Whistling Duck I
9350 NE State Road, Williston, FL 32696Plant Summary Information
Whistling Duck I is ranked #179 out of 220 solar farms in Florida in terms of total annual net electricity generation.
Whistling Duck I generated 12.5 GWh during the 3-month period between October 2025 to January 2026.
| Plant Name | Whistling Duck I |
|---|---|
| Utility Name | Origis Energy USA, Inc |
| Location | Levy County, FL |
| Initial Operation Date | Not Available |
| Last Update | Jan 2026 |
| Annual Generation | 12.5 GWh |
| Annual Consumption | 42.7 k MMBtu |
| Ranked #5,881 out of 12,629 Power Plants Nationwide | |
| Ranked #1,685 out of 6,477 Solar Power Plants Nationwide | |
| Ranked #274 out of 326 Florida Power Plants | |
| Ranked #179 out of 220 Florida Solar Power Plants | |
| Fuel Types | Solar |
Map of Whistling Duck I
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Whistling Duck I.
Monthly Net Generation for Whistling Duck I
Monthly Plant Fuel Consumption for Whistling Duck I
Whistling Duck I Details
| Summary Information | |
|---|---|
| Plant Name | Whistling Duck I (68595) |
| Plant Address | 9350 NE State Road, Williston, FL 32696 |
| Utility | Origis Energy USA, Inc (58764) |
| Latitude, Longitude | 29.47222, -82.43088 |
| Generation Dates on File | Dec 2025 to Jan 2026 |
| Initial Operation Date | Not Available |
| Annual Generation | 12.5 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | Duke Energy Florida Inc (FPC) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | NA |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Duke Energy Florida, LLC (6455) FL |
| Grid Voltage | 69.00 kV |
| Energy Storage | |
Whistling Duck I Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1675 | Wonderful Orchards - Westside | Lost Hills, CA | 12.7 GWh |
| #1676 | Indianapolis Motor Speedway Solar PV | Indianapolis, IN | 12.7 GWh |
| #1677 | Swamp Cabbage | LaBelle, FL | 12.7 GWh |
| #1678 | Cooperative Solar One | Winchester, KY | 12.7 GWh |
| #1679 | Tequesquite Landfill Solar PV Project | Riverside, CA | 12.7 GWh |
| #1680 | GDIM 2, LLC | North Smithfield, RI | 12.6 GWh |
| #1681 | Hodag Solar | Rhinelander, WI | 12.6 GWh |
| #1682 | Winslow PV - BD Solar 2 LLC | Winslow, ME | 12.6 GWh |
| #1683 | Alexis Solar, LLC | Encino, TX | 12.6 GWh |
| #1684 | Fort Rucker Solar Array | Fort Rucker, AL | 12.5 GWh |
| #1686 | Danville | Danville, VA | 12.5 GWh |
| #1687 | Crawfordsville 2 Solar Park | Crawfordsville, IN | 12.5 GWh |
| #1688 | Scottsburg Solar Park | Scottsburg, IN | 12.5 GWh |
| #1689 | Santee Solar Partners, LLC | Stanford Township, MN | 12.4 GWh |
| #1690 | Volkswagen Solar System | Chattanooga, TN | 12.4 GWh |
| #1691 | Hampton Solar I | Hampton, SC | 12.4 GWh |
| #1692 | Mohave Electric Cooperative at Joy Lane | Fort Mohave, AZ | 12.4 GWh |
| #1693 | Union Bridge Solar | Union Bridge, MD | 12.3 GWh |
| #1694 | Frenchtown III Solar | Frenchtown, NJ | 12.2 GWh |
| #1695 | Annandale Solar | Annandale, MN | 12.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Whistling Duck I.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bell Ridge Solar | Trenton, FL | 194.0 GWh | 23.9 mi |
| Bronson Solar | Bronson, FL | 68.1 GWh | 11.6 mi |
| Butler Plaza | Gainesville, FL | 1.9 GWh | 10.9 mi |
| Columbia Solar Power Plant | Fort White, FL | 161.0 GWh | 32.5 mi |
| County Line Renewable Energy Center | High Springs, FL | 185.1 GWh | 27.7 mi |
| Deerhaven Generating Station | Gainesville, FL | 621.7 GWh | 20 mi |
| Deerhaven Renewable | Gainesville, FL | 506.7 GWh | 20.5 mi |
| G2 Energy Marion LLC | Ocala, FL | 129.0 MWh | 33.1 mi |
| Gilchrist County Solar | Newberry, FL | 199.0 GWh | 17.6 mi |
| Hardeetown Solar Power Plant | Chiefland, FL | 167.1 GWh | 24.8 mi |
| High Springs Solar Power Plant | High Springs, FL | 164.0 GWh | 26.5 mi |
| Horizon Solar Energy Center | Hawthorne, FL | 135.0 GWh | 26.1 mi |
| John R Kelly | Gainesville, FL | 807.2 GWh | 13.7 mi |
| MLH 2 | Gainesville, FL | 1.2 GWh | 18.1 mi |
| MLH 3 | Gainesville, FL | 1.1 GWh | 18.1 mi |
| Santa Fe Solar Power Plant | Fort White, FL | 155.6 GWh | 33.5 mi |
| Solar Park Gainesville, LLC | Gainesville, FL | 1.5 GWh | 16.7 mi |
| South Energy Center | Gainesville, FL | 49.3 GWh | 12.7 mi |
| Trenton Solar Power Plant | Trenton, FL | 174.7 GWh | 27.2 mi |
| University of Florida | Gainesville, FL | 379.0 GWh | 12.6 mi |