Grimes County Solar
TBD, Lola, TX 77861Plant Summary Information
Grimes County Solar is ranked #141 out of 219 solar farms in Texas in terms of total annual net electricity generation.
Grimes County Solar generated 102.7 GWh during the 3-month period between December 2025 to March 2026.
| Plant Name | Grimes County Solar |
|---|---|
| Utility Name | Grimes County Solar Project, LLC |
| Location | Grimes County, TX |
| Initial Operation Date | Not Available |
| Last Update | Mar 2026 |
| Annual Generation | 102.7 GWh |
| Annual Consumption | 350.5 k MMBtu |
| Ranked #3,412 out of 12,332 Power Plants Nationwide | |
| Ranked #841 out of 6,397 Solar Power Plants Nationwide | |
| Ranked #505 out of 814 Texas Power Plants | |
| Ranked #141 out of 219 Texas Solar Power Plants | |
| Fuel Types | Solar |
Map of Grimes County Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Grimes County Solar.
Monthly Net Generation for Grimes County Solar
Monthly Plant Fuel Consumption for Grimes County Solar
Grimes County Solar Details
| Summary Information | |
|---|---|
| Plant Name | Grimes County Solar (67046) |
| Plant Address | TBD, Lola, TX 77861 |
| Utility | Grimes County Solar Project, LLC (65961) |
| Latitude, Longitude | 30.65119, -96.09134 |
| Generation Dates on File | Jan 2026 to Mar 2026 |
| Initial Operation Date | Not Available |
| Annual Generation | 102.7 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | NA |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Brazos Electric Power Coop Inc (2172) |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
Grimes County Solar Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #831 | Forgeview Solar | Blytheville, AR | 104.8 GWh |
| #832 | Edwards Sanborn S1 | Mojave, CA | 102.4 GWh |
| #833 | Morrow Lake Solar | Pearsall, TX | 104.3 GWh |
| #834 | Foothills Solar Plant Hybrid | Yuma, AZ | 97.8 GWh |
| #835 | Broad River Solar, LLC | Mooresboro, NC | 103.8 GWh |
| #836 | SR Turkey Creek, LLC | Lancaster, KY | 103.5 GWh |
| #837 | Appaloosa Solar I | Cedar City, UT | 103.1 GWh |
| #838 | Salt City Solar Project - Hybrid | Circleville, OH | 103.1 GWh |
| #839 | Optimist | West Point, MS | 101.0 GWh |
| #840 | Coldwater River Solar | Coldwater, MI | 102.8 GWh |
| #842 | Luning Energy | Luning, NV | 102.1 GWh |
| #843 | Bladen Solar | Fayetteville, NC | 101.8 GWh |
| #844 | Pitts Dudik Solar | Hubbard, TX | 101.5 GWh |
| #845 | Red Horse 2 | Willcox, AZ | 145.9 GWh |
| #846 | AES Maui Kuihelani Solar Hybrid | Waikapu, HI | 99.3 GWh |
| #847 | Red Rock | Red Rock, AZ | 96.2 GWh |
| #848 | Ranchland Solar, LLC | Moyock, NC | 101.0 GWh |
| #849 | Vancourt Solar Interconnections | La Feria, TX | 100.8 GWh |
| #850 | Seabrook Solar | Seabrook, SC | 100.7 GWh |
| #851 | Sugar Solar, LLC | Yadkinville, NC | 100.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Grimes County Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Blue Jay Solar I, LLC | Iola, TX | 437.0 GWh | 4 mi |
| Bryan (TX) | Bryan, TX | 1.5 GWh | 16.7 mi |
| Central Utility Plant - Texas A&M | College Station, TX | 138.7 GWh | 15.2 mi |
| Dansby | Bryan, TX | 149.9 GWh | 22.5 mi |
| Diver Solar, LLC | Thornton, TX | 276.9 GWh | 45 mi |
| HEB00020 | Cypress, TX | 254.0 MWh | 50 mi |
| HEB00594 | The Woodlands, TX | 279.0 MWh | 46.4 mi |
| HEB00767 | Magnolia, TX | 165.0 MWh | 38.4 mi |
| Lewis Creek | Willis, TX | 2.0 TWh | 37 mi |
| Major Oak Power | Bremond, TX | 2.1 TWh | 47 mi |
| Montgomery County | Willis, TX | 5.9 TWh | 36.6 mi |
| Oak Grove (TX) | Franklin, TX | 10.9 TWh | 43.4 mi |
| OTHERTexasA&M | Bryan, TX | 1.3 GWh | 22 mi |
| Parliament Solar | TX | 281.0 GWh | 47.3 mi |
| Tenaska Frontier Generation Station | Shiro, TX | 3.4 TWh | 11.1 mi |
| WAL3390 | The Woodlands, TX | 282.0 MWh | 43.7 mi |
| WAL5045 | Tomball, TX | 314.0 MWh | 53 mi |
| WAL5091 | Cypress, TX | 288.0 MWh | 52.2 mi |
| WAL5287 | Spring, TX | 226.0 MWh | 52.6 mi |
| WAL602 | Spring, TX | 223.0 MWh | 52.5 mi |