | OVER |
| Multiple Fuels | No |
| Cofire Fuels | No |
Generator 2 Details Operating September 1974
| Technology | Nuclear |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 886.7 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 865.1 MW |
| Winter Capacity | 897 MW |
| Minimum Load | 848 MW |
| Uprate/Derate Completed | Yes |
| Uprate Or Derate Completed | May 2025 |
| Status | Operating |
|---|---|
| First Operation Date | September 1974 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Nuclear |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | OVER |
| Multiple Fuels | No |
| Cofire Fuels | No |
Oconee Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Nuclear.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1 | Vogtle | Waynesboro, GA | 37.0 TWh |
| #2 | Palo Verde | Wintersburg, AZ | 31.2 TWh |
| #3 | Browns Ferry | Decatur, AL | 30.8 TWh |
| #4 | Peach Bottom | Delta, PA | 22.0 TWh |
| #6 | South Texas Project | Wadsworth, TX | 20.6 TWh |
| #7 | Comanche Peak | Glen Rose, TX | 20.0 TWh |
| #8 | Watts Bar Nuclear Plant | Spring City, TN | 19.7 TWh |
| #9 | Byron Generating Station | Byron, IL | 19.6 TWh |
| #10 | Braidwood Generation Station | Braceville, IL | 19.6 TWh |
| #11 | Limerick | Sanatoga, PA | 19.4 TWh |
| #12 | TalenEnergy Susquehanna | Berwick, PA | 19.3 TWh |
| #13 | PSEG Salem Generating Station | Hancocks Bridge, NJ | 19.3 TWh |
| #14 | McGuire | Huntersville, NC | 19.0 TWh |
| #15 | Donald C Cook | Bridgman, MI | 18.5 TWh |
| #16 | LaSalle Generating Station | Marseilles, IL | 18.5 TWh |
| #17 | Diablo Canyon | Avila Beach, CA | 18.4 TWh |
| #18 | Catawba | York, SC | 18.3 TWh |
| #19 | Millstone | Waterford, CT | 17.2 TWh |
| #20 | Sequoyah | Soddy Daisy, TN | 17.1 TWh |
| #21 | North Anna | Mineral, VA | 15.8 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Oconee.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Ace Solar | Piedmont, SC | 2.0 GWh | 21.7 mi |
| Adams | Piedmont, SC | 4.3 GWh | 22.1 mi |
| Anderson (SC) | Anderson, SC | 4.2 GWh | 24.3 mi |
| Bluebird Solar SC LLC | Pendleton, SC | 6.6 GWh | 16.2 mi |
| Central Energy Facility | Clemson, SC | 2.0 MWh | 8.6 mi |
| Duke Energy CHP at Clemson University | Clemson, SC | 103.1 GWh | 9.1 mi |
| Franklin Milliken | Lavonia, GA | 6.4 GWh | 26.9 mi |
| Keowee | Seneca, SC | 44.3 GWh | 0.7 mi |
| Pelzer Lower | Williamston, SC | 3.8 GWh | 28.4 mi |
| Pelzer Solar I | Pelzer, SC | 2.0 GWh | 24.4 mi |
| Pelzer Upper | Petzer, SC | 3.8 GWh | 27.3 mi |
| Piedmont Hydro Power Project | Piedmont, SC | 4.8 GWh | 25.6 mi |
| Saluda Dam | Greenville, SC | 5.2 GWh | 23.9 mi |
| Seneca City of | Seneca, SC | 728.0 MWh | 8 mi |
| Tallulah Falls | Tallulah Falls, GA | 106.2 GWh | 28.5 mi |
| Tugalo | Tallulah Falls, GA | 93.9 GWh | 26.3 mi |
| Valenite | Westminster, SC | 105.0 MWh | 12.3 mi |
| White Horse Solar A | Greenville, SC | 3.3 GWh | 28.4 mi |
| Whitt Solar | Piedmont, SC | 3.7 GWh | 21.8 mi |
| Yonah | Toccoa, GA | 35.4 GWh | 26.3 mi |