Tech Park Solar
8410C South Rita Road, Tucson, AZ 85747Plant Summary Information
Tech Park Solar is ranked #74 out of 113 solar farms in Arizona in terms of total annual net electricity generation.
Tech Park Solar generated 2.2 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Tech Park Solar |
|---|---|
| Utility Name | Big Sky Wind, LLC |
| Location | Pima County, AZ |
| Initial Operation Date | December 2012 |
| Last Update | Dec 2024 |
| Annual Generation | 11.8 GWh |
| Annual Consumption | 42.6 k MMBtu |
| Ranked #5,885 out of 12,332 Power Plants Nationwide | |
| Ranked #1,729 out of 6,397 Solar Power Plants Nationwide | |
| Ranked #123 out of 166 Arizona Power Plants | |
| Ranked #74 out of 113 Arizona Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operators |
Tech Park Solar, LLC (2014 to 2021) RWE Renewables Americas, LLC (2022 to 2023) Big Sky Wind, LLC (2024 to 2024) |
Map of Tech Park Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Tech Park Solar.
Monthly Net Generation for Tech Park Solar
Monthly Plant Fuel Consumption for Tech Park Solar
Tech Park Solar Details
| Summary Information | |
|---|---|
| Plant Name | Tech Park Solar (59455) |
| Plant Address | 8410C South Rita Road, Tucson, AZ 85747 |
| Utility | Big Sky Wind, LLC (56215) |
| Latitude, Longitude | 32.09788, -110.8157 |
| Generation Dates on File | Jan 2014 to Dec 2024 |
| Initial Operation Date | December 2012 |
| Annual Generation | 11.8 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | QF13-540 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Tucson Electric Power Company (TEPC) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Tucson Electric Power Co (24211) AZ |
| Grid Voltage | 13.70 kV |
| Energy Storage | No |
Generator TECHP Details Operating December 2012
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 5 MW |
| Summer Capacity | 5 MW |
| Winter Capacity | 5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 2012 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| DC Net Capacity | 6.6 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | Yes |
| Net Metering DC Capacity | 6.6 MW |
| Virtual Net Metering Agreement | No |
Tech Park Solar Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1719 | Capon Bridge Solar LLC | Augusta, WV | 12.0 GWh |
| #1720 | Wonderful Orchards - Belridge | Lost Hills, CA | 11.9 GWh |
| #1721 | Montpelier Solar Project | Montpelier, OH | 11.9 GWh |
| #1722 | Wheeler Ridge | Bakersfield, CA | 11.9 GWh |
| #1723 | Denmark Solar | Denmark, SC | 11.9 GWh |
| #1724 | Exelon Solar Chicago | Chicago, IL | 11.8 GWh |
| #1725 | Parkland Landfill Solar | Bordentown, NJ | 11.8 GWh |
| #1726 | Volkswagen Solar System | Chattanooga, TN | 11.8 GWh |
| #1727 | Jacksonville Solar | Jacksonville, FL | 11.8 GWh |
| #1728 | Springfield Solar Project | Springfield Twp., NJ | 11.8 GWh |
| #1730 | Raritan Solar - 53 Highway | Raritan Township, NJ | 11.8 GWh |
| #1731 | Chisago Solar | North Branch, MN | 11.8 GWh |
| #1732 | Kinsley Landfill Solar | Sewell, NJ | 11.7 GWh |
| #1733 | Franklin County Solar | Hampton, IA | 11.7 GWh |
| #1734 | Woodleaf Solar Facility | Salisbury, NC | 11.7 GWh |
| #1735 | Bartow Solar Energy LLC | Bartow, FL | 11.7 GWh |
| #1736 | Odyssey Solar | Pelion, SC | 11.6 GWh |
| #1737 | TPE Irish Road Solar, LLC | Chatham, VA | 11.6 GWh |
| #1738 | RE McKenzie 1 LLC | Galt, CA | 11.6 GWh |
| #1739 | RE McKenzie 2 LLC | Galt, CA | 11.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Tech Park Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Actus Lend Lease DMAFB | Tucson, AZ | 2.5 GWh | 6.5 mi |
| Amazon TUS2 | Tucson, AZ | 5.5 GWh | 2.6 mi |
| Amphitheater High School Solar | Tucson, AZ | 1.8 GWh | 15.1 mi |
| Avalon Solar | Pima, AZ | 64.6 GWh | 10.8 mi |
| Avalon Solar II | Sahuarita, AZ | 43.8 GWh | 10.7 mi |
| Cogeneration 1 | Tucson, AZ | 49.3 GWh | 12.1 mi |
| Cogeneration 2 | Tucson, AZ | 39.3 GWh | 12.6 mi |
| Cogenra - TEP | Tucson, AZ | 1.9 GWh | 0.3 mi |
| Davis Monthan AFB (AZ) West Airfield | Tucson, AZ | 30.2 GWh | 7.2 mi |
| Demoss Petrie | Tucson, AZ | 2.5 GWh | 14.8 mi |
| Gato Montes Solar, LLC | Tucson, AZ | 7.4 GWh | 0.4 mi |
| H Wilson Sundt Generating Station | Tucson, AZ | 1.9 TWh | 6.7 mi |
| Iron Horse Battery Storage Hybrid | Tucson, AZ | 4.7 GWh | 0.2 mi |
| Pima Community College - East Campus | Tucson, AZ | 2.8 GWh | 10.8 mi |
| Prairie Fire | Tucson, AZ | 7.8 GWh | 1.3 mi |
| Raptor Ridge | Tucson, AZ | 33.8 GWh | 5 mi |
| TJX Tucson | Tucson, AZ | 2.2 GWh | 6 mi |
| UASTP I | Tucson, AZ | 1.6 GWh | 0.3 mi |
| Valencia Solar | Tucson, AZ | 24.6 GWh | 4.5 mi |
| Wilmot Energy Center LLC | Tucson, AZ | 272.8 GWh | 5.9 mi |