Two Dot Wind Farm
8794 US Highway 12, Two Dot, MT 59085Plant Summary Information
Two Dot Wind Farm is ranked #48 out of 71 power plants in Montana in terms of total annual net electricity generation.
Two Dot Wind Farm generated 8.9 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Two Dot Wind Farm |
|---|---|
| Utility Name | NorthWestern Energy (MT wind/thermal) |
| Location | Wheatland County, MT |
| Initial Operation Date | June 2014 |
| Last Update | Dec 2025 |
| Annual Generation | 28.8 GWh |
| Annual Consumption | 115.7 k MMBtu |
| Ranked #4,911 out of 13,081 Power Plants Nationwide | |
| Ranked #1,066 out of 1,366 Wind Power Plants Nationwide | |
| Ranked #48 out of 71 Montana Power Plants | |
| Ranked #18 out of 23 Montana Wind Power Plants | |
| Fuel Types | Wind |
| Previous Operators |
NJR Clean Energy Ventures Corporation (2013 to 2017) NorthWestern Energy (2018 to 2020) NorthWestern Energy (MT wind/thermal) (2021 to 2025) |
Map of Two Dot Wind Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Two Dot Wind Farm.
Monthly Net Generation for Two Dot Wind Farm
Monthly Plant Fuel Consumption for Two Dot Wind Farm
Two Dot Wind Farm Details
| Summary Information | |
|---|---|
| Plant Name | Two Dot Wind Farm (59003) |
| Plant Address | 8794 US Highway 12, Two Dot, MT 59085 |
| Utility | NorthWestern Energy (MT wind/thermal) (56815) |
| Latitude, Longitude | 46.44944, -110.08722 |
| Generation Dates on File | Jun 2014 to Dec 2025 |
| Initial Operation Date | June 2014 |
| Annual Generation | 28.8 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | QF10-668-000 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | WECC |
| Balancing Authority | NorthWestern Energy (NWMT) (NWMT) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | NorthWestern Energy LLC - (MT) (12825) MT |
| Grid Voltage | 100.00 kV |
| Energy Storage | No |
Generator 1 Details Operating June 2014
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 9.7 MW |
| Summer Capacity | 9.7 MW |
| Winter Capacity | 9.7 MW |
| Minimum Load | 1.6 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | June 2014 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 6 |
| Turbine Details | |
| Number Of Turbines | 6 |
|---|---|
| Predominant Turbine Manufacturer | GE |
| Predominant Turbine Model Number | 1.62-82.5 |
| Design Wind Speed | 19.2 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 260 |
Two Dot Wind Farm Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1056 | Berkshire Wind Power Project | Lanesboro, MA | 31.9 GWh |
| #1057 | Windom Wind Project | Bingham Lake, MN | 31.7 GWh |
| #1058 | Mountain Home | Mountain Home, ID | 31.2 GWh |
| #1059 | Willow Spring Windfarm (Burnt River) | Huntington, OR | 30.5 GWh |
| #1060 | Diablo Winds LLC | Livermore, CA | 30.5 GWh |
| #1061 | Pilgrim Stage Wind Park | Hagerman, ID | 30.1 GWh |
| #1062 | Anderson Wind II | Hagerman, NM | 30.0 GWh |
| #1063 | Creston Ridge Wind Farm | Creston, NE | 29.9 GWh |
| #1064 | CED Mason City Wind | Mason City, IA | 29.5 GWh |
| #1065 | Creston Ridge II, LLC | Creston, NE | 29.0 GWh |
| #1067 | Thousand Springs Wind Park | Hagerman, ID | 28.6 GWh |
| #1068 | CED Manchester Wind | Manchester, IA | 28.5 GWh |
| #1069 | Pisgah Mountain Wind | Clifton, ME | 28.3 GWh |
| #1070 | Golden Valley Wind Park LLC | Burley, ID | 27.9 GWh |
| #1071 | Fairfield Wind | Fairfield, MT | 27.7 GWh |
| #1072 | Tuana Gulch Wind Park | Hagerman, ID | 27.4 GWh |
| #1073 | Tuana Springs | Hagerman, ID | 27.1 GWh |
| #1074 | Musselshell Wind Project Two LLC | Shawmut, MT | 26.5 GWh |
| #1075 | Benson Creek Windfarm (Burnt River) | Huntington, OR | 26.3 GWh |
| #1076 | Chopin Wind LLC | Milton-Freewater, OR | 26.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Two Dot Wind Farm.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Beaver Creek Wind Facility | Big Timber, MT | 531.1 GWh | 44.3 mi |
| Big Timber Wind Farm | Big Timber, MT | 79.2 GWh | 46.1 mi |
| Broadwater Power Project | Toston, MT | 27.9 GWh | 67 mi |
| Canyon Ferry | Helena, MT | 273.1 GWh | 79.2 mi |
| GCC Trident Solar Project | Three Forks, MT | 7.0 GWh | 74.7 mi |
| Gordon Butte Wind LLC | Martinsdale, MT | 66.5 GWh | 12.2 mi |
| Hauser | Helena, MT | 128.4 GWh | 88.2 mi |
| Judith Gap Wind Energy Center | Harlowton, MT | 406.8 GWh | 18 mi |
| Magpie Solar, LLC | Lavina, MT | 4.8 GWh | 55.9 mi |
| MTSUN | Billings, MT | 126.9 GWh | 82.1 mi |
| Musselshell Wind Project | Shawmut, MT | 23.1 GWh | 31.2 mi |
| Musselshell Wind Project Two LLC | Shawmut, MT | 26.5 GWh | 31.2 mi |
| Mystic | Fishtail, MT | 52.5 GWh | 86 mi |
| River Bend Solar, LLC (MT) | Reed Point, MT | 3.1 GWh | 57.3 mi |
| South Peak Wind | Geyser, MT | 272.5 GWh | 65.7 mi |
| Spion Kop Wind Farm | Geyser, MT | 97.7 GWh | 66.4 mi |
| Stillwater Wind, LLC | Reed Point, MT | 269.2 GWh | 49.8 mi |
| Two Dot Wind Broadview East LLC | Broadview, MT | 4.2 GWh | 65.7 mi |
| Western Sugar Cooperative - Billings | Billings, MT | 3.0 GWh | 89.6 mi |
| Yellowstone County Generating Station | Laurel, MT | 400.1 GWh | 83.8 mi |