Ganado Solar

4858 FM 710, Gail, TX 77962

Plant Summary Information

Ganado Solar is ranked #102 out of 255 solar farms in Texas in terms of total annual net electricity generation.

Ganado Solar generated 104.4 GWh during the 3-month period between May 2026 to August 2026.

Plant NameGanado Solar
Utility NameEnel Green Power NA, Inc.
LocationJackson County, TX
Initial Operation DateOctober 2023
Last Update Aug 2026
Annual Generation 332.5 GWh
Annual Consumption 1.3 M MMBtu
Ranked #1,919 out of 13,301 Power Plants Nationwide
Ranked #275 out of 7,209 Solar Power Plants Nationwide
Ranked #404 out of 861 Texas Power Plants
Ranked #102 out of 255 Texas Solar Power Plants
Fuel Types Solar

Map of Ganado Solar

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Ganado Solar.

Create Your Account Today

Monthly Net Generation for Ganado Solar

Monthly Plant Fuel Consumption for Ganado Solar

Ganado Solar Details

Summary Information
Plant NameGanado Solar (67284)
Plant Address4858 FM 710, Gail, TX 77962
UtilityEnel Green Power NA, Inc. (59380)
Latitude, Longitude29.10915, -96.52876
Generation Dates on FileOct 2023 to Aug 2026
Initial Operation DateOctober 2023
Annual Generation 332.5 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusYes
FERC Exempt Wholesale Generator Docket NumberEG22-127-000
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionTRE
Balancing AuthorityElectric Reliability Council of Texas, Inc. (ERCO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water SourceNA
Ash Impoundment No
Transmission / Distribution OwnerSouth Texas Electric Coop, Inc (17583)
Grid Voltage 138.00 kV
Energy StorageYes

Generator GS1 Details Operating October 2023

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity150.5 MW
Summer Capacity150.5 MW
Winter Capacity150.5 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateOctober 2023
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Time From Cold Shutdown To Full Load10M
Solar Details
Single Axis TrackingYes
BifacialYes
Azimuth Angle270
Tilt Angle52
DC Net Capacity208.5 MW
Crystalline SiliconYes
Net Metering AgreementNo
Virtual Net Metering AgreementNo

Generator GBA Details Operating March 2024

TechnologyBatteries
Prime MoverBattery
OwnershipSingle Owner
Nameplate Capacity70.5 MW
Summer Capacity70.5 MW
Winter Capacity70.5 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateMarch 2024
Sector NameIPP Non-CHP (2)
Energy SourceElectricity used for energy storage
Carbon Capture TechnologyNo
Energy Storage Details
Nameplate Energy Capacity MWH115
Maximum Charge Rate70 MW
Maximum Discharge Rate70 MW
Storage TechnologyLIB
Nameplate Reactive Power Rating72.8
Storage Enclosure TypeCS
ArbitrageP
Frequency RegulationYes
Voltage Or Reactive Power SupportYes
Direct Support Of Another UnitNo
Support T D AssetNo

Ganado Solar Plant Owners

Owner NameAddressGeneratorOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#265Newport Solar ProjectNewport, AR351.6 GWh
#266Arlington Energy Center IIIBlythe, CA329.2 GWh
#267Aragorn Solar ProjectVan Horn, TX349.3 GWh
#268Hardy Hills Solar Energy LLCFrankfort, IN347.8 GWh
#269North Rosamond Solar LLCRosamond, CA346.7 GWh
#270Zier SolarBrackettville, TX341.0 GWh
#271Camilla Solar Energy ProjectCamilla, GA345.9 GWh
#272Quitman SolarQuitman, GA344.7 GWh
#273Blythe Solar IV, LLCBlythe, CA330.2 GWh
#274Blythe Solar II, LLCBlythe, CA326.0 GWh
#276Daybreak SolarMaupin, OR339.6 GWh
#277Edwards Sanborn 1CMojave, CA339.3 GWh
#278Elora SolarElora, TN337.8 GWh
#279Cattlemen Solar IIRosebud, TX337.3 GWh
#280Arlington Valley Solar Energy IIArlington, AZ336.0 GWh
#281Edwards Sanborn E4Mojave, CA329.4 GWh
#282Washington County SolarSandersville, GA332.3 GWh
#283Cove Mountain Solar 2Beryl, UT332.1 GWh
#284Sun Streams, LLCArlington, AZ330.7 GWh
#285Edwards Sanborn E1AMojave, CA311.8 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Ganado Solar.

Plant NamePlant LocationAnnual GenerationDistance
Aktina SolarEl Campo, TX1.1 TWh15.3 mi
Bernard Creek SolarHungerford, TX504.5 GWh35.7 mi
Calhoun Port ComfortPoint Comfort, TX26.0 GWh31.9 mi
Cascade Solar (TX)Wharton, TX9.6 GWh31.2 mi
CFB Power PlantPoint Comfort, TX851.5 GWh31.7 mi
Colorado Bend Energy CenterWharton, TX1.9 TWh30.4 mi
Colorado Bend IIWharton, TX6.7 TWh30.6 mi
Danish Fields Solar, LLCEl Campo, TX1.2 TWh19.8 mi
Formosa Utility Venture LtdPoint Comfort, TX4.9 TWh28.9 mi
GulfStar Power, LLCWharton, TX896.1 GWh34.3 mi
HEB00092Victoria, TX320.0 MWh33.4 mi
HEB00292Bay City, TX191.0 MWh35.5 mi
Lane City WindLane City, TX524.7 GWh30.9 mi
Oriana Solar LLCVictoria, TX402.5 GWh30.6 mi
OTHERCitizensHospitalVictoria, TX588.0 MWh34 mi
Prairie Switch Wind LLCEl Campo, TX515.8 GWh26.5 mi
Red Tailed Hawk Solar LLCEl Campo, TX808.2 GWh23.6 mi
Sky Global Power OneRock Island, TX107.4 GWh30.5 mi
South Texas ProjectWadsworth, TX20.3 TWh36.3 mi
Tres BahiasPort Lavaca, TX443.6 GWh29.1 mi