OTHERNFBWA
13380 Bellaire Blvd, Houston, TX 77083Plant Summary Information
OTHERNFBWA is ranked #200 out of 314 natural gas power plants in Texas in terms of total annual net electricity generation.
OTHERNFBWA is comprised of 6 generators and generated 71.9 MWh during the 3-month period between September 2024 to December 2024.
| Plant Name | OTHERNFBWA |
|---|---|
| Utility Name | Texas Microgrid, LLC |
| Location | Fort Bend County, TX |
| Initial Operation Date | February 2021 |
| Last Update | Dec 2024 |
| Annual Generation | 321.0 MWh |
| Annual Consumption | 5.0 k MMBtu |
| Ranked #11,770 out of 12,539 Power Plants Nationwide | |
| Ranked #1,981 out of 2,243 Natural Gas Power Plants Nationwide | |
| Ranked #659 out of 799 Texas Power Plants | |
| Ranked #200 out of 314 Texas Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
Map of OTHERNFBWA
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for OTHERNFBWA.
Monthly Net Generation for OTHERNFBWA
OTHERNFBWA Details
| Summary Information | |
|---|---|
| Plant Name | OTHERNFBWA (67316) |
| Plant Address | 13380 Bellaire Blvd, Houston, TX 77083 |
| Utility | Texas Microgrid, LLC (64449) |
| Latitude, Longitude | 29.70563, -95.61913 |
| Generation Dates on File | Jan 2023 to Dec 2024 |
| Initial Operation Date | February 2021 |
| Annual Generation | 321.0 MWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | CenterPoint Energy (8901) TX |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Local Distribution Company (LDC) | CENTERPOINT ENERGY |
| Natural Gas Storage | No |
Generator NFB1 Details Operating February 2021
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.4 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.4 MW |
| Winter Capacity | 0.4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | February 2021 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator NFB2 Details Operating February 2021
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.4 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.4 MW |
| Winter Capacity | 0.4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | February 2021 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator NFB3 Details Operating February 2021
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.4 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.4 MW |
| Winter Capacity | 0.4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | February 2021 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator NFB4 Details Operating February 2021
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.4 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.4 MW |
| Winter Capacity | 0.4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | February 2021 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator NFB5 Details Operating February 2021
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.4 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.4 MW |
| Winter Capacity | 0.4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | February 2021 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator NFB6 Details Operating February 2021
| Technology | Natural Gas Internal Combustion Engine |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.4 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 0.4 MW |
| Winter Capacity | 0.4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | February 2021 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Switch Between Oil And Natural Gas | No |
OTHERNFBWA Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1971 | HEB00099 | Houston, TX | 345.0 MWh |
| #1972 | Painesville | Painesville, OH | 1.0 GWh |
| #1973 | Waterloo | Waterloo, IL | 491.0 MWh |
| #1974 | Shoemaker | Middletown, NY | 336.0 MWh |
| #1975 | Clewiston Sugar House | Clewiston, FL | 260.2 GWh |
| #1976 | HEB00591 | Round Rock, TX | 327.0 MWh |
| #1977 | WAL1103 | Houston, TX | 326.0 MWh |
| #1978 | WAL1040 | Houston, TX | 324.0 MWh |
| #1979 | WAL4526 | Houston, TX | 323.0 MWh |
| #1980 | Miles City GT | Miles City, MT | 331.0 MWh |
| #1982 | Cargill Salt Hersey | Hersey, MI | 318.2 MWh |
| #1983 | Hopewell Cogeneration NJ | Pennington, NJ | 317.0 MWh |
| #1984 | WAL522 | Crosby, TX | 316.0 MWh |
| #1985 | WAL5045 | Tomball, TX | 314.0 MWh |
| #1986 | Lake Forest Hospital Central Energy Plan | Lake Forest, IL | 313.0 MWh |
| #1987 | WAL3226 | Katy, TX | 312.0 MWh |
| #1988 | J C McNeil | Burlington, VT | 228.2 GWh |
| #1989 | HEBTEMDistCenter1B | Temple, TX | 309.0 MWh |
| #1990 | HEBTEMDistCenter2A | Temple, TX | 309.0 MWh |
| #1991 | Bear Valley Power Plant | Big Bear Lake, CA | 307.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding OTHERNFBWA.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Clara | Houston, TX | 209.0 MWh | 10.4 mi |
| Friendswood Energy | Houston, TX | 65.7 GWh | 10.8 mi |
| FTBLID2 | Sugarland, TX | 130.0 MWh | 9.1 mi |
| HEB00109 | Katy, TX | 303.0 MWh | 7.3 mi |
| HEB00776 | Katy, TX | 165.0 MWh | 10.9 mi |
| HEBHoustonDistributionCenter | Houston, TX | 6.4 GWh | 10.5 mi |
| HEBSnackPlant | Houston, TX | 388.0 MWh | 10.7 mi |
| HO Clarke Generating | Houston, TX | 351.7 GWh | 10.9 mi |
| OTHERTraditionBuffalo | Houston, TX | 202.0 MWh | 11.6 mi |
| WAL1040 | Houston, TX | 324.0 MWh | 12 mi |
| WAL2257 | Houston, TX | 442.0 MWh | 12.2 mi |
| WAL2993 | Sugar Land, TX | 255.0 MWh | 6.5 mi |
| WAL3302 | Houston, TX | 259.0 MWh | 3.9 mi |
| WAL3584 | Houston, TX | 230.0 MWh | 9.3 mi |
| WAL3827 | Richmond, TX | 224.0 MWh | 9.4 mi |
| WAL4512 | Katy, TX | 348.0 MWh | 11.8 mi |
| WAL4538 | Katy, TX | 192.0 MWh | 9.1 mi |
| WAL768 | Katy, TX | 171.0 MWh | 8.5 mi |
| WAL772 | Houston, TX | 198.0 MWh | 1.9 mi |
| Westhollow Technology Center | Houston, TX | 17.4 GWh | 1.8 mi |