Markum Solar Farm
18780 China Spring Rd., Valley Mills, TX 76689Plant Summary Information
Markum Solar Farm is ranked #104 out of 188 solar farms in Texas in terms of total annual net electricity generation.
Markum Solar Farm generated 74.5 GWh during the 3-month period between December 2024 to March 2025.
Plant Name | Markum Solar Farm |
---|---|
Utility Name | Markum Solar Farm, LLC |
Location | Bosque County, TX |
Initial Operation Date | November 2024 |
Last Update | Mar 2025 |
Annual Generation | 116.2 GWh |
Annual Consumption | 396.5 k MMBtu |
Ranked #3,098 out of 12,288 Power Plants Nationwide | |
Ranked #621 out of 6,174 Solar Power Plants Nationwide | |
Ranked #458 out of 788 Texas Power Plants | |
Ranked #104 out of 188 Texas Solar Power Plants | |
Fuel Types | Solar |
Map of Markum Solar Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Markum Solar Farm.
Monthly Net Generation for Markum Solar Farm
Markum Solar Farm Details
Summary Information | |
---|---|
Plant Name | Markum Solar Farm (67580) |
Plant Address | 18780 China Spring Rd., Valley Mills, TX 76689 |
Utility | Markum Solar Farm, LLC (66280) |
Latitude, Longitude | 31.69479, -97.37488 |
Generation Dates on File | Nov 2024 to Mar 2025 |
Initial Operation Date | November 2024 |
Annual Generation | 116.2 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | EG24-167-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Brazos Electric Power Coop Inc (2172) |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator MKM Details Operating November 2024
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 161 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 161 MW |
Winter Capacity | 161 MW |
Minimum Load | 161 MW |
---|---|
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | November 2024 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 209.3 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Markum Solar Farm Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#611 | Payne Creek Solar | Bowling Green, FL | 118.7 GWh |
#612 | Hooper Solar | Mosca, CO | 118.3 GWh |
#613 | Wolf Run Solar | Chapin, IL | 118.3 GWh |
#614 | Alafia Solar | Mulberry, FL | 117.8 GWh |
#615 | Twin Lakes | Interlachen, FL | 117.7 GWh |
#616 | Sandstone Solar | Florence, AZ | 117.2 GWh |
#617 | Skysol | Merrill, OR | 117.1 GWh |
#618 | Manatee Solar Energy Center | Parrish, FL | 102.1 GWh |
#619 | Meherrin Solar | Skippers, VA | 116.8 GWh |
#620 | Estrella Solar & Storage | Lancaster, CA | 112.5 GWh |
#622 | Hecate Energy Beacon Solar 4 | Cantil, CA | 116.1 GWh |
#623 | Hawtree Solar | Warrenton, NC | 115.5 GWh |
#624 | Silver State Solar Power North | Primm, NV | 115.2 GWh |
#625 | Northern Preserve Solar | Glen St. Mary, FL | 114.7 GWh |
#626 | Beacon Solar Plant Site 2 | Cantil, CA | 114.7 GWh |
#627 | Pavant Solar, LLC | Fillmore, UT | 114.3 GWh |
#628 | Ocotillo Wells | Borrego Springs, CA | 112.8 GWh |
#629 | Horizon Solar Energy Center | Hawthorne, FL | 112.3 GWh |
#630 | SEGS IX | Hinkley, CA | 112.0 GWh |
#631 | Landrace Holdings, LLC | Conway, SC | 111.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Markum Solar Farm.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
AbbVie Waco | Waco, TX | 811.0 MWh | 17.6 mi |
BPL Crown Solar LLC | Chilton, TX | 196.9 GWh | 29.6 mi |
BPL Sol Solar LLC | Chilton, TX | 192.2 GWh | 29.6 mi |
Copperhead Solar, LLC | Riesel, TX | 152.5 GWh | 34.7 mi |
Dileo Solar | Clifton, TX | 154.5 GWh | 9.9 mi |
Eddy II | Eddy, TX | 16.6 GWh | 28.7 mi |
Griffin Solar | Robinson, TX | 9.2 GWh | 20.5 mi |
HEBTEMDistCenter1B | Temple, TX | 309.0 MWh | 37.5 mi |
Hubbard Wind | Mt Calm, TX | 975.9 GWh | 32.6 mi |
Pitts Dudik Solar | Hubbard, TX | 107.1 GWh | 32.4 mi |
Prairie Hill Wind Project | Mart, TX | 174.5 GWh | 29.5 mi |
Roseland Solar Project, LLC | Riesel, TX | 969.6 GWh | 36.2 mi |
Sandy Creek Energy Station | Riesel, TX | 3.3 TWh | 28.9 mi |
Sun Valley Solar Project | Abbott, TX | 546.2 GWh | 24.4 mi |
Thad Hill Energy Center | Clifton, TX | 4.1 TWh | 11.4 mi |
TPE Whitney Solar, LLC | Kopperl, TX | 16.3 GWh | 24.6 mi |
Waco Solar | Mt Calm, TX | 929.2 GWh | 32.7 mi |
Walnut Springs Solar | Walnut Springs, TX | 8.4 GWh | 35.2 mi |
Whitney | Clifton, TX | 69.4 GWh | 12.1 mi |
Yellow Jacket | Meridian, TX | 10.0 GWh | 23.3 mi |