Trenton Solar Power Plant
TBD, Trenton, FL 32693Plant Summary Information
Trenton Solar Power Plant is ranked #32 out of 207 solar farms in Florida in terms of total annual net electricity generation.
Trenton Solar Power Plant generated 43.0 GWh during the 3-month period between July 2025 to October 2025.
| Plant Name | Trenton Solar Power Plant |
|---|---|
| Utility Name | Duke Energy Florida, LLC |
| Location | Gilchrist County, FL |
| Initial Operation Date | December 2019 |
| Last Update | Oct 2025 |
| Annual Generation | 171.9 GWh |
| Annual Consumption | 628.3 k MMBtu |
| Ranked #2,690 out of 12,553 Power Plants Nationwide | |
| Ranked #497 out of 6,410 Solar Power Plants Nationwide | |
| Ranked #99 out of 313 Florida Power Plants | |
| Ranked #32 out of 207 Florida Solar Power Plants | |
| Fuel Types | Solar |
Map of Trenton Solar Power Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Trenton Solar Power Plant.
Monthly Net Generation for Trenton Solar Power Plant
Trenton Solar Power Plant Details
| Summary Information | |
|---|---|
| Plant Name | Trenton Solar Power Plant (62543) |
| Plant Address | TBD, Trenton, FL 32693 |
| Utility | Duke Energy Florida, LLC (6455) |
| Latitude, Longitude | 29.63505, -82.84309 |
| Generation Dates on File | Dec 2019 to Oct 2025 |
| Initial Operation Date | December 2019 |
| Annual Generation | 171.9 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | SERC |
| Balancing Authority | Duke Energy Florida Inc (FPC) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Duke Energy Florida, LLC (6455) FL |
| Grid Voltage | 69.00 kV |
| Energy Storage | No |
Generator PV1 Details Operating December 2019
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 74.9 MW |
| Summer Capacity | 74.9 MW |
| Winter Capacity | 74.9 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2019 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Solar |
| Time From Cold Shutdown To Full Load | 1H |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 104.9 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Trenton Solar Power Plant Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #487 | Pickaway Solar | Williamsport, OH | 173.3 GWh |
| #488 | Sweetwater Solar | Green River, WY | 173.3 GWh |
| #489 | Fall River Solar, LLC | Edgemont, SD | 172.8 GWh |
| #490 | Harmony Florida Solar II | Kissimmee, FL | 172.6 GWh |
| #491 | Southampton Solar, LLC | Newsoms, VA | 172.6 GWh |
| #492 | Three Creeks | Parrish, FL | 172.5 GWh |
| #493 | Kayak | TBD, FL | 172.5 GWh |
| #494 | Cane Creek | Pachuta, MS | 172.3 GWh |
| #495 | Wild Azalea Solar Energy Center | Chattahoochee, FL | 172.2 GWh |
| #496 | Phobos Solar, LLC | Middlesex, NC | 172.2 GWh |
| #498 | Goose Prairie Solar | Moxee, WA | 171.7 GWh |
| #499 | Gunsight Solar, LLC | Swansea, SC | 171.5 GWh |
| #500 | Harts Mill Solar, LLC | Tarboro, NC | 171.0 GWh |
| #501 | Cutlass Solar 1 LLC | Richmond, TX | 170.4 GWh |
| #502 | SR Terrell | Dawson, GA | 170.4 GWh |
| #503 | Turnpike | Vero Beach, FL | 169.9 GWh |
| #504 | Duette Solar Power Plant | Parrish, FL | 168.7 GWh |
| #505 | CPV Stagecoach Solar | Andersonville, GA | 168.6 GWh |
| #506 | Bulldog Solar LLC | Warrenton, GA | 167.9 GWh |
| #507 | Aulander Holloman Solar, LLC | Aulander, NC | 167.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Trenton Solar Power Plant.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bell Ridge Solar | Trenton, FL | 195.3 GWh | 9.8 mi |
| Bronson Solar | Bronson, FL | 31.1 GWh | 17.7 mi |
| Butler Plaza | Gainesville, FL | 1.9 GWh | 27.8 mi |
| Columbia County Solar | Fort White, FL | 194.8 GWh | 18.3 mi |
| Columbia Solar Power Plant | Fort White, FL | 158.1 GWh | 19.2 mi |
| County Line Renewable Energy Center | High Springs, FL | 185.6 GWh | 15.8 mi |
| Deerhaven Generating Station | Gainesville, FL | 689.1 GWh | 28.6 mi |
| Deerhaven Renewable | Gainesville, FL | 365.2 GWh | 28.3 mi |
| Gilchrist County Solar | Newberry, FL | 196.6 GWh | 10.4 mi |
| Hardeetown Solar Power Plant | Chiefland, FL | 159.0 GWh | 10.3 mi |
| High Springs Solar Power Plant | High Springs, FL | 162.6 GWh | 17.2 mi |
| Hildreth Solar Power Plant | O'Brien, FL | 183.3 GWh | 22.8 mi |
| John R Kelly | Gainesville, FL | 807.2 GWh | 31.4 mi |
| MLH 2 | Gainesville, FL | 1.2 GWh | 33.4 mi |
| MLH 3 | Gainesville, FL | 1.1 GWh | 33.4 mi |
| Santa Fe Solar Power Plant | Fort White, FL | 155.5 GWh | 18.2 mi |
| Solar Park Gainesville, LLC | Gainesville, FL | 1.5 GWh | 30.7 mi |
| South Energy Center | Gainesville, FL | 49.3 GWh | 30.2 mi |
| Union Springs Solar Center | Lake Butler, FL | 146.5 GWh | 40.1 mi |
| University of Florida | Gainesville, FL | 379.0 GWh | 29.7 mi |