Grimes County Solar

TBD, Lola, TX 77861

Plant Summary Information

Grimes County Solar is ranked #159 out of 218 solar farms in Texas in terms of total annual net electricity generation.

Grimes County Solar generated 27.6 GWh during the 3-month period between October 2025 to January 2026.

Plant NameGrimes County Solar
Utility NameGrimes County Solar Project, LLC
LocationGrimes County, TX
Initial Operation DateNot Available
Last Update Jan 2026
Annual Generation 27.6 GWh
Annual Consumption 94.3 k MMBtu
Ranked #4,909 out of 12,629 Power Plants Nationwide
Ranked #1,318 out of 6,477 Solar Power Plants Nationwide
Ranked #561 out of 819 Texas Power Plants
Ranked #159 out of 218 Texas Solar Power Plants
Fuel Types Solar

Map of Grimes County Solar

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Grimes County Solar.

Create Your Account Today

Monthly Net Generation for Grimes County Solar

Monthly Plant Fuel Consumption for Grimes County Solar

Grimes County Solar Details

Summary Information
Plant NameGrimes County Solar (67046)
Plant AddressTBD, Lola, TX 77861
UtilityGrimes County Solar Project, LLC (65961)
Latitude, Longitude30.65119, -96.09134
Generation Dates on FileJan 2026 to Jan 2026
Initial Operation DateNot Available
Annual Generation 27.6 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionTRE
Balancing AuthorityElectric Reliability Council of Texas, Inc. (ERCO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water SourceNA
Ash Impoundment No
Transmission / Distribution OwnerBrazos Electric Power Coop Inc (2172)
Grid Voltage 138.00 kV
Energy StorageNo

Grimes County Solar Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#1308Two Mile Desert ProjectHertford, NC28.1 GWh
#1309DeSoto Next Generation Solar EnergyArcadia, FL28.1 GWh
#1310Facebook 2 Solar Energy CenterAlbuquerque, NM28.1 GWh
#1311Gold Meadow FarmsCranston, RI28.0 GWh
#1312Camden Solar LLCSouth Camden, NC27.9 GWh
#1313Facebook 3 Solar Energy CenterAlbuquerque, NM27.9 GWh
#1314Wildflower Solar 1Elverta, CA27.9 GWh
#1315Morgan's CornerElizabeth City, NC27.8 GWh
#1316University Solar, LLCWest Greenwich, RI27.8 GWh
#1317Electric City SolarSturgis, MI27.8 GWh
#1319Trask East SolarBeaufort, SC27.6 GWh
#1320Tropico Solar PV PlantDelano, CA27.4 GWh
#1321Santolina Solar Energy CenterAlbuquerque, NM27.4 GWh
#1322Kelso SolarMO27.3 GWh
#1323SJA Solar LLC-Solterra Monastery CSGSpencer, MA27.3 GWh
#1324Java Solar, LLCLemoore, CA27.2 GWh
#1325CSWIND America Inc.Pueblo, CO27.2 GWh
#1326Selmer ISelmer, TN27.2 GWh
#1327Cumblerland Land Holdings, LLCElkmont, AL27.2 GWh
#1328KDC Solar PR1, LLCJackson, NJ27.1 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Grimes County Solar.

Plant NamePlant LocationAnnual GenerationDistance
Blue Jay Solar I, LLCIola, TX444.5 GWh4 mi
Bryan (TX)Bryan, TX1.5 GWh16.7 mi
Central Utility Plant - Texas A&MCollege Station, TX137.4 GWh15.2 mi
DansbyBryan, TX149.9 GWh22.5 mi
Diver Solar, LLCThornton, TX188.6 GWh45 mi
HEB00020Cypress, TX254.0 MWh50 mi
HEB00594The Woodlands, TX279.0 MWh46.4 mi
HEB00767Magnolia, TX165.0 MWh38.4 mi
Lewis CreekWillis, TX1.9 TWh37 mi
Major Oak PowerBremond, TX2.2 TWh47 mi
Montgomery CountyWillis, TX5.9 TWh36.6 mi
Oak Grove (TX)Franklin, TX11.0 TWh43.4 mi
OTHERTexasA&MBryan, TX1.3 GWh22 mi
Parliament SolarTX110.6 GWh47.3 mi
Tenaska Frontier Generation StationShiro, TX3.4 TWh11.1 mi
WAL3390The Woodlands, TX282.0 MWh43.7 mi
WAL5045Tomball, TX314.0 MWh53 mi
WAL5091Cypress, TX288.0 MWh52.2 mi
WAL5287Spring, TX226.0 MWh52.6 mi
WAL602Spring, TX223.0 MWh52.5 mi