The Village at Orchard Ridge (TVOR)
400 Clocktower Ridge Drive, Winchester, VA 22603Plant Summary Information
The Village at Orchard Ridge (TVOR) is ranked #129 out of 138 solar farms in Virginia in terms of total annual net electricity generation.
The Village at Orchard Ridge (TVOR) generated 398.0 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | The Village at Orchard Ridge (TVOR) |
|---|---|
| Utility Name | Distributed Solar Development, LLC |
| Location | Frederick County, VA |
| Initial Operation Date | March 2023 |
| Last Update | Dec 2025 |
| Annual Generation | 2.2 GWh |
| Annual Consumption | 7.8 k MMBtu |
| Ranked #10,626 out of 13,081 Power Plants Nationwide | |
| Ranked #5,525 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #204 out of 243 Virginia Power Plants | |
| Ranked #129 out of 138 Virginia Solar Power Plants | |
| Fuel Types | Solar |
Map of The Village at Orchard Ridge (TVOR)
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for The Village at Orchard Ridge (TVOR).
Monthly Net Generation for The Village at Orchard Ridge (TVOR)
Monthly Plant Fuel Consumption for The Village at Orchard Ridge (TVOR)
The Village at Orchard Ridge (TVOR) Details
| Summary Information | |
|---|---|
| Plant Name | The Village at Orchard Ridge (TVOR) (67272) |
| Plant Address | 400 Clocktower Ridge Drive, Winchester, VA 22603 |
| Utility | Distributed Solar Development, LLC (64872) |
| Latitude, Longitude | 39.20156, -78.21391 |
| Generation Dates on File | Mar 2023 to Dec 2025 |
| Initial Operation Date | March 2023 |
| Annual Generation | 2.2 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 23-1-000; 23-1-001; 23-1-002 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | RFC |
| Balancing Authority | PJM Interconnection, LLC (PJM) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Shenandoah Valley Elec Coop (17066) VA |
| Grid Voltage | 0.50 kV |
| Energy Storage | No |
Generator P5412 Details Operating March 2023
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 1.4 MW |
| Summer Capacity | 1.4 MW |
| Winter Capacity | 1.4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | March 2023 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 20 |
| DC Net Capacity | 1.8 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | Yes |
| Net Metering DC Capacity | 1.8 MW |
| Virtual Net Metering Agreement | No |
The Village at Orchard Ridge (TVOR) Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #5515 | C&L | Star City, AR | 2.2 GWh |
| #5516 | USS Danube Solar LLC | Danube, MN | 2.2 GWh |
| #5517 | FreeState Kiro Solar I | Silver Lake, KS | 2.2 GWh |
| #5518 | Route 57 Solar | Agawam, MA | 2.2 GWh |
| #5519 | Rutgers Busch Liv (Lot 55, 58, 58A, 58B) | Piscataway, NJ | 2.2 GWh |
| #5520 | MN East Regal LLC (CSG) | Paynesville, MN | 2.2 GWh |
| #5521 | Pivot Energy PPA 22 | Visalia, CA | 2.2 GWh |
| #5522 | Bluefin Origination 1 | Brandywine, MD | 2.2 GWh |
| #5523 | St. Paul-Howard Greeley | St. Paul, NE | 2.2 GWh |
| #5524 | South Garden | Winstead, MN | 2.2 GWh |
| #5526 | Tippecanoe Solar Power Plant | West Lafayette, IN | 2.2 GWh |
| #5527 | Rio Rancho High School | Rio Rancho, NM | 2.2 GWh |
| #5528 | Billings Road | Hardwick, VT | 2.2 GWh |
| #5529 | 180 Raritan Solar | Edison, NJ | 2.2 GWh |
| #5530 | Sterling PV 3 | Sterling, CO | 2.2 GWh |
| #5531 | Clay County Electrical Cooperative | Corning, AR | 2.2 GWh |
| #5532 | Springer Solar 1 | Springer, NM | 2.2 GWh |
| #5533 | Mira Loma | Mira Loma, CA | 2.2 GWh |
| #5534 | Legoland Solar | Winter Haven, FL | 2.2 GWh |
| #5535 | 301 Chestnut Solar NG | East Longmeadow, MA | 2.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding The Village at Orchard Ridge (TVOR).
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bartonsville Energy Facility, LLC | Stephens, VA | 249.2 GWh | 7.9 mi |
| Bear One | Hancock, MD | 3.9 GWh | 35.3 mi |
| Big Spring Solar (CSG) | Clear Spring, MD | 3.7 GWh | 33.8 mi |
| Blake Solar Plant | Charles Town, WV | 156.5 GWh | 20.8 mi |
| Capon Bridge Solar LLC | Augusta, WV | 34.0 GWh | 23.7 mi |
| Dam No. 4 Hydro Station | Shepherdstown, WV | 8.1 GWh | 28.9 mi |
| Dam No. 5 Hydro Station | Hedgesville, WV | 6.5 GWh | 31.9 mi |
| DG AMP Solar Front Royal | Front Royal, VA | 4.0 GWh | 18.9 mi |
| Foxglove Solar | Middletown, VA | 133.5 GWh | 9.5 mi |
| Frederick County LFGTE Facility | Winchester, VA | 12.2 GWh | 7.5 mi |
| Hecate Energy Clarke County LLC | White Post, VA | 15.6 GWh | 10.3 mi |
| HP Hood CT | Winchester, VA | 111.9 GWh | 5 mi |
| Marlowe Solar | Falling Waters, WV | 7.8 GWh | 33.6 mi |
| Millville Hydro Station | Millville, WV | 7.7 GWh | 23.5 mi |
| Pinesburg Solar LLC | Williamsport, MD | 2.6 GWh | 34.8 mi |
| Pittman Solar One LLC | Hancock, MD | 3.7 GWh | 34 mi |
| Rockdale | Williamsport, MD | 1.6 GWh | 34.6 mi |
| Spruce - WCMD - Rubble I | Williamsport, MD | 2.9 GWh | 35.6 mi |
| Spruce - WCMD - Rubble II | Williamsport, MD | 2.4 GWh | 35.7 mi |
| Warren County | Front Royal, VA | 8.4 TWh | 16 mi |