Tippecanoe Solar Power Plant
555 Airport Rd, West Lafayette, IN 47906Plant Summary Information
Tippecanoe Solar Power Plant is ranked #94 out of 125 solar farms in Indiana in terms of total annual net electricity generation.
Tippecanoe Solar Power Plant generated 501.0 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Tippecanoe Solar Power Plant |
|---|---|
| Utility Name | Duke Energy Indiana, LLC |
| Location | Tippecanoe County, IN |
| Initial Operation Date | December 2019 |
| Last Update | Dec 2025 |
| Annual Generation | 2.2 GWh |
| Annual Consumption | 7.4 k MMBtu |
| Ranked #10,627 out of 13,081 Power Plants Nationwide | |
| Ranked #5,526 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #182 out of 218 Indiana Power Plants | |
| Ranked #94 out of 125 Indiana Solar Power Plants | |
| Fuel Types | Solar |
Map of Tippecanoe Solar Power Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Tippecanoe Solar Power Plant.
Monthly Net Generation for Tippecanoe Solar Power Plant
Monthly Plant Fuel Consumption for Tippecanoe Solar Power Plant
Tippecanoe Solar Power Plant Details
| Summary Information | |
|---|---|
| Plant Name | Tippecanoe Solar Power Plant (63137) |
| Plant Address | 555 Airport Rd, West Lafayette, IN 47906 |
| Utility | Duke Energy Indiana, LLC (15470) |
| Latitude, Longitude | 40.42114, -86.94016 |
| Generation Dates on File | Jan 2020 to Dec 2025 |
| Initial Operation Date | December 2019 |
| Annual Generation | 2.2 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | RFC |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Duke Energy Indiana, LLC (15470) IN |
| Grid Voltage | 12.47 kV |
| Energy Storage | No |
Generator PV1 Details Operating December 2019
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 1.6 MW |
| Summer Capacity | 1.6 MW |
| Winter Capacity | 1.6 MW |
| Minimum Load | 1.6 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2019 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Solar |
| Time From Cold Shutdown To Full Load | 1H |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 30 |
| DC Net Capacity | 2.4 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Tippecanoe Solar Power Plant Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #5516 | USS Danube Solar LLC | Danube, MN | 2.2 GWh |
| #5517 | FreeState Kiro Solar I | Silver Lake, KS | 2.2 GWh |
| #5518 | Route 57 Solar | Agawam, MA | 2.2 GWh |
| #5519 | Rutgers Busch Liv (Lot 55, 58, 58A, 58B) | Piscataway, NJ | 2.2 GWh |
| #5520 | MN East Regal LLC (CSG) | Paynesville, MN | 2.2 GWh |
| #5521 | Pivot Energy PPA 22 | Visalia, CA | 2.2 GWh |
| #5522 | Bluefin Origination 1 | Brandywine, MD | 2.2 GWh |
| #5523 | St. Paul-Howard Greeley | St. Paul, NE | 2.2 GWh |
| #5524 | South Garden | Winstead, MN | 2.2 GWh |
| #5525 | The Village at Orchard Ridge (TVOR) | Winchester, VA | 2.2 GWh |
| #5527 | Rio Rancho High School | Rio Rancho, NM | 2.2 GWh |
| #5528 | Billings Road | Hardwick, VT | 2.2 GWh |
| #5529 | 180 Raritan Solar | Edison, NJ | 2.2 GWh |
| #5530 | Sterling PV 3 | Sterling, CO | 2.2 GWh |
| #5531 | Clay County Electrical Cooperative | Corning, AR | 2.2 GWh |
| #5532 | Springer Solar 1 | Springer, NM | 2.2 GWh |
| #5533 | Mira Loma | Mira Loma, CA | 2.2 GWh |
| #5534 | Legoland Solar | Winter Haven, FL | 2.2 GWh |
| #5535 | 301 Chestnut Solar NG | East Longmeadow, MA | 2.2 GWh |
| #5536 | T0588 Phoenix - AZ | Phoenix, AZ | 2.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Tippecanoe Solar Power Plant.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| BioTown Ag | Reynolds, IN | 33.3 GWh | 24 mi |
| Caterpillar | Lafayette, IN | 19.2 GWh | 5 mi |
| Crawfordsville 3 Solar Park | Crawfordsville, IN | 7.9 GWh | 23.8 mi |
| Evonik Industries AG | Lafayette, IN | 7.0 MWh | 2.3 mi |
| Fowler Ridge Wind Farm LLC | Fowler, IN | 1.5 TWh | 23.5 mi |
| Hardy Hills Solar Energy LLC | Frankfort, IN | 359.5 GWh | 23.7 mi |
| Indiana Crossroads Solar Park | Reynolds, IN | 384.4 GWh | 21.6 mi |
| Indiana Crossroads Wind Farm LLC | Chalmers, IN | 903.2 GWh | 17.1 mi |
| Meadow Lake Wind Farm II LLC | Lafayette, IN | 237.7 GWh | 16 mi |
| Meadow Lake Wind Farm III LLC | Lafayette, IN | 257.8 GWh | 12.9 mi |
| Meadow Lake Wind Farm IV | Lafayette, IN | 103.5 GWh | 18.4 mi |
| Meadow Lake Wind Farm LLC | Lafayette, IN | 431.7 GWh | 14.3 mi |
| Meadow Lake Wind Farm V LLC | Chalmers, IN | 346.2 GWh | 20.8 mi |
| Meadow Lake Wind Farm VI LLC | Remington, IN | 653.8 GWh | 21.2 mi |
| Oakdale | Monticello, IN | 15.0 GWh | 19 mi |
| Primient | Lafayette, IN | 408.0 GWh | 5.9 mi |
| Purdue CHP | West Lafayette, IN | 124.7 GWh | 1.3 mi |
| Purdue University | West Lafayette, IN | 115.2 GWh | 1.5 mi |
| Sagamore Plant Cogeneration | Lafayette, IN | 19.8 GWh | 4.5 mi |
| Twin Lakes Solar LLC | Monticello, IN | 331.7 GWh | 22.1 mi |