Markum Solar Farm
18780 China Spring Rd., Valley Mills, TX 76689Plant Summary Information
Markum Solar Farm is ranked #74 out of 219 solar farms in Texas in terms of total annual net electricity generation.
Markum Solar Farm generated 80.6 GWh during the 3-month period between December 2025 to March 2026.
| Plant Name | Markum Solar Farm |
|---|---|
| Utility Name | Markum Solar Farm, LLC |
| Location | Bosque County, TX |
| Initial Operation Date | November 2024 |
| Last Update | Mar 2026 |
| Annual Generation | 370.8 GWh |
| Annual Consumption | 1.4 M MMBtu |
| Ranked #1,703 out of 12,332 Power Plants Nationwide | |
| Ranked #203 out of 6,397 Solar Power Plants Nationwide | |
| Ranked #341 out of 814 Texas Power Plants | |
| Ranked #74 out of 219 Texas Solar Power Plants | |
| Fuel Types | Solar |
Map of Markum Solar Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Markum Solar Farm.
Monthly Net Generation for Markum Solar Farm
Monthly Plant Fuel Consumption for Markum Solar Farm
Markum Solar Farm Details
| Summary Information | |
|---|---|
| Plant Name | Markum Solar Farm (67580) |
| Plant Address | 18780 China Spring Rd., Valley Mills, TX 76689 |
| Utility | Markum Solar Farm, LLC (66280) |
| Latitude, Longitude | 31.69479, -97.37488 |
| Generation Dates on File | Nov 2024 to Mar 2026 |
| Initial Operation Date | November 2024 |
| Annual Generation | 370.8 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | EG24-167-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Brazos Electric Power Coop Inc (2172) |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
Generator MKM Details Operating November 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 161 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 161 MW |
| Winter Capacity | 161 MW |
| Minimum Load | 161 MW |
|---|---|
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | November 2024 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| DC Net Capacity | 209.3 MW |
| Thin Film CDTE | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Markum Solar Farm Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #193 | Prairie Wolf Solar LLC | Ashmore Township, IL | 375.9 GWh |
| #194 | SR Russellville | Olmstead, KY | 374.7 GWh |
| #195 | Delilah Solar Energy II LLC | Bogota, TX | 374.4 GWh |
| #196 | Cavalry Solar Hybrid | Monon, IN | 359.9 GWh |
| #197 | Imperial Solar Energy Center West | Seeley, CA | 373.6 GWh |
| #198 | Grant County | Town of Potosi, WI | 372.9 GWh |
| #199 | BT Hickerson Solar, LLC | Clifton, TX | 371.8 GWh |
| #200 | Raceway Solar & Storage | Lancaster, CA | 364.0 GWh |
| #201 | RE Roserock | Fort Stockton, TX | 371.7 GWh |
| #202 | Edwards Sanborn E1B | Mojave, CA | 353.9 GWh |
| #204 | Blythe Solar III, LLC Hybrid | Blythe, CA | 357.0 GWh |
| #205 | Maverick Solar, LLC | Desert Center, CA | 369.3 GWh |
| #206 | Corazon Energy LLC | Rachito Las Lomas, TX | 369.2 GWh |
| #207 | Castle Gap Solar Hybrid | McCarney, TX | 368.4 GWh |
| #208 | Zier Solar | Brackettville, TX | 362.2 GWh |
| #209 | Blythe Solar IV, LLC | Blythe, CA | 359.2 GWh |
| #210 | Lund Hill Solar | Bickleton, WA | 366.2 GWh |
| #211 | Rambler | San Angelo, TX | 365.5 GWh |
| #212 | Montague Solar | Arlington, OR | 365.4 GWh |
| #213 | Solar Gen 2 Solar Facility | Calipatria, CA | 364.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Markum Solar Farm.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| AbbVie Waco | Waco, TX | 811.0 MWh | 17.6 mi |
| Ash Creek Solar | Abbott, TX | 607.7 GWh | 24.6 mi |
| BPL Crown Solar LLC | Chilton, TX | 215.9 GWh | 29.6 mi |
| BPL Sol Solar LLC | Chilton, TX | 212.6 GWh | 29.6 mi |
| BT Hickerson Solar, LLC | Clifton, TX | 371.8 GWh | 12 mi |
| Dileo Solar | Clifton, TX | 153.4 GWh | 9.9 mi |
| Eddy II | Eddy, TX | 16.6 GWh | 28.7 mi |
| Griffin Solar | Robinson, TX | 9.2 GWh | 20.5 mi |
| Hubbard Wind | Mt Calm, TX | 927.5 GWh | 32.6 mi |
| Midpoint Solar, LLC | Blum, TX | 16.1 GWh | 29.2 mi |
| Pitts Dudik Solar | Hubbard, TX | 101.5 GWh | 32.4 mi |
| PP Jaguar BESS LLC | TX | 11.5 GWh | 24.7 mi |
| Prairie Hill Wind Project | Mart, TX | 94.0 GWh | 29.5 mi |
| Sandy Creek Energy Station | Riesel, TX | 3.2 TWh | 28.9 mi |
| Sun Valley Solar Project | Abbott, TX | 568.6 GWh | 24.4 mi |
| Thad Hill Energy Center | Clifton, TX | 3.8 TWh | 11.4 mi |
| TPE Whitney Solar, LLC | Kopperl, TX | 16.3 GWh | 24.6 mi |
| Waco Solar | Mt Calm, TX | 883.9 GWh | 32.7 mi |
| Whitney | Clifton, TX | 69.4 GWh | 12.1 mi |
| Yellow Jacket | Meridian, TX | 10.0 GWh | 23.3 mi |