Stampede Solar Hybrid
282 Country Road 3538, Saltillo, TX 75478Plant Summary Information
Stampede Solar Hybrid is ranked #36 out of 245 solar farms in Texas in terms of total annual net electricity generation.
Stampede Solar Hybrid generated 133.3 GWh during the 3-month period between February 2026 to May 2026.
| Plant Name | Stampede Solar Hybrid |
|---|---|
| Utility Name | Stampede Solar Project LLC |
| Location | Hopkins County, TX |
| Initial Operation Date | October 2024 |
| Last Update | May 2026 |
| Annual Generation | 539.1 GWh |
| Annual Consumption | 2.0 M MMBtu |
| Ranked #1,279 out of 13,081 Power Plants Nationwide | |
| Ranked #93 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #260 out of 852 Texas Power Plants | |
| Ranked #36 out of 245 Texas Solar Power Plants | |
| Fuel Types | Solar |
Map of Stampede Solar Hybrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Stampede Solar Hybrid.
Monthly Net Generation for Stampede Solar Hybrid
Monthly Plant Fuel Consumption for Stampede Solar Hybrid
Stampede Solar Hybrid Details
| Summary Information | |
|---|---|
| Plant Name | Stampede Solar Hybrid (67762) |
| Plant Address | 282 Country Road 3538, Saltillo, TX 75478 |
| Utility | Stampede Solar Project LLC (66361) |
| Latitude, Longitude | 33.20132, -95.31923 |
| Generation Dates on File | Oct 2024 to May 2026 |
| Initial Operation Date | October 2024 |
| Annual Generation | 539.1 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
| Grid Voltage | 345.00 kV |
| Energy Storage | Yes |
Generator STMPB Details Operating October 2024
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| Nameplate Capacity | 72.2 MW |
| Summer Capacity | 72.2 MW |
| Winter Capacity | 72.2 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | October 2024 |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 115 |
|---|---|
| Maximum Charge Rate | 70 MW |
| Maximum Discharge Rate | 70 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 124.9 |
| Storage Enclosure Type | CS |
| Arbitrage | P |
| Frequency Regulation | Yes |
| Voltage Or Reactive Power Support | Yes |
| Ac Coupled | No |
| Direct Support Of Another Unit | No |
| Support T D Asset | No |
Generator STMPS Details Operating November 2025
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 255.9 MW |
| Summer Capacity | 255.9 MW |
| Winter Capacity | 255.9 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | November 2025 |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Bifacial | Yes |
| Azimuth Angle | 180 |
| DC Net Capacity | 326.04 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Stampede Solar Hybrid Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #83 | Golden Field Solar III, LLC | Rosamond, CA | 537.5 GWh |
| #84 | AV Solar Ranch One | Lancaster, CA | 560.0 GWh |
| #85 | McFarland A Solar and Storage | Dateland, AZ | 550.8 GWh |
| #86 | Bighorn Solar 1 | Pueblo, CO | 559.3 GWh |
| #87 | California Valley Solar Ranch | California Valley, CA | 558.7 GWh |
| #88 | True North Solar, LLC | Otto, TX | 558.6 GWh |
| #89 | SE Athos II, LLC | Desert Center, CA | 558.5 GWh |
| #90 | Titan Solar Project | Van Horn, TX | 550.8 GWh |
| #91 | San Juan Solar I | Kirtland, NM | 531.8 GWh |
| #92 | Orion II Solar Project | Rosebud, TX | 545.4 GWh |
| #94 | Dodge Flat | Reno, NV | 535.6 GWh |
| #95 | RE Maplewood | McCamey, TX | 540.8 GWh |
| #96 | Fort Bend Solar LLC | East Bernard, TX | 540.6 GWh |
| #97 | Orion III Solar Project | Buckholts, TX | 536.1 GWh |
| #98 | Hardin Solar III | Alger, OH | 533.0 GWh |
| #99 | Oxbow Solar 1 | New Roads, LA | 532.4 GWh |
| #100 | Taygete Energy Project LLC | Coyanosa, TX | 530.6 GWh |
| #101 | Eland Solar & Storage Center, Phase 2 Hy | Mojave, CA | 512.9 GWh |
| #102 | Thunder Wolf Energy Center Hybrid | Avondale, CO | 512.9 GWh |
| #103 | Agua Caliente Solar Project | Dateland, AZ | 524.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Stampede Solar Hybrid.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Barrett Solar Project | Point, TX | 47.8 GWh | 38 mi |
| Bright Arrow Solar, LLC | Sulphur Springs, TX | 620.2 GWh | 23.8 mi |
| Chisum | Blossom, TX | 17.6 GWh | 30.1 mi |
| Delilah Solar Energy II LLC | Bogota, TX | 486.4 GWh | 19.6 mi |
| Delilah Solar Energy LLC | Bogota, TX | 507.2 GWh | 10.7 mi |
| Eiffel Solar Project | Paris, TX | 564.7 GWh | 29.9 mi |
| Estonian Solar Project, LLC | Cooper, TX | 462.1 GWh | 26.8 mi |
| Hecate Energy Upshur Rural LLC | Ore City, TX | 4.1 GWh | 42.1 mi |
| Hopkins Energy LLC | Dike, TX | 574.1 GWh | 8.3 mi |
| Impact Solar 1 | Deport, TX | 384.9 GWh | 18.7 mi |
| Lamar Power Project | Paris, TX | 7.2 TWh | 33.5 mi |
| Mockingbird Solar Center | Brookston, TX | 970.1 GWh | 14.5 mi |
| Paris Energy Center | Paris, TX | 320.9 GWh | 36.9 mi |
| Pine Forest Solar I | Pickton, TX | 251.1 GWh | 8.1 mi |
| Samson Solar Energy | Cunningham, TX | 335.7 GWh | 8 mi |
| Samson Solar Energy II LLC | Cunningham, TX | 419.9 GWh | 17.8 mi |
| Samson Solar Energy III LLC | Cunningham, TX | 304.9 GWh | 15.7 mi |
| Talco Solar Project | Talco, TX | 7.1 GWh | 13.4 mi |
| Tyson Nick | Paris, TX | 102.5 GWh | 35.4 mi |
| Welsh | Pittsburg, TX | 3.5 TWh | 29.5 mi |