Trenton Solar Power Plant
TBD, Trenton, FL 32693Plant Summary Information
Trenton Solar Power Plant is ranked #44 out of 221 solar farms in Florida in terms of total annual net electricity generation.
Trenton Solar Power Plant generated 30.0 GWh during the 3-month period between November 2025 to February 2026.
| Plant Name | Trenton Solar Power Plant |
|---|---|
| Utility Name | Duke Energy Florida, LLC |
| Location | Gilchrist County, FL |
| Initial Operation Date | December 2019 |
| Last Update | Feb 2026 |
| Annual Generation | 174.2 GWh |
| Annual Consumption | 632.5 k MMBtu |
| Ranked #2,719 out of 12,637 Power Plants Nationwide | |
| Ranked #528 out of 6,487 Solar Power Plants Nationwide | |
| Ranked #111 out of 327 Florida Power Plants | |
| Ranked #44 out of 221 Florida Solar Power Plants | |
| Fuel Types | Solar |
Map of Trenton Solar Power Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Trenton Solar Power Plant.
Monthly Net Generation for Trenton Solar Power Plant
Monthly Plant Fuel Consumption for Trenton Solar Power Plant
Trenton Solar Power Plant Details
| Summary Information | |
|---|---|
| Plant Name | Trenton Solar Power Plant (62543) |
| Plant Address | TBD, Trenton, FL 32693 |
| Utility | Duke Energy Florida, LLC (6455) |
| Latitude, Longitude | 29.63505, -82.84309 |
| Generation Dates on File | Dec 2019 to Feb 2026 |
| Initial Operation Date | December 2019 |
| Annual Generation | 174.2 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | SERC |
| Balancing Authority | Duke Energy Florida Inc (FPC) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Duke Energy Florida, LLC (6455) FL |
| Grid Voltage | 69.00 kV |
| Energy Storage | No |
Generator PV1 Details Operating December 2019
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 74.9 MW |
| Summer Capacity | 74.9 MW |
| Winter Capacity | 74.9 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2019 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Solar |
| Time From Cold Shutdown To Full Load | 1H |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 104.9 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Trenton Solar Power Plant Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #518 | Cedar Trail | Glen St Mary, FL | 177.5 GWh |
| #519 | Skeleton Creek Energy Center Hybrid | Carrier, OK | 996.5 GWh |
| #520 | Roaring Springs, LLC | Motley, TX | 176.3 GWh |
| #521 | Oriana Solar LLC | Victoria, TX | 175.5 GWh |
| #522 | Goose Prairie Solar | Moxee, WA | 175.3 GWh |
| #523 | Escape Solar Plant | TBD, NV | 171.8 GWh |
| #524 | RE Barren Ridge 1 | Mojave, CA | 175.0 GWh |
| #525 | Wild Azalea Solar Energy Center | Chattahoochee, FL | 174.8 GWh |
| #526 | Rice Creek | Putnam, FL | 174.6 GWh |
| #527 | Lone Star Solar | Cameron, SC | 172.7 GWh |
| #529 | Cutlass Solar 1 LLC | Richmond, TX | 173.8 GWh |
| #530 | Sambucus | Myakka City, FL | 173.8 GWh |
| #531 | Harts Mill Solar, LLC | Tarboro, NC | 173.5 GWh |
| #532 | Sweetwater Solar | Green River, WY | 172.9 GWh |
| #533 | FPL Cypress Pond Solar | Vernon, FL | 172.9 GWh |
| #534 | Hornshadow Solar, LLC | Castle Dale, UT | 172.7 GWh |
| #535 | Chautauqua Solar Energy Center | Defuniak Springs, FL | 172.2 GWh |
| #536 | Duette Solar Power Plant | Parrish, FL | 171.8 GWh |
| #537 | SR Terrell | Dawson, GA | 171.5 GWh |
| #538 | Turnpike | Vero Beach, FL | 171.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Trenton Solar Power Plant.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bell Ridge Solar | Trenton, FL | 194.6 GWh | 9.8 mi |
| Bronson Solar | Bronson, FL | 81.6 GWh | 17.7 mi |
| Butler Plaza | Gainesville, FL | 1.9 GWh | 27.8 mi |
| Columbia County Solar | Fort White, FL | 191.9 GWh | 18.3 mi |
| Columbia Solar Power Plant | Fort White, FL | 159.5 GWh | 19.2 mi |
| County Line Renewable Energy Center | High Springs, FL | 185.5 GWh | 15.8 mi |
| Deerhaven Generating Station | Gainesville, FL | 623.9 GWh | 28.6 mi |
| Deerhaven Renewable | Gainesville, FL | 519.6 GWh | 28.3 mi |
| Gilchrist County Solar | Newberry, FL | 200.2 GWh | 10.4 mi |
| Hardeetown Solar Power Plant | Chiefland, FL | 170.2 GWh | 10.3 mi |
| High Springs Solar Power Plant | High Springs, FL | 165.0 GWh | 17.2 mi |
| Hildreth Solar Power Plant | O'Brien, FL | 184.1 GWh | 22.8 mi |
| John R Kelly | Gainesville, FL | 807.2 GWh | 31.4 mi |
| MLH 2 | Gainesville, FL | 1.2 GWh | 33.4 mi |
| MLH 3 | Gainesville, FL | 1.1 GWh | 33.4 mi |
| Santa Fe Solar Power Plant | Fort White, FL | 152.7 GWh | 18.2 mi |
| Solar Park Gainesville, LLC | Gainesville, FL | 1.5 GWh | 30.7 mi |
| South Energy Center | Gainesville, FL | 49.3 GWh | 30.2 mi |
| University of Florida | Gainesville, FL | 379.0 GWh | 29.7 mi |
| Whistling Duck I | Williston, FL | 26.3 GWh | 27.2 mi |