Trenton West Phase 2

304 Highline Rd, Trenton, IL 62293

Plant Summary Information

Trenton West Phase 2 is ranked #339 out of 365 solar farms in Illinois in terms of total annual net electricity generation.

Trenton West Phase 2 generated 213.0 MWh during the 3-month period between September 2025 to December 2025.

Plant NameTrenton West Phase 2
Utility NameGenerate Capital
LocationClinton County, IL
Initial Operation DateNovember 2025
Last Update Dec 2025
Annual Generation 213.0 MWh
Annual Consumption 727 MMBtu
Ranked #12,702 out of 13,269 Power Plants Nationwide
Ranked #7,075 out of 7,183 Solar Power Plants Nationwide
Ranked #494 out of 541 Illinois Power Plants
Ranked #339 out of 365 Illinois Solar Power Plants
Fuel Types Solar

Map of Trenton West Phase 2

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Trenton West Phase 2.

Create Your Account Today

Monthly Net Generation for Trenton West Phase 2

Monthly Plant Fuel Consumption for Trenton West Phase 2

Trenton West Phase 2 Details

Summary Information
Plant NameTrenton West Phase 2 (69599)
Plant Address304 Highline Rd, Trenton, IL 62293
UtilityGenerate Capital (61194)
Latitude, Longitude38.58241, -89.70014
Generation Dates on FileNov 2025 to Dec 2025
Initial Operation DateNovember 2025
Annual Generation 213.0 MWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusYes
FERC Small Power Producer Docket Number25-374-000,25-374-001
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionMRO
Balancing AuthorityMidcontinent Independent Transmission System Operator, Inc.. (MISO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment
Transmission / Distribution OwnerAmeren Illinois Company (56697) IL
Grid Voltage 12.47 kV
Energy StorageNo

Generator 11129 Details Operating November 2025

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipWholly Owned by Other Entity
Nameplate Capacity2 MW
Summer Capacity2 MW
Winter Capacity2 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2025
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solar Details
Single Axis TrackingYes
Azimuth Angle90
Tilt Angle45
DC Net Capacity3 MW
Crystalline SiliconYes
Net Metering AgreementNo
Virtual Net Metering AgreementNo

Trenton West Phase 2 Plant Owners

Owner NameAddressOwnership
Generate Community Solar IX, LLC455 The Embarcadero Suite 200,, San Francisco, CA 94111100.00%

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#7065Hellyer Solar FarmSan Jose, CA241.0 MWh
#7066MN CSG 2019-113Montevideo, MN237.0 MWh
#7067NSF Marshall Site 1Marshall, NY237.0 MWh
#7068Pickering SolarPhoenixville, PA236.6 MWh
#7069SL JAMESTOWN ARRAY 2Jamestown, NY234.0 MWh
#7070Biltmore Solar FieldsAsheville, NC234.0 MWh
#7071USS Clear Creek SolarVirginia, IL232.0 MWh
#7072NL VA - Dry ForkChatham, VA227.0 MWh
#7073SAE Ottawa ILOttawa, IL225.0 MWh
#7074Peoria Solar 3Dunlap, IL219.0 MWh
#7076NL IL - McConnell RoadRock City, IL208.0 MWh
#7077North Ninth StreetRochelle, IL1.4 GWh
#7078Vermilion Solar I LLC CSGPontiac, IL200.0 MWh
#7079GreenfieldCoon Valley, WI200.0 MWh
#7080Heartland Community CollegeNormal, IL4.5 GWh
#7081Johnson City SolarJohnson City, NY196.0 MWh
#7082NSF Marshall Site 3Marshall, NY191.0 MWh
#7083SV CSG Gander Farms 1 ACarterville, IL188.0 MWh
#7084TAC-Distributed Energy Resource HybridChampaign, IL294.0 MWh
#7085Pluma - Curry Road NorthClovis, NM186.0 MWh

Nearby Power Plants

Below are closest 20 power plants surrounding Trenton West Phase 2.

Plant NamePlant LocationAnnual GenerationDistance
AES Belleville Solar LLCBelleville, IL5.9 GWh18.2 mi
BreeseBreese, IL539.0 MWh9.6 mi
CarlyleCarlyle, IL208.0 MWh18.6 mi
Clinton Solar 4 LLC CSGCarlyle, IL2.9 GWh23 mi
Clinton Solar 4bCarlyle, IL2.1 GWh23.1 mi
Edwardsville Solar IIEdwardsville, IL4.1 GWh22.7 mi
FreeburgFreeburg, IL145.0 MWh15.9 mi
Granite City WorksGranite City, IL446.0 GWh24.4 mi
HighlandHighland, IL222.5 MWh11 mi
Milam Gas RecoveryEast St. Lois, IL19.4 GWh23.9 mi
Millstadt IL 1, LLCBelleville, IL2.3 GWh19.8 mi
Mulberry Solar, LLCGranite City, IL4.0 GWh25.6 mi
Prairie State Generating StationMarissa, IL12.3 TWh21 mi
Schmidt CSG 1Belleville, IL4.2 GWh15.1 mi
South Belleville Solar, LLCSmithton Township, IL385.0 MWh17.1 mi
St. Clair Solar 3Washington Park, IL3.5 GWh21.1 mi
St. Clair Solar 5Lebanon, IL1.5 GWh5.9 mi
Trenton EastTrenton, IL3.7 GWh0.5 mi
Trenton East Phase 2Trenton, IL245.0 MWh1.3 mi
Trenton WestTrenton, IL2.6 GWh0 mi