Grimes County Solar
TBD, Lola, TX 77861Plant Summary Information
Grimes County Solar is ranked #126 out of 251 solar farms in Texas in terms of total annual net electricity generation.
Grimes County Solar generated 122.0 GWh during the 3-month period between March 2026 to June 2026.
| Plant Name | Grimes County Solar |
|---|---|
| Utility Name | Grimes County Solar Project, LLC |
| Location | Grimes County, TX |
| Initial Operation Date | Not Available |
| Last Update | Jun 2026 |
| Annual Generation | 224.7 GWh |
| Annual Consumption | 766.8 k MMBtu |
| Ranked #2,398 out of 13,094 Power Plants Nationwide | |
| Ranked #425 out of 7,027 Solar Power Plants Nationwide | |
| Ranked #454 out of 858 Texas Power Plants | |
| Ranked #126 out of 251 Texas Solar Power Plants | |
| Fuel Types | Solar |
Map of Grimes County Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Grimes County Solar.
Monthly Net Generation for Grimes County Solar
Monthly Plant Fuel Consumption for Grimes County Solar
Grimes County Solar Details
| Summary Information | |
|---|---|
| Plant Name | Grimes County Solar (67046) |
| Plant Address | TBD, Lola, TX 77861 |
| Utility | Grimes County Solar Project, LLC (65961) |
| Latitude, Longitude | 30.65119, -96.09134 |
| Generation Dates on File | Jan 2026 to Jun 2026 |
| Initial Operation Date | Not Available |
| Annual Generation | 224.7 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | NA |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Brazos Electric Power Coop Inc (2172) |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
Grimes County Solar Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #415 | SR Clay, LLC | Fort Gaines, GA | 228.8 GWh |
| #416 | Ross County Solar, LLC | Greenfield, OH | 228.3 GWh |
| #417 | East Pecos Solar | McCamey, TX | 228.2 GWh |
| #418 | Sauk Solar Park | Union City, MI | 226.7 GWh |
| #419 | Prairie Mist Solar | Montrose, AR | 226.6 GWh |
| #420 | Albemarle Beach Solar | Roper, NC | 226.5 GWh |
| #421 | Antelope Expansion 2 | Lancaster, CA | 226.4 GWh |
| #422 | Prairie State Solar Project | Swanwick Township, IL | 226.1 GWh |
| #423 | Dressor Plains Solar, LLC | Herrick, IL | 225.5 GWh |
| #424 | Martin County Solar Project, LLC | Pilgrim, KY | 224.8 GWh |
| #426 | Ivanpah 2 | Nipton, CA | 229.0 GWh |
| #427 | SR Arlington II | Blakely, GA | 222.7 GWh |
| #428 | Briar Creek Solar 1 | Corsicana, TX | 222.3 GWh |
| #429 | Techren Solar I LLC | Boulder, NV | 221.9 GWh |
| #430 | Galloway 2 Solar Farm | Paint Rock, TX | 221.5 GWh |
| #431 | Morrow Lake Solar | Pearsall, TX | 221.4 GWh |
| #432 | Butler Solar Project 103 | Butler, GA | 221.2 GWh |
| #433 | Iron Springs Solar, LLC | Cedar City, UT | 221.0 GWh |
| #434 | Axial Basin Solar | Meeker, CO | 220.2 GWh |
| #435 | Assembly Solar II LLC | Lennon, MI | 220.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Grimes County Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Blue Jay Solar I, LLC | Iola, TX | 427.1 GWh | 4 mi |
| Bryan (TX) | Bryan, TX | 1.0 GWh | 16.7 mi |
| Central Utility Plant - Texas A&M | College Station, TX | 128.8 GWh | 15.2 mi |
| Dansby | Bryan, TX | 195.2 GWh | 22.5 mi |
| Diver Solar, LLC | Thornton, TX | 410.2 GWh | 45 mi |
| HEB00020 | Cypress, TX | 195.0 MWh | 50 mi |
| HEB00594 | The Woodlands, TX | 279.0 MWh | 46.4 mi |
| HEB00767 | Magnolia, TX | 228.0 MWh | 38.4 mi |
| Lewis Creek | Willis, TX | 2.0 TWh | 37 mi |
| Major Oak Power | Bremond, TX | 2.3 TWh | 47 mi |
| Montgomery County | Willis, TX | 5.8 TWh | 36.6 mi |
| Oak Grove (TX) | Franklin, TX | 11.8 TWh | 43.4 mi |
| OTHERTexasA&M | Bryan, TX | 1.6 GWh | 22 mi |
| Parliament Solar | Waller, TX | 573.3 GWh | 47.3 mi |
| Tenaska Frontier Generation Station | Shiro, TX | 4.7 TWh | 11.1 mi |
| WAL3390 | The Woodlands, TX | 384.0 MWh | 43.7 mi |
| WAL5045 | Tomball, TX | 436.0 MWh | 53 mi |
| WAL5091 | Cypress, TX | 411.0 MWh | 52.2 mi |
| WAL5287 | Spring, TX | 336.0 MWh | 52.6 mi |
| WAL602 | Spring, TX | 328.0 MWh | 52.5 mi |