Toksook Bay
Nelson Island, PO Box 37008, Toksook Bay, AK 99637Plant Summary Information
Toksook Bay is ranked #26 out of 80 distillate fuel oil power plants in Alaska in terms of total annual net electricity generation.
Toksook Bay is comprised of 3 generators and generated 1.1 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Toksook Bay |
|---|---|
| Utility Name | Alaska Village Elec Coop, Inc |
| Location | Bethel Census Area, AK |
| Initial Operation Date | August 2005 |
| Last Update | Dec 2025 |
| Annual Generation | 3.8 GWh |
| Annual Consumption | 37.6 k MMBtu |
| Ranked #9,036 out of 13,081 Power Plants Nationwide | |
| Ranked #263 out of 1,233 Distillate Fuel Oil Power Plants Nationwide | |
| Ranked #75 out of 125 Alaska Power Plants | |
| Ranked #26 out of 80 Alaska Distillate Fuel Oil Power Plants | |
| Fuel Types | Distillate Fuel Oil |
Map of Toksook Bay
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Toksook Bay.
Monthly Net Generation for Toksook Bay
Monthly Plant Fuel Consumption for Toksook Bay
Toksook Bay Details
| Summary Information | |
|---|---|
| Plant Name | Toksook Bay (57067) |
| Plant Address | Nelson Island, PO Box 37008, Toksook Bay, AK 99637 |
| Utility | Alaska Village Elec Coop, Inc (221) |
| Latitude, Longitude | 60.53014, -165.10858 |
| Generation Dates on File | Jan 2009 to Dec 2025 |
| Initial Operation Date | August 2005 |
| Annual Generation | 3.8 GWh |
| Fuel Types | Distillate Fuel Oil |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | |
| Balancing Authority | () |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Alaska Village Elec Coop, Inc (221) AK |
| Grid Voltage | 13.47 kV |
| Energy Storage | No |
Generator UNIT2 Details Operating August 2005
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.5 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 0.5 MW |
| Winter Capacity | 0.5 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | August 2005 |
|---|---|
| Combined Heat & Power | Yes |
| Sector Name | Electric Utility (1) |
| Topping Or Bottoming | T |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Other Planned Modifications | No |
| Multiple Fuels | No |
Generator UNIT3 Details Operating August 2005
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.8 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 0.8 MW |
| Winter Capacity | 0.8 MW |
| Minimum Load | 0.2 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | August 2005 |
|---|---|
| Combined Heat & Power | Yes |
| Sector Name | Electric Utility (1) |
| Topping Or Bottoming | T |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Other Planned Modifications | No |
| Multiple Fuels | No |
Generator 1A Details Operating October 2019
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 0.8 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 0.8 MW |
| Winter Capacity | 0.8 MW |
| Minimum Load | 0.2 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | October 2019 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Other Planned Modifications | No |
| Multiple Fuels | No |
Toksook Bay Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Distillate Fuel Oil.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #253 | Pittsfield Generating LP | Pittsfield, MA | 136.2 GWh |
| #254 | Hugo | Fort Towson, OK | 1.3 TWh |
| #255 | NSB Anaktuvuk Pass | Anaktuvuk Pass, AK | 4.1 GWh |
| #256 | Robins | Robins AFB, GA | 4.6 GWh |
| #257 | Domtar Paper Co LLC Plymouth NC | Plymouth, NC | 345.8 GWh |
| #258 | NSB Nuiqsut Utility | Nuiqsut, AK | 7.5 GWh |
| #259 | McClellan (AR) | Camden, AR | 26.7 GWh |
| #260 | Bergen Generating Station | Ridgefield, NJ | 3.3 TWh |
| #261 | NSB Point Lay Utility | PT Lay, AK | 3.9 GWh |
| #262 | Bayview | Bayview, VA | 3.8 GWh |
| #264 | Sioux | West Alton, MO | 3.8 TWh |
| #265 | Wilkes | Avinger, TX | 1.2 TWh |
| #266 | Unalakleet | Unalakleet, AK | 3.7 GWh |
| #267 | Flint Creek | Gentry, AR | 2.8 TWh |
| #268 | Stebbins | Stebbins, AK | 3.6 GWh |
| #269 | NCSU Cates Cogeneration Plant | Raleigh, NC | 72.6 GWh |
| #270 | Cooper | Somerset, KY | 619.6 GWh |
| #271 | Sand Point | Sand Point, AK | 3.6 GWh |
| #272 | St Clair | East China Twp, MI | 7.0 GWh |
| #273 | Zion Energy Center | Zion, IL | 468.2 GWh |
Nearby Power Plants
Below are closest 4 power plants surrounding Toksook Bay.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Chevak | Chevak, AK | 2.6 GWh | 70.6 mi |
| Hooper Bay | Hooper Bay, AK | 3.6 GWh | 76.7 mi |
| Scammon Bay | Scammon Bay, AK | 1.8 GWh | 92.1 mi |
| St Marys IC | St. Mary's, AK | 5.6 GWh | 123.2 mi |