Trent Wind Farm
1423 CR 131, Trent, TX 79561Plant Summary Information
Trent Wind Farm is ranked #100 out of 219 wind farms in Texas in terms of total annual net electricity generation.
Trent Wind Farm generated 133.7 GWh during the 3-month period between September 2023 to December 2023.
Plant Name | Trent Wind Farm |
---|---|
Utility Name | Trent Wind Farm LLC |
Location | Nolan County, TX |
Initial Operation Date | July 2001 |
Last Update | Dec 2023 |
Annual Generation | 535.5 GWh |
Annual Consumption | 2.0 M MMBtu |
Ranked #1,231 out of 11,949 Power Plants Nationwide | |
Ranked #324 out of 1,354 Wind Power Plants Nationwide | |
Ranked #231 out of 769 Texas Power Plants | |
Ranked #100 out of 219 Texas Wind Power Plants | |
Fuel Types | Wind |
Previous Operator |
Trent Wind Farm LP (2013 to 2022) Trent Wind Farm LLC (2023 to 2023) |
Map of Trent Wind Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Trent Wind Farm.
Monthly Net Generation for Trent Wind Farm
Trent Wind Farm Details
Summary Information | |
---|---|
Plant Name | Trent Wind Farm (55968) |
Plant Address | 1423 CR 131, Trent, TX 79561 |
Utility | Trent Wind Farm LLC (19171) |
Latitude, Longitude | 32.4301, -100.23565 |
Generation Dates on File | Jan 2002 to Dec 2023 |
Initial Operation Date | July 2001 |
Annual Generation | 535.5 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator WTG1 Details Operating July 2001
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 152 MW |
Summer Capacity | 152 MW |
Winter Capacity | 152 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | July 2001 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
---|---|
Energy Source | Wind |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 100 |
Time From Cold Shutdown To Full Load | 10M |
Other Planned Modifications | No |
Multiple Fuels | No |
Cofire Fuels | No |
Turbine Details | |
Number Of Turbines | 100 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 1.5 S |
Design Wind Speed | 18 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 213.3 |
Trent Wind Farm Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#314 | Green River Wind Farm | Deer Grove, IL | 545.2 GWh |
#315 | Wildcat Creek Wind Farm LLC | Gainesville, TX | 544.4 GWh |
#316 | Spinning Spur Wind II | Adrian, TX | 543.9 GWh |
#317 | Frontier Windpower | Newkirk, OK | 541.6 GWh |
#318 | Cimarron Bend III | Minneola, KS | 538.8 GWh |
#319 | Grant Wind, LLC | Medford, OK | 538.6 GWh |
#320 | Walnut Wind Farm | Walnut, IA | 538.1 GWh |
#321 | Kossuth | Lu Verne, IA | 536.8 GWh |
#322 | Grant Plains Wind, LLC | Medford, OK | 536.0 GWh |
#323 | Rock Falls Wind Farm LLC | Braman, OK | 535.9 GWh |
#325 | Cardinal Point Wind | Sciota, IL | 535.1 GWh |
#326 | Sherbino II | Ft. Stockton, TX | 533.6 GWh |
#327 | Ocotillo Express LLC | Ocotillo, CA | 533.4 GWh |
#328 | Hilltopper Wind Project | Mt. Pulaski, IL | 532.1 GWh |
#329 | Fluvanna | Fluvanna, TX | 531.8 GWh |
#330 | Intrepid | Schaller, IA | 531.4 GWh |
#331 | Rockhaven Wind Project, LLC | Hennepin, OK | 529.1 GWh |
#332 | Echo Wind Park | Elkton, MI | 528.9 GWh |
#333 | Scioto Ridge Wind Farm | Belle Center, OH | 528.0 GWh |
#334 | Cedar Springs III | Douglas, WY | 527.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Trent Wind Farm.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Buffalo Gap 2 Wind Farm | Merkel, TX | 393.2 GWh | 8.5 mi |
Buffalo Gap 3 Wind Farm | Nolan, TX | 292.1 GWh | 12.6 mi |
Buffalo Gap Wind Farm | Merkel, TX | 198.5 GWh | 13 mi |
Callahan Divide Wind Energy Center | Tusocola, TX | 394.7 GWh | 15.2 mi |
Champion Wind Farm LLC | Roscoe, TX | 306.8 GWh | 24.2 mi |
HEB00070 | Abilene, TX | 385.0 MWh | 27.8 mi |
Holstein 1 Solar Farm | Wingate, TX | 382.1 GWh | 22.9 mi |
Horse Hollow Wind Energy Center | Wingate, TX | 2.5 TWh | 18.2 mi |
Inadale Wind Farm LLC Hybrid | Roscoe, TX | 427.2 GWh | 20.6 mi |
Maryneal Windpower | Maryneal, TX | 570.1 GWh | 21.9 mi |
Mesquite Star | Roscoe, TX | 1.2 TWh | 13 mi |
Pyron Wind Farm LLC Hybrid | Hermleigh, TX | 835.8 GWh | 27.7 mi |
Roscoe Wind Farm LLC | Roscoe, TX | 374.8 GWh | 25.3 mi |
South Trent Wind Farm | Sweetwater, TX | 264.8 GWh | 6.4 mi |
Sweetwater Wind 1 LLC | Sweetwater, TX | 137.6 GWh | 7.7 mi |
Sweetwater Wind 2 LLC | Sweetwater, TX | 429.5 GWh | 9.7 mi |
Sweetwater Wind 3 LLC | Sweetwater, TX | 425.5 GWh | 14.5 mi |
Sweetwater Wind 4 LLC | Roscoe, TX | 621.9 GWh | 19 mi |
Sweetwater Wind 5 | Roscoe, TX | 165.2 GWh | 19.7 mi |
Turkey Track Wind Energy LLC | Blackwell, TX | 345.7 GWh | 16.1 mi |