Fort Green Solar Power Plant
N County Road 663, Bowling Green, FL 33834Plant Summary Information
Fort Green Solar Power Plant is ranked #50 out of 225 solar farms in Florida in terms of total annual net electricity generation.
Fort Green Solar Power Plant generated 47.0 GWh during the 3-month period between March 2026 to June 2026.
| Plant Name | Fort Green Solar Power Plant |
|---|---|
| Utility Name | Duke Energy Florida, LLC |
| Location | Hardee County, FL |
| Initial Operation Date | August 2022 |
| Last Update | Jun 2026 |
| Annual Generation | 169.9 GWh |
| Annual Consumption | 627.8 k MMBtu |
| Ranked #2,793 out of 13,094 Power Plants Nationwide | |
| Ranked #595 out of 7,027 Solar Power Plants Nationwide | |
| Ranked #115 out of 332 Florida Power Plants | |
| Ranked #50 out of 225 Florida Solar Power Plants | |
| Fuel Types | Solar |
Map of Fort Green Solar Power Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Fort Green Solar Power Plant.
Monthly Net Generation for Fort Green Solar Power Plant
Monthly Plant Fuel Consumption for Fort Green Solar Power Plant
Fort Green Solar Power Plant Details
| Summary Information | |
|---|---|
| Plant Name | Fort Green Solar Power Plant (64533) |
| Plant Address | N County Road 663, Bowling Green, FL 33834 |
| Utility | Duke Energy Florida, LLC (6455) |
| Latitude, Longitude | 27.64113, -81.94158 |
| Generation Dates on File | May 2022 to Jun 2026 |
| Initial Operation Date | August 2022 |
| Annual Generation | 169.9 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | SERC |
| Balancing Authority | Duke Energy Florida Inc (FPC) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Duke Energy Florida, LLC (6455) FL |
| Grid Voltage | 69.00 kV |
| Energy Storage | No |
Generator PV1 Details Operating August 2022
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 74.9 MW |
| Summer Capacity | 74.9 MW |
| Winter Capacity | 74.9 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | August 2022 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Solar |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Tilt Angle | 15 |
| DC Net Capacity | 126.7 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Fort Green Solar Power Plant Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #585 | Gunsight Solar, LLC | Swansea, SC | 171.2 GWh |
| #586 | High Point Solar LLC | Lena, IL | 171.1 GWh |
| #587 | Split Rail Solar Energy LLC | Warrenton, MO | 171.1 GWh |
| #588 | Falmouth Renewable Energy Center | Live Oak, FL | 170.9 GWh |
| #589 | Wild Azalea Solar Energy Center | Chattahoochee, FL | 170.7 GWh |
| #590 | Compadre Solar | Gainsville, TX | 170.7 GWh |
| #591 | Winquepin Renewable Energy Center | Lee, FL | 170.7 GWh |
| #592 | Chautauqua Solar Energy Center | Defuniak Springs, FL | 170.5 GWh |
| #593 | Henrietta Solar Project | Lemoore, CA | 170.4 GWh |
| #594 | Fall River Solar, LLC | Edgemont, SD | 170.2 GWh |
| #596 | Petersburg Energy Center | Petersburg, IN | 169.9 GWh |
| #597 | Wing | Wing, AL | 169.5 GWh |
| #598 | Graphite Solar I | Wellington, UT | 169.2 GWh |
| #599 | CPV Maple Hill Solar | Portage, PA | 168.9 GWh |
| #600 | Duette Solar Power Plant | Parrish, FL | 168.9 GWh |
| #601 | Sandy Creek Solar Power Plant | Panama City, FL | 168.6 GWh |
| #602 | CPV Stagecoach Solar | Andersonville, GA | 168.4 GWh |
| #603 | Water Strider Solar | Nathalie, VA | 167.4 GWh |
| #604 | Bluebird Solar LLC | Cynthiana, KY | 167.4 GWh |
| #605 | FPL Etonia Creek | Palatka, FL | 166.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Fort Green Solar Power Plant.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Alafia Solar | Mulberry, FL | 123.5 GWh | 7.7 mi |
| Duette Solar Power Plant | Parrish, FL | 168.9 GWh | 8.3 mi |
| Durrance | Mulberry, FL | 99.7 GWh | 9.9 mi |
| Grange Hall Solar | Wimauma, FL | 120.8 GWh | 13.9 mi |
| Hardee Power Station | Bowling Green, FL | 1.0 TWh | 1.4 mi |
| Hines Energy Complex | Bartow, FL | 11.1 TWh | 11.1 mi |
| Jamison Solar (FL) | Mulberry, FL | 137.2 GWh | 11.5 mi |
| Lake Hancock Solar | Bartow, FL | 93.1 GWh | 7.8 mi |
| Lithia Solar | Lithia, FL | 142.8 GWh | 15.7 mi |
| Long Branch Solar | Parrish, FL | 56.5 GWh | 14.1 mi |
| Midulla Generating Station | Bowling Green, FL | 3.3 TWh | 1.3 mi |
| Mosaic New Wales Operations | Mulberry, FL | 350.2 GWh | 14.9 mi |
| Mosaic South Pierce Operations | Mulberry, FL | 79.2 GWh | 8.6 mi |
| Mulberry Cogeneration Facility | Bartow, FL | 388.0 GWh | 14.9 mi |
| Payne Creek Solar | Bowling Green, FL | 121.6 GWh | 2.1 mi |
| Polk | Mulberry, FL | 3.2 TWh | 6.7 mi |
| Sambucus | Myakka City, FL | 185.6 GWh | 15.3 mi |
| Tiger Bay | Ft. Meade, FL | 870.8 GWh | 9.2 mi |
| Vandolah Power Station | Wauchula, FL | 845.5 GWh | 8.2 mi |
| Willow Solar Energy Center | Myakka City, FL | 154.8 GWh | 15.8 mi |