Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| T Luhman CSG | Madison Energy Holdings LLC | Zumbrota, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Jul 2021 | Dec 2024 | Solar |
| Three Forks Water Power Project | Grizzly Mountain Ranch | Zenia, CA | California Independent System Operator (CISO) | 2.6 GWh | Nov 1984 | Dec 2024 | Water |
| Thanksgiving Fire Solar Farm, LLC | Sol Systems | Zebulon, NC | Duke Energy Progress East (CPLE) | 3.6 GWh | Nov 2019 | Dec 2024 | Solar |
| Towanda Facility | REV LNG SSL BC, LLC | Wyalusing, PA | PJM Interconnection, LLC (PJM) | 13.6 GWh | Dec 2020 | Dec 2024 | Natural Gas |
| Tyee Lake Hydroelectric Facility | Southeast Alaska Power Agency | Wrangell, AK | (NA) | 126.0 GWh | Jun 1983 | Dec 2024 | Water |
| Target Woodland Solar Project | MN8 Energy LLC | Woodland, CA | California Independent System Operator (CISO) | 2.9 GWh | Nov 2018 | Dec 2024 | Solar |
| Two Mile Solar | Cypress Creek Renewables | Winfall, NC | PJM Interconnection, LLC (PJM) | 8.8 GWh | May 2015 | Dec 2024 | Solar |
| The Village at Orchard Ridge (TVOR) | Distributed Solar Development, LLC | Winchester, VA | PJM Interconnection, LLC (PJM) | 2.2 GWh | Feb 2023 | Dec 2024 | Solar |
| Tims Ford | Tennessee Valley Authority | Winchester, TN | Tennessee Valley Authority (TVA) | 37.3 GWh | Feb 1972 | Dec 2024 | Water |
| Township of Monroe - Williamstown HS | Distributed Solar Development, LLC | Williamstown, NJ | PJM Interconnection, LLC (PJM) | 1.4 GWh | Nov 2022 | Dec 2024 | Solar |
| Township of Monroe - Williamstown MS | Distributed Solar Development, LLC | Williamstown, NJ | PJM Interconnection, LLC (PJM) | 1.7 GWh | Nov 2022 | Dec 2024 | Solar |
| Town of Williamson Landfill PV | MN8 Energy LLC | Williamson, NY | New York Independent System Operator (NYIS) | 1.4 GWh | Nov 2014 | Oct 2025 | Solar |
| Three Rivers Solar LLC | ASD Three Rivers Road MA Solar LLC | Wilbraham, MA | ISO New England (ISNE) | 154.0 MWh | Oct 2024 | Dec 2024 | Solar |
| The Source at White Plains (UBS) | Distributed Solar Development, LLC | White Plains, NY | New York Independent System Operator (NYIS) | 1.6 GWh | Mar 2022 | Dec 2024 | Solar |
| Timberline Trail Gas Recovery | WM Renewable Energy LLC | Weyerhaeser, WI | Midcontinent Independent System Operator, Inc. (MISO) | 18.9 GWh | Jan 2006 | Dec 2024 | Landfill Gas |
| Theodore Drive Community Solar | Theodore Drive Solar, LLC | Westminster, MA | ISO New England (ISNE) | 2.5 GWh | Feb 2018 | Dec 2024 | Solar |
| TES Rowtier | SkyHigh 2 Solar | Westminster, MA | ISO New England (ISNE) | 5.1 GWh | Mar 2021 | Dec 2024 | Solar |
| Twiss Street Solar | Citizens Enterprises Corporation | Westfield, MA | ISO New England (ISNE) | 2.2 GWh | Dec 2014 | Dec 2024 | Solar |
| Truck Stop | LSE Corona Austrina LLC | West Stockridge, MA | ISO New England (ISNE) | 2.8 GWh | Oct 2017 | Dec 2024 | Solar |
| Tippecanoe Solar Power Plant | Duke Energy Indiana, LLC | West Lafayette, IN | Midcontinent Independent System Operator, Inc. (MISO) | 2.7 GWh | Nov 2019 | Nov 2024 | Solar |
| Truman (NC) | Strata Manager, LLC | Wendell, NC | Duke Energy Progress East (CPLE) | 10.1 GWh | Nov 2019 | Dec 2024 | Solar |
| Thousand Springs | Idaho Power Co | Wendell, ID | Idaho Power Company (IPCO) | 54.8 GWh | Jul 1912 | Dec 2024 | Water |
| Trinity | U S Bureau of Reclamation | Weaverville, CA | Balancing Authority of Northern California (BANC) | 550.3 GWh | Jan 1964 | Oct 2025 | Water |
| Town of Halfmoon | Tesla Inc. | Waterford, NY | ISO New England (ISNE) | 1.5 GWh | May 2017 | Dec 2024 | Solar |
| TalenEnergy Montour | TalenEnergy Montour LLC | Washingtonville, PA | PJM Interconnection, LLC (PJM) | 4.8 TWh | Jan 1971 | Oct 2025 | Natural Gas |
| Terry 1818-WD | Standard Solar | Wasco, CA | California Independent System Operator (CISO) | 57.0 MWh | Nov 2024 | Dec 2024 | Solar |
| TPE RI WA2 Solar | TPE RI WA2, LLC | Warren, RI | ISO New England (ISNE) | 3.9 GWh | May 2024 | Dec 2024 | Solar |
| TPE RI WA1 Solar | TPE RI WA1, LLC | Warren, RI | ISO New England (ISNE) | 3.7 GWh | May 2024 | Dec 2024 | Solar |
| Tihonet Solar | Consolidated Edison Solutions Inc. | Wareham, MA | ISO New England (ISNE) | 1.8 GWh | Apr 2014 | Dec 2024 | Solar |
| Town of Ware - Canadian Tree(CSG) | MA CS Ware West, LLC | Ware, MA | ISO New England (ISNE) | 2.4 GWh | Nov 2021 | Dec 2024 | Solar |
| Twin Reservoirs | Walla Walla City of | Walla Walla, WA | Bonneville Power Administration (BPAT) | 7.3 GWh | Mar 1988 | Dec 2024 | Water |
| Tulare Akers Professional Center | SoCore Energy LLC | Visalia, CA | California Independent System Operator (CISO) | 1.6 GWh | Oct 2019 | Dec 2024 | Solar |
| The City of Vineland at West Vineland | Luminace Solar New Jersey, LLC | Vineland, NJ | PJM Interconnection, LLC (PJM) | 3.3 GWh | Sep 2011 | Dec 2024 | Solar |
| The City of Vineland at North Vineland | Luminace Solar New Jersey, LLC | Vineland, NJ | PJM Interconnection, LLC (PJM) | 4.1 GWh | Sep 2011 | Dec 2024 | Solar |
| Tres Port Power, LLC | Tres Power Victoria LLC | Victoria, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 60.8 GWh | Jun 2019 | Dec 2024 | Natural Gas |
| Tres City Power LLC | Tres Power Victoria LLC | Victoria, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 35.3 GWh | Jan 2020 | Dec 2024 | Natural Gas |
| Turnpike | Florida Power & Light Co | Vero Beach, FL | Florida Power & Light Co. (FPL) | 169.9 GWh | Dec 2023 | Oct 2025 | Solar |
| Tissington Solar | MN8 Energy LLC | Vernon Township, NJ | PJM Interconnection, LLC (PJM) | 3.7 GWh | Aug 2019 | Dec 2024 | Solar |
| Titan Solar Project | SE Titan, LLC | Van Horn, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 572.5 GWh | Nov 2021 | Oct 2025 | Solar |
| Town of Uxbridge MA at Commerce Dr | Luminace Solar Net Metering, LLC | Uxbridge, MA | ISO New England (ISNE) | 2.7 GWh | May 2012 | Dec 2024 | Solar |
| Three Corners Solar | Three Corners Solar, LLC | Unity, ME | ISO New England (ISNE) | 189.1 GWh | Jun 2024 | Oct 2025 | Solar |
| Tyngsborough Solar | Citizens Enterprises Corporation | Tyngsborough, MA | ISO New England (ISNE) | 4.0 GWh | Dec 2016 | Dec 2024 | Solar |
| Two Creeks Solar | Wisconsin Public Service Corp | Two Rivers, WI | Midcontinent Independent System Operator, Inc. (MISO) | 191.4 GWh | Oct 2020 | Oct 2025 | Solar |
| Two Dot Wind Farm | NorthWestern Energy (MT wind/thermal) | Two Dot, MT | NorthWestern Corporation (NWMT) | 34.8 GWh | May 2014 | Dec 2024 | Wind |
| Tuttle | Western Farmers Elec Coop, Inc | Tuttle, OK | Southwest Power Pool (SWPP) | 4.2 GWh | Feb 2017 | Oct 2025 | Solar |
| Tuscarora Geothermal Power Plant | Ormat Nevada Inc | Tuscarora, NV | Nevada Power Company (NEVP) | 124.4 GWh | Dec 2011 | Dec 2024 | Geothermal |
| Tulsa | Public Service Co of Oklahoma | Tulsa, OK | Southwest Power Pool (SWPP) | 384.5 GWh | Oct 1956 | Dec 2024 | Natural Gas |
| Tulare BioMAT Fuel Cell | Central CA Fuel Cell 2, LLC | Tulare, CA | California Independent System Operator (CISO) | 13.7 GWh | Nov 2019 | Jul 2024 | Natural Gas : 63.4% Other Biomass Gas : 36.6% |
| TWC | Bravo REC Management LLC | Tulare, CA | California Independent System Operator (CISO) | 918.0 MWh | Jul 2024 | Dec 2024 | Solar |
| Tulare CSG LLC | Dimension Energy LLC | Tulare, CA | California Independent System Operator (CISO) | 375.0 MWh | Sep 2024 | Dec 2024 | Solar |
| Tulare 1 and 2 | Arevon Energy, Inc. | Tulare, CA | California Independent System Operator (CISO) | 5.3 GWh | Dec 2013 | Dec 2024 | Solar |
| TJX Tucson | SoCore Energy LLC | Tucson, AZ | Tucson Electric Power (TEPC) | 2.2 GWh | Jan 2018 | Dec 2024 | Solar |
| Tech Park Solar | Big Sky Wind, LLC | Tucson, AZ | Tucson Electric Power (TEPC) | 11.8 GWh | Nov 2012 | Dec 2024 | Solar |
| Thorpe | Duke Energy Carolinas, LLC | Tuckasegee, NC | Duke Energy Carolinas (DUK) | 56.7 GWh | Sep 1941 | Dec 2024 | Water |
| Tuckasegee | Duke Energy Carolinas, LLC | Tuckasegee, NC | Duke Energy Carolinas (DUK) | 4.2 GWh | Apr 1950 | Dec 2024 | Water |
| Tennessee Creek | Duke Energy Carolinas, LLC | Tuckasegee, NC | Duke Energy Carolinas (DUK) | 36.8 GWh | Apr 1955 | Dec 2024 | Water |
| TG East | TG East Wind Project LLC | Truscott, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 953.0 GWh | Mar 2022 | Oct 2025 | Wind |
| Truman | City of Truman | Truman, MN | Midcontinent Independent System Operator, Inc. (MISO) | 39.0 MWh | Aug 1938 | Dec 2024 | Distillate Fuel Oil |
| Troy Solar | Southern Indiana Gas & Elec Co | Troy, IN | Midcontinent Independent System Operator, Inc. (MISO) | 95.1 GWh | Mar 2021 | Oct 2025 | Solar |
| Troupsburg | Solar Planet Power | Troupsburg, NY | New York Independent System Operator (NYIS) | 7.2 GWh | Nov 2020 | Dec 2024 | Solar |
| Trona Solar III | Trona Solar III LLC | Trona, CA | California Independent System Operator (CISO) | 4.5 GWh | Mar 2023 | Dec 2024 | Solar |
| Trinity Solar | Capital Dynamics | Trinity, NC | Duke Energy Carolinas (DUK) | 7.4 GWh | Jul 2019 | Dec 2024 | Solar |
| Trinidad (TX) | Luminant Generation Company LLC | Trinidad, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 376.4 GWh | Apr 1965 | Dec 2024 | Natural Gas |
| Trinidad (CO) | City of Trinidad - (CO) | Trinidad, CO | Western Area Power Administration - Rocky Mountain Region (WACM) | 5.0 MWh | Apr 1950 | Dec 2024 | Distillate Fuel Oil |
| Trimont Area Wind Farm | Avangrid Power LLC | Trimont, MN | Midcontinent Independent System Operator, Inc. (MISO) | 378.9 GWh | Oct 2005 | Dec 2024 | Wind |
| Trenton Solar Farm | Public Service Elec & Gas Co | Trenton, NJ | PJM Interconnection, LLC (PJM) | 1.6 GWh | Sep 2010 | Dec 2024 | Solar |
| Trenton South | Trenton Municipal Utilities - (MO) | Trenton, MO | Southwest Power Pool (SWPP) | 140.0 MWh | Jun 2000 | Dec 2024 | Distillate Fuel Oil |
| Trenton North | Trenton Municipal Utilities - (MO) | Trenton, MO | Southwest Power Pool (SWPP) | 157.0 MWh | May 1974 | Dec 2024 | Distillate Fuel Oil |
| Trenton Solar Farm (MO) | Missouri Jnt Muni.Pwr Elec. Ut. Comm. | Trenton, MO | Southwest Power Pool (SWPP) | 4.6 GWh | Oct 2015 | Dec 2024 | Solar |
| Trenton West | Generate Capital | Trenton, IL | PJM Interconnection, LLC (PJM) | 2.2 GWh | May 2024 | Dec 2024 | Solar |
| Trenton East | Generate Capital | Trenton, IL | PJM Interconnection, LLC (PJM) | 1.7 GWh | May 2024 | Dec 2024 | Solar |
| Trenton Solar Power Plant | Duke Energy Florida, LLC | Trenton, FL | Duke Energy Florida, Inc. (FPC) | 171.9 GWh | Nov 2019 | Oct 2025 | Solar |
| Trent Wind Farm | Trent Wind Farm LLC | Trent, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 515.0 GWh | Jun 2001 | Dec 2024 | Wind |
| TCLP Solar Phase 1 | Heritage Sustainable Energy. LLC | Traverse City, MI | Midcontinent Independent System Operator, Inc. (MISO) | 1.5 GWh | Sep 2017 | Dec 2024 | Solar |
| Tranquillity ID | Tranquillity Solar 1, LLC | Tranquillity, CA | California Independent System Operator (CISO) | 2.8 GWh | Feb 2018 | Dec 2024 | Solar |
| Traer Wind Project | City of Traer - (IA) | Traer, IA | Midcontinent Independent System Operator, Inc. (MISO) | 5.8 GWh | Sep 2010 | Dec 2024 | Wind |
| Tracy Combined Cycle Power Plant | MRP San Joaquin Energy LLC. | Tracy, CA | California Independent System Operator (CISO) | 959.9 GWh | Mar 2003 | Oct 2025 | Natural Gas |
| Tracy 210 | Costco Wholesale | Tracy, CA | California Independent System Operator (CISO) | 21.2 GWh | Feb 2019 | Dec 2024 | Natural Gas |
| Tower | Wolverine Power Supply Coop | Tower, MI | Midcontinent Independent System Operator, Inc. (MISO) | 62.0 MWh | Feb 1971 | Dec 2024 | Distillate Fuel Oil |
| Torrington Solar One, LLC | DG Connecticut III, LLC | Torrington, CT | ISO New England (ISNE) | 3.2 GWh | Feb 2021 | Dec 2024 | Solar |
| Torrington Terminal | Connecticut Jet Power LLC | Torrington, CT | ISO New England (ISNE) | 146.0 MWh | Oct 1967 | Dec 2024 | Kerosene |
| Torrance Refining Company, LLC | Torrance Refining Company, LLC | Torrance, CA | California Independent System Operator (CISO) | 78.6 GWh | Aug 1983 | Oct 2025 | Other Gas : 71.5% Waste Heat : 28.5% |
| Tatanka Ridge | Tatanka Ridge LLC | Toronto, SD | Midcontinent Independent System Operator, Inc. (MISO) | 594.5 GWh | Dec 2020 | Oct 2025 | Wind |
| Toms River CSG | MN8 Energy LLC | Toms River, NJ | PJM Interconnection, LLC (PJM) | 6.5 GWh | Aug 2023 | Dec 2024 | Solar |
| Tom's River (Lowes) | Madison Energy Investments LLC | Toms River, NJ | PJM Interconnection, LLC (PJM) | 1.3 GWh | Dec 2022 | Dec 2024 | Solar |
| Tomahawk | Wisconsin Public Service Corp | Tomahawk, WI | Midcontinent Independent System Operator, Inc. (MISO) | 10.8 GWh | Dec 1937 | Dec 2024 | Water |
| Tolland Solar NG LLC | NuGen Capital Management | Tolland, MA | ISO New England (ISNE) | 5.0 GWh | Sep 2014 | Dec 2024 | Solar |
| Tolland | Sunrise on Clubhouse Rd. LLC | Tolland, MA | ISO New England (ISNE) | 8.3 GWh | Nov 2020 | Dec 2024 | Solar |
| Toksook Bay | Alaska Village Elec Coop, Inc | Toksook Bay, AK | 3.8 GWh | Jul 2005 | Dec 2024 | Distillate Fuel Oil | |
| Tok | Alaska Power and Telephone Co | Tok, AK | 11.4 GWh | Sep 1985 | Dec 2024 | Distillate Fuel Oil | |
| Togiak | Alaska Village Elec Coop, Inc | Togiak, AK | 2.9 GWh | Oct 1986 | Dec 2024 | Distillate Fuel Oil | |
| Tiverton Power Plant | Tiverton Power LLC | Tiverton, RI | ISO New England (ISNE) | 1.7 TWh | Feb 2000 | Dec 2024 | Natural Gas |
| Titusville Solar | Janssen Pharmaceutical Co | Titusville, NJ | PJM Interconnection, LLC (PJM) | 2.8 GWh | Aug 2010 | Dec 2024 | Solar |
| Tisbury Landfill Solar | Clean Focus Yield, LLC | Tisbury, MA | ISO New England (ISNE) | 1.5 GWh | Jun 2014 | Dec 2024 | Solar |
| Tipton | City of Tipton - (IA) | Tipton, IA | Midcontinent Independent System Operator, Inc. (MISO) | 69.0 MWh | Oct 1955 | Dec 2024 | Distillate Fuel Oil |
| Tipton Solar Park | Indiana Municipal Power Agency | Tipton, IN | Midcontinent Independent System Operator, Inc. (MISO) | 9.1 GWh | Jun 2019 | Dec 2024 | Solar |
| Tipton 2 - (CA) | Pacifico Power | Tipton, CA | California Independent System Operator (CISO) | 83.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Tipton 1 - (CA) | Pacifico Power | Tipton, CA | California Independent System Operator (CISO) | 167.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Tinton Falls Solar Farm | Tinton Falls Solar | Tinton Falls, NJ | PJM Interconnection, LLC (PJM) | 43.3 GWh | Oct 2012 | Dec 2023 | Solar |
| Timonium Fairgrounds | Madison Energy Holdings LLC | Timonium, MD | PJM Interconnection, LLC (PJM) | 2.8 GWh | Sep 2020 | Dec 2024 | Solar |
Summary of Power Plants By State
Figures are based on October 2025 generation numbers.| State | Rank | Active Plants | Oct 2025 Generation |
|---|---|---|---|
| Alabama | # 7 | 76 | 11,041.22 GWh |
| Alaska | # 49 | 144 | 484.88 GWh |
| Arizona | # 11 | 184 | 9,400.73 GWh |
| Arkansas | # 24 | 116 | 5,068.08 GWh |
| California | # 4 | 1,734 | 16,078.58 GWh |
| Colorado | # 30 | 302 | 4,272.03 GWh |
| Connecticut | # 38 | 166 | 3,176.41 GWh |
| Delaware | # 48 | 33 | 521.87 GWh |
| District of Columbia | # 51 | 16 | 15.93 GWh |
| Florida | # 2 | 321 | 22,593.36 GWh |
| Georgia | # 6 | 262 | 11,885.65 GWh |
| Hawaii | # 47 | 73 | 845.96 GWh |
| Idaho | # 44 | 147 | 1,448.54 GWh |
| Illinois | # 5 | 382 | 15,897.55 GWh |
| Indiana | # 12 | 211 | 9,138.69 GWh |
| Iowa | # 18 | 292 | 6,552.01 GWh |
| Kansas | # 31 | 187 | 4,138.18 GWh |
| Kentucky | # 23 | 60 | 5,089.89 GWh |
| Louisiana | # 14 | 86 | 8,618.27 GWh |
| Maine | # 45 | 215 | 1,114.12 GWh |
| Maryland | # 35 | 203 | 3,540.16 GWh |
| Massachusetts | # 41 | 648 | 1,963.73 GWh |
| Michigan | # 9 | 272 | 10,045.59 GWh |
| Minnesota | # 27 | 765 | 4,687.69 GWh |
| Mississippi | # 20 | 57 | 6,085.50 GWh |
| Missouri | # 21 | 127 | 5,515.65 GWh |
| State | Rank | Active Plants | Oct 2025 Generation |
|---|---|---|---|
| Montana | # 40 | 71 | 2,455.83 GWh |
| Nebraska | # 36 | 129 | 3,412.31 GWh |
| Nevada | # 33 | 114 | 3,578.95 GWh |
| New Hampshire | # 43 | 60 | 1,661.03 GWh |
| New Jersey | # 25 | 393 | 4,903.52 GWh |
| New Mexico | # 37 | 143 | 3,370.59 GWh |
| New York | # 8 | 956 | 10,108.60 GWh |
| North Carolina | # 13 | 906 | 9,082.37 GWh |
| North Dakota | # 34 | 60 | 3,554.85 GWh |
| Ohio | # 10 | 197 | 9,920.42 GWh |
| Oklahoma | # 17 | 142 | 7,167.46 GWh |
| Oregon | # 26 | 275 | 4,755.34 GWh |
| Pennsylvania | # 3 | 256 | 16,669.60 GWh |
| Rhode Island | # 46 | 100 | 886.30 GWh |
| South Carolina | # 15 | 208 | 8,061.53 GWh |
| South Dakota | # 42 | 52 | 1,892.35 GWh |
| Tennessee | # 22 | 88 | 5,198.50 GWh |
| Texas | # 1 | 947 | 48,837.92 GWh |
| Utah | # 39 | 125 | 3,044.05 GWh |
| Vermont | # 50 | 117 | 151.45 GWh |
| Virginia | # 19 | 239 | 6,515.03 GWh |
| Washington | # 16 | 137 | 7,971.98 GWh |
| West Virginia | # 29 | 39 | 4,608.16 GWh |
| Wisconsin | # 28 | 250 | 4,687.23 GWh |
| Wyoming | # 32 | 70 | 3,770.47 GWh |