Bronson Solar
8951 NE 90th St, Bronson, FL 32621Plant Summary Information
Bronson Solar is ranked #10 out of 227 solar farms in Florida in terms of total annual net electricity generation.
Bronson Solar generated 53.4 GWh during the 3-month period between May 2026 to August 2026.
| Plant Name | Bronson Solar |
|---|---|
| Utility Name | Bronson Solar LLC |
| Location | Levy County, FL |
| Initial Operation Date | September 2025 |
| Last Update | Aug 2026 |
| Annual Generation | 186.5 GWh |
| Annual Consumption | 669.7 k MMBtu |
| Ranked #2,699 out of 13,301 Power Plants Nationwide | |
| Ranked #553 out of 7,209 Solar Power Plants Nationwide | |
| Ranked #74 out of 334 Florida Power Plants | |
| Ranked #10 out of 227 Florida Solar Power Plants | |
| Fuel Types | Solar |
Map of Bronson Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Bronson Solar.
Monthly Net Generation for Bronson Solar
Monthly Plant Fuel Consumption for Bronson Solar
Bronson Solar Details
| Summary Information | |
|---|---|
| Plant Name | Bronson Solar (68372) |
| Plant Address | 8951 NE 90th St, Bronson, FL 32621 |
| Utility | Bronson Solar LLC (66744) |
| Latitude, Longitude | 29.46499, -82.6239 |
| Generation Dates on File | Aug 2025 to Aug 2026 |
| Initial Operation Date | September 2025 |
| Annual Generation | 186.5 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | Duke Energy Florida Inc (FPC) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | NA |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Duke Energy Florida, LLC (6455) FL |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator BROS Details Operating September 2025
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 74.5 MW |
| Summer Capacity | 74.5 MW |
| Winter Capacity | 74.5 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | September 2025 |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Bifacial | Yes |
| Azimuth Angle | 180 |
| Tilt Angle | 52 |
| DC Net Capacity | 104.3 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Bronson Solar Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #543 | Speckled Perch | TBD, FL | 188.3 GWh |
| #544 | White Tail Solar | Milan, MI | 188.3 GWh |
| #545 | Tupelo Solar | San Mateo, FL | 188.2 GWh |
| #546 | Sycamore Creek Solar, LLC | New Washington, OH | 187.9 GWh |
| #547 | White Pine Solar, LLC | Butler, GA | 187.9 GWh |
| #548 | Hog Bay | TBD, FL | 187.8 GWh |
| #549 | Gadsden County Solar | Chattahoochee, FL | 187.8 GWh |
| #550 | Red Mesa Solar Project | Red Mesa, UT | 187.5 GWh |
| #551 | Sadler Solar | Emporia, VA | 186.7 GWh |
| #552 | Buckeye Solar | Williamsport, OH | 186.7 GWh |
| #554 | Playa Solar 1, LLC | North Las Vegas, NV | 186.5 GWh |
| #555 | Fawn | TBD, FL | 186.4 GWh |
| #556 | Aspen Road Solar | Spring Run, PA | 186.1 GWh |
| #557 | Bell Ridge Solar | Trenton, FL | 186.1 GWh |
| #558 | Lamesa Solar | Lamesa, TX | 186.0 GWh |
| #559 | Green Pasture | TBD, FL | 185.4 GWh |
| #560 | Long Point Solar | Damon, TX | 185.2 GWh |
| #561 | Steel Solar LLC | Plymouth, UT | 185.2 GWh |
| #562 | Bay Ranch Solar Power Plant | Panama City, FL | 185.1 GWh |
| #563 | Lancaster Solar GA | Arlington, GA | 185.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Bronson Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bay Trail Solar Power Plant | Crystal River, FL | 167.6 GWh | 32.3 mi |
| Bell Ridge Solar | Trenton, FL | 186.1 GWh | 18.3 mi |
| Butler Plaza | Gainesville, FL | 2.5 GWh | 18.3 mi |
| Columbia County Solar | Fort White, FL | 155.4 GWh | 29.6 mi |
| Columbia Solar Power Plant | Fort White, FL | 160.1 GWh | 29.2 mi |
| County Line Renewable Energy Center | High Springs, FL | 171.9 GWh | 24.2 mi |
| Deerhaven Generating Station | Gainesville, FL | 805.6 GWh | 24.8 mi |
| Deerhaven Renewable | Gainesville, FL | 552.6 GWh | 25 mi |
| Gilchrist County Solar | Newberry, FL | 191.3 GWh | 11 mi |
| Hardeetown Solar Power Plant | Chiefland, FL | 166.6 GWh | 13.3 mi |
| High Springs Solar Power Plant | High Springs, FL | 166.2 GWh | 23.9 mi |
| John R Kelly | Gainesville, FL | 680.1 GWh | 22.1 mi |
| MLH 2 | Gainesville, FL | 644.0 MWh | 25.9 mi |
| MLH 3 | Gainesville, FL | 683.0 MWh | 25.9 mi |
| Santa Fe Solar Power Plant | Fort White, FL | 129.3 GWh | 29.4 mi |
| Solar Park Gainesville, LLC | Gainesville, FL | 1.3 GWh | 23.7 mi |
| South Energy Center | Gainesville, FL | 42.5 GWh | 20.8 mi |
| Trenton Solar Power Plant | Trenton, FL | 155.6 GWh | 17.7 mi |
| University of Florida | Gainesville, FL | 388.2 GWh | 20.5 mi |
| Whistling Duck I | Williston, FL | 134.9 GWh | 11.6 mi |