Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Oberlin (OH) | City of Oberlin - (OH) | Oberlin, OH | PJM Interconnection, LLC (PJM) | 593.0 MWh | Dec 1947 | Dec 2025 | Natural Gas : 87.7% Distillate Fuel Oil : 12.3% |
| Ogden | City of Ogden - (IA) | Ogden, IA | Midcontinent Independent System Operator, Inc. (MISO) | 73.0 MWh | Jun 1951 | Dec 2025 | Distillate Fuel Oil |
| Papillion Creek Wastewater | City of Omaha - (NE) | Bellevue, NE | Southwest Power Pool (SWPP) | 3.1 GWh | Apr 1987 | May 2026 | Natural Gas : 71.1% Other Biomass Gas : 28.9% |
| Missouri River Wastewater Treatment | City of Omaha - (NE) | Omaha, NE | Southwest Power Pool (SWPP) | 10.2 GWh | Mar 1985 | May 2026 | Other Biomass Gas : 99.8% |
| North Road Peak | City of Orangeburg - (SC) | Oangeburg, SC | Duke Energy Carolinas (DUK) | 2.1 GWh | Mar 1987 | Dec 2025 | Distillate Fuel Oil |
| Rowesville Rd Plant | City of Orangeburg - (SC) | Orangeburg, SC | Duke Energy Carolinas (DUK) | 928.0 MWh | May 1994 | Dec 2025 | Natural Gas |
| Bull Street Plant | City of Orangeburg - (SC) | Orangeburg, SC | Duke Energy Carolinas (DUK) | 132.0 MWh | Mar 2005 | Dec 2025 | Natural Gas |
| Substation 20 Plant | City of Orangeburg - (SC) | Orangeburg, SC | Duke Energy Carolinas (DUK) | 168.0 MWh | May 2014 | Dec 2025 | Natural Gas |
| Ord | City of Ord - (NE) | Ord, NE | Southwest Power Pool (SWPP) | 119.0 MWh | Dec 1962 | Dec 2025 | Distillate Fuel Oil : 99.4% Natural Gas : 0.6% |
| Orrville | City of Orrville - (OH) | Orrville, OH | PJM Interconnection, LLC (PJM) | 29.3 GWh | Dec 1948 | Dec 2025 | Bituminous Coal : 54.3% Natural Gas : 45.7% |
| Osage (IA) | City of Osage - (IA) | Osage, IA | Midcontinent Independent System Operator, Inc. (MISO) | 5.5 GWh | Aug 1963 | Dec 2025 | Wind : 81.8% Solar : 18.2% |
| Osawatomie Power Plant North Sub | City of Osawatomie - (KS) | Osawatomie, KS | Southwest Power Pool (SWPP) | 3.0 MWh | Apr 2018 | Dec 2025 | Distillate Fuel Oil |
| Osawatomie Power Plant South Sub | City of Osawatomie - (KS) | Osawatomie, KS | Southwest Power Pool (SWPP) | 3.0 MWh | Feb 2017 | Dec 2025 | Distillate Fuel Oil |
| Osborne | City of Osborne - (KS) | Osborne, KS | Southwest Power Pool (SWPP) | 30.4 MWh | May 1957 | Dec 2025 | Distillate Fuel Oil : 61.7% Natural Gas : 38.3% |
| Ottumwa City of | City of Ottumwa - (IA) | Ottumwa, IA | Midcontinent Independent System Operator, Inc. (MISO) | 2.9 GWh | Jul 1931 | Dec 2025 | Water |
| Owatonna | City of Owatonna - (MN) | Owatonna, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.4 GWh | Mar 1982 | Dec 2025 | Natural Gas |
| Oxford (KS) | City of Oxford - (KS) | Oxford, KS | Southwest Power Pool (SWPP) | 4.0 MWh | Jun 1999 | Dec 2025 | Distillate Fuel Oil |
| Oxnard Wastewater Treatment Plant | City of Oxnard - (CA) | Oxnard, CA | California Independent System Operator (CISO) | 3.0 GWh | Jul 1981 | May 2026 | Other Biomass Gas : 97.6% Natural Gas : 2.4% |
| Painesville | City of Painesville - (OH) | Painesville, OH | PJM Interconnection, LLC (PJM) | 1.2 GWh | Dec 1948 | Dec 2025 | Bituminous Coal : 70.1% Natural Gas : 22.3% Distillate Fuel Oil : 7.6% |
| Panora | City of Panora - (IA) | Panora, IA | Midcontinent Independent System Operator, Inc. (MISO) | 8.0 MWh | Dec 1987 | Dec 2025 | Distillate Fuel Oil |
| Paris (KY) | City of Paris - (KY) | Paris, KY | Louisville Gas and Electric Company and Kentucky Utilities Company (LGEE) | 370.4 MWh | Nov 1934 | Dec 2025 | Distillate Fuel Oil |
| Glenarm | City of Pasadena - (CA) | Pasadena, CA | California Independent System Operator (CISO) | 129.8 GWh | Dec 1975 | Dec 2025 | Natural Gas |
| Pawhuska | City of Pawhuska - (OK) | Pawhuska, OK | Southwest Power Pool (SWPP) | 88.0 MWh | Aug 1949 | Dec 2025 | Distillate Fuel Oil |
| Waters River | City of Peabody - (MA) | Peabody, MA | ISO New England (ISNE) | 5.5 GWh | Nov 1971 | Dec 2025 | Natural Gas : 71.3% Distillate Fuel Oil : 28.7% |
| Pella Peaking | City of Pella - (IA) | Pella, IA | Midcontinent Independent System Operator, Inc. (MISO) | 752.0 MWh | May 2003 | Dec 2025 | Distillate Fuel Oil |
| Pender | City of Pender - (NE) | Pender, NE | Southwest Power Pool (SWPP) | 152.0 MWh | Dec 1952 | Dec 2025 | Distillate Fuel Oil |
| City of Peru Plank Road Generating Station | City of Peru - (IL) | Peru, IL | Midcontinent Independent System Operator, Inc. (MISO) | 20.6 GWh | Sep 1968 | May 2026 | Water : 97.9% Distillate Fuel Oil : 1.8% |
| City of Peru Hydro-Electric Generating S | City of Peru - (IL) | Utica, IL | Midcontinent Independent System Operator, Inc. (MISO) | 17.2 GWh | Aug 1996 | Dec 2025 | Water |
| City of Peru Rail Generating Station | City of Peru - (IL) | Peru, IL | Midcontinent Independent System Operator, Inc. (MISO) | 53.0 MWh | Aug 2011 | Dec 2025 | Distillate Fuel Oil |
| City of Peru Water Street Generating Sta | City of Peru - (IL) | Peru, IL | Midcontinent Independent System Operator, Inc. (MISO) | 33.0 MWh | Sep 1968 | Dec 2025 | Jet Fuel |
| Peru (IN) | City of Peru - (IN) | Peru, IN | Midcontinent Independent System Operator, Inc. (MISO) | 6.0 MWh | May 1949 | Dec 2024 | Distillate Fuel Oil |
| Piqua Power Plant | City of Piqua - (OH) | Piqua, OH | PJM Interconnection, LLC (PJM) | 529.0 MWh | Dec 1971 | Dec 2025 | Distillate Fuel Oil |
| West Diesel Generation Unit | City of Pocahontas - (IA) | Pocahontas, IA | Midcontinent Independent System Operator, Inc. (MISO) | 4.0 MWh | May 2006 | Dec 2025 | Distillate Fuel Oil |
| Poplar Bluff Generating Station | City of Poplar Bluff - (MO) | Poplar Bluff, MO | Southwest Power Pool (SWPP) | 679.0 MWh | Apr 1976 | Dec 2025 | Natural Gas : 92.4% Distillate Fuel Oil : 7.6% |
| Frank Jenkins | City of Portland - (MI) | Portland, MI | Midcontinent Independent System Operator, Inc. (MISO) | 195.0 MWh | Apr 1950 | Dec 2025 | Distillate Fuel Oil : 81.7% Natural Gas : 18.3% |
| PHP 1 | City of Portland (OR) | Sandy, OR | Portland General Electric Company (PGE) | 37.6 GWh | Jan 1982 | Dec 2025 | Water |
| PHP 2 | City of Portland (OR) | Sandy, OR | Portland General Electric Company (PGE) | 25.8 GWh | Jan 1982 | Dec 2025 | Water |
| Pratt | City of Pratt- (KS) | Pratt, KS | Southwest Power Pool (SWPP) | 348.0 MWh | Dec 1957 | Dec 2025 | Natural Gas : 99.1% Distillate Fuel Oil : 0.9% |
| Pratt 2 | City of Pratt- (KS) | Pratt, KS | Southwest Power Pool (SWPP) | 195.0 MWh | May 1994 | Dec 2025 | Natural Gas : 75.1% Distillate Fuel Oil : 24.9% |
| Preston (IA) | City of Preston - (IA) | Preston, IA | Midcontinent Independent System Operator, Inc. (MISO) | 9.0 MWh | Nov 1968 | Dec 2025 | Natural Gas : 85.1% Distillate Fuel Oil : 14.9% |
| Princeton (IL) | City of Princeton - (IL) | Princeton, IL | Midcontinent Independent System Operator, Inc. (MISO) | 813.0 MWh | Jun 1953 | Dec 2025 | Natural Gas : 99.8% |
| Radford | City of Radford - (VA) | Radford, VA | PJM Interconnection, LLC (PJM) | 5.0 GWh | Sep 1934 | Dec 2025 | Water |
| Red Bud | City of Red Bud - (IL) | Red Bud, IL | Midcontinent Independent System Operator, Inc. (MISO) | 262.0 MWh | Feb 1959 | Dec 2025 | Distillate Fuel Oil |
| Red Cloud | City of Red Cloud - (NE) | Red Cloud, NE | Southwest Power Pool (SWPP) | 37.0 MWh | Dec 1949 | Dec 2025 | Distillate Fuel Oil |
| Whiskeytown | City of Redding - (CA) | Whiskeytown, CA | Balancing Authority of Northern California (BANC) | 10.5 GWh | Aug 1986 | Dec 2025 | Water |
| Redding Power | City of Redding - (CA) | Redding, CA | Balancing Authority of Northern California (BANC) | 161.8 GWh | Dec 1988 | May 2026 | Natural Gas |
| Whitewater Valley | City of Richmond - (IN) | RICHMOND, IN | PJM Interconnection, LLC (PJM) | 52.6 GWh | Feb 1955 | Dec 2025 | Bituminous Coal : 98.8% Distillate Fuel Oil : 1.2% |
| Riverside Energy Resource Center | City of Riverside - (CA) | Riverside, CA | California Independent System Operator (CISO) | 16.8 GWh | May 2006 | Dec 2025 | Natural Gas |
| Springs Generating Station | City of Riverside - (CA) | Riverside, CA | California Independent System Operator (CISO) | 878.0 MWh | Jun 2002 | Dec 2025 | Natural Gas |
| Clearwater Power Plant | City of Riverside - (CA) | Corona, CA | California Independent System Operator (CISO) | 3.5 GWh | Feb 2005 | Dec 2025 | Natural Gas |
| Water Reclamation Plant | City of Rochester - (MN) | Rochester, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 GWh | Feb 2003 | Dec 2025 | Other Biomass Gas : 99.8% |
| Upper Sterling | City of Rock Falls - (IL) | Rock Falls, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.8 GWh | May 1988 | May 2025 | Water |
| Avenue A Generator Sets | City of Rock Falls - (IL) | Rock Falls, IL | Midcontinent Independent System Operator, Inc. (MISO) | 224.0 MWh | Aug 2000 | Dec 2025 | Distillate Fuel Oil |
| Industrial Park | City of Rock Falls - (IL) | Rock Falls, IL | Midcontinent Independent System Operator, Inc. (MISO) | 838.0 MWh | Jun 2001 | Dec 2025 | Distillate Fuel Oil |
| Rockford | City of Rockford- (IA) | Rockford, IA | Midcontinent Independent System Operator, Inc. (MISO) | 6.0 MWh | Jul 1951 | Dec 2025 | Distillate Fuel Oil |
| Roseville Power Plant #2 | City of Roseville - (CA) | Rocklin, CA | Balancing Authority of Northern California (BANC) | 569.0 MWh | Mar 1986 | Dec 2025 | Natural Gas : 99.9% |
| Roseville Energy Park | City of Roseville - (CA) | Roseville, CA | Balancing Authority of Northern California (BANC) | 320.4 GWh | Oct 2007 | May 2026 | Natural Gas |
| Russell Downtown | City of Russell - (KS) | Russell, KS | Southwest Power Pool (SWPP) | 33.0 MWh | Jan 1971 | Dec 2025 | Natural Gas : 68.5% Distillate Fuel Oil : 31.5% |
| Russell Energy Center | City of Russell - (KS) | Russell, KS | Southwest Power Pool (SWPP) | 385.0 MWh | Jan 2002 | Dec 2025 | Natural Gas |
| Salem Street Dept | City of Salem - (VA) | Salem, VA | PJM Interconnection, LLC (PJM) | 94.0 MWh | Jun 2005 | May 2026 | Distillate Fuel Oil |
| Salem Water Plant | City of Salem - (VA) | Salem, VA | PJM Interconnection, LLC (PJM) | 96.0 MWh | Jul 2003 | May 2026 | Distillate Fuel Oil |
| Salem Electric Department | City of Salem - (VA) | Salem, VA | PJM Interconnection, LLC (PJM) | 79.0 MWh | Nov 2007 | Dec 2025 | Distillate Fuel Oil |
| WLWPCF Cogeneration Facility | City of Salem Public Works - (OR) | Keizer, OR | Portland General Electric Company (PGE) | 5.9 GWh | May 2020 | Dec 2025 | Other Biomass Gas |
| Rio Nogales Power Project | City of San Antonio - (TX) | Seguin, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 4.6 TWh | Apr 2002 | May 2026 | Natural Gas |
| CPS 1 Community Solar | City of San Antonio - (TX) | Adkins, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 1.7 GWh | Jul 2016 | Dec 2025 | Solar |
| Arthur Von Rosenberg | City of San Antonio - (TX) | Elmendorf, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 3.4 TWh | May 2000 | May 2026 | Natural Gas |
| HO Clarke Generating | City of San Antonio - (TX) | Houston, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 340.3 GWh | Feb 2021 | May 2026 | Natural Gas |
| Topaz Generating | City of San Antonio - (TX) | Texas City, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 547.7 GWh | Jun 2021 | May 2026 | Natural Gas |
| Commerce Solar | City of San Antonio - (TX) | San Antonio, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 9.3 GWh | Nov 2019 | Dec 2025 | Solar |
| Mark One Power Station | City of San Antonio - (TX) | Angleton, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 408.2 GWh | Oct 2022 | May 2026 | Natural Gas |
| O W Sommers | City of San Antonio - (TX) | San Antonio, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 2.3 TWh | Mar 1972 | Dec 2025 | Natural Gas |
| J K Spruce | City of San Antonio - (TX) | San Antonio, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 6.2 TWh | Nov 1992 | May 2026 | Subbituminous Coal : 99.1% Natural Gas : 0.9% |
| Laredo | City of San Antonio - (TX) | Laredo, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 24.1 GWh | Jul 2008 | Dec 2025 | Natural Gas |
| Nueces Bay | City of San Antonio - (TX) | Corpus Christi, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 1.8 TWh | Jun 1972 | May 2026 | Natural Gas |
| Leon Creek | City of San Antonio - (TX) | San Antonio, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 385.7 GWh | May 2004 | Dec 2025 | Natural Gas |
| V H Braunig | City of San Antonio - (TX) | Elmendorf, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 281.9 GWh | Feb 1966 | May 2026 | Natural Gas : 99.3% Distillate Fuel Oil : 0.7% |
| Barney M Davis | City of San Antonio - (TX) | Corpus Christi, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 1.6 TWh | Apr 1974 | May 2026 | Natural Gas |
| Remy Jade Power Station | City of San Antonio - (TX) | Crosby, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 433.6 GWh | May 2024 | May 2026 | Natural Gas |
| Gas Utilization Facility | City of San Diego - (CA) | San Diego, CA | California Independent System Operator (CISO) | 28.7 GWh | May 1985 | May 2026 | Other Biomass Gas |
| Grizzly | City of Santa Clara - (CA) | N/A, CA | California Independent System Operator (CISO) | 43.3 GWh | Oct 1993 | Dec 2025 | Water |
| Donald Von Raesfeld Power Plant | City of Santa Clara - (CA) | Santa Clara, CA | California Independent System Operator (CISO) | 873.5 GWh | Feb 2005 | May 2026 | Natural Gas |
| Stony Gorge | City of Santa Clara - (CA) | Elk Creek, CA | California Independent System Operator (CISO) | 8.9 GWh | Mar 1986 | Dec 2025 | Water |
| Black Butte | City of Santa Clara - (CA) | Orland, CA | California Independent System Operator (CISO) | 9.0 GWh | Aug 1988 | Dec 2025 | Water |
| Gianera | City of Santa Clara - (CA) | Santa Clara, CA | California Independent System Operator (CISO) | 15.1 GWh | May 1986 | Dec 2025 | Natural Gas |
| Laguna Water Reclamation Facility | City of Santa Rosa - (CA) | Santa Rosa, CA | California Independent System Operator (CISO) | 9.4 GWh | Feb 2013 | Dec 2025 | Other Biomass Gas : 83.6% Natural Gas : 16.4% |
| Sargent | City of Sargent - (NE) | Sargent, NE | Southwest Power Pool (SWPP) | 12.0 MWh | Dec 1953 | Dec 2025 | Distillate Fuel Oil |
| Scribner Diesel Generation Facility | City of Scribner (NE) | Scribner, NE | Southwest Power Pool (SWPP) | 68.0 MWh | Aug 2020 | Dec 2025 | Other Biomass Liquids : 95.2% Distillate Fuel Oil : 4.8% |
| South Fork Tolt | City of Seattle - (WA) | North Bend, WA | Seattle City Light (SCL) | 48.6 GWh | Oct 1995 | Dec 2025 | Water |
| Ross | City of Seattle - (WA) | Rockport, WA | Seattle City Light (SCL) | 714.9 GWh | Nov 1952 | May 2026 | Water |
| Cedar Falls (WA) | City of Seattle - (WA) | North Bend, WA | Seattle City Light (SCL) | 53.6 GWh | Oct 1921 | Dec 2025 | Water |
| Gorge | City of Seattle - (WA) | Rockport, WA | Seattle City Light (SCL) | 912.4 GWh | Aug 1924 | May 2026 | Water |
| Diablo | City of Seattle - (WA) | Rockport, WA | Seattle City Light (SCL) | 518.2 GWh | Sep 1936 | Dec 2025 | Water |
| Boundary | City of Seattle - (WA) | Metaline, WA | Seattle City Light (SCL) | 3.8 TWh | Jul 1967 | May 2026 | Water |
| Seneca City of | City of Seneca - (SC) | Seneca, SC | Duke Energy Carolinas (DUK) | 728.0 MWh | Nov 2004 | Dec 2025 | Distillate Fuel Oil |
| Seward (AK) | City of Seward - (AK) | Seward, AK | 671.0 MWh | Mar 1975 | Dec 2025 | Distillate Fuel Oil | |
| Sharon Spring | City of Sharon Springs - (KS) | Sharon Springs, KS | Southwest Power Pool (SWPP) | 30.4 MWh | Jul 1951 | Dec 2025 | Natural Gas : 96.4% Distillate Fuel Oil : 3.6% |
| Shelbina Power #1 | City of Shelbina - (MO) | Shelbina, MO | Associated Electric Cooperative, Inc. (AECI) | 8.0 MWh | Dec 1980 | Dec 2025 | Distillate Fuel Oil |
| Shelbina Power #2 | City of Shelbina - (MO) | Shelbina, MO | Associated Electric Cooperative, Inc. (AECI) | 43.0 MWh | Mar 1992 | Dec 2025 | Distillate Fuel Oil |
| Shelbina Power #3 | City of Shelbina - (MO) | Shelbina, MO | Associated Electric Cooperative, Inc. (AECI) | 16.0 MWh | Mar 2002 | Dec 2025 | Distillate Fuel Oil |
| Shelby South | City of Shelby - (OH) | Shelby, OH | PJM Interconnection, LLC (PJM) | 111.0 MWh | May 2000 | Dec 2025 | Distillate Fuel Oil |
Summary of Power Plants By State
Figures are based on May 2026 generation numbers.| State | Rank | Active Plants | May 2026 Generation |
|---|---|---|---|
| Alabama | # 8 | 77 | 11,823.92 GWh |
| Alaska | # 48 | 140 | 513.29 GWh |
| Arizona | # 14 | 196 | 9,091.99 GWh |
| Arkansas | # 25 | 117 | 4,873.33 GWh |
| California | # 4 | 1,740 | 15,360.54 GWh |
| Colorado | # 31 | 308 | 4,156.36 GWh |
| Connecticut | # 35 | 173 | 3,391.33 GWh |
| Delaware | # 49 | 35 | 236.45 GWh |
| District of Columbia | # 51 | 17 | 14.46 GWh |
| Florida | # 2 | 342 | 25,093.89 GWh |
| Georgia | # 6 | 250 | 12,138.02 GWh |
| Hawaii | # 46 | 70 | 762.50 GWh |
| Idaho | # 41 | 151 | 1,963.84 GWh |
| Illinois | # 5 | 494 | 14,816.74 GWh |
| Indiana | # 15 | 222 | 7,662.28 GWh |
| Iowa | # 21 | 297 | 5,720.38 GWh |
| Kansas | # 24 | 188 | 5,118.39 GWh |
| Kentucky | # 23 | 61 | 5,471.28 GWh |
| Louisiana | # 13 | 90 | 9,131.60 GWh |
| Maine | # 44 | 242 | 1,130.78 GWh |
| Maryland | # 37 | 228 | 3,103.37 GWh |
| Massachusetts | # 45 | 666 | 1,073.93 GWh |
| Michigan | # 11 | 276 | 9,774.25 GWh |
| Minnesota | # 28 | 790 | 4,567.82 GWh |
| Mississippi | # 20 | 60 | 6,404.61 GWh |
| Missouri | # 22 | 129 | 5,701.36 GWh |
| State | Rank | Active Plants | May 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 71 | 2,053.07 GWh |
| Nebraska | # 36 | 126 | 3,193.89 GWh |
| Nevada | # 33 | 117 | 3,848.29 GWh |
| New Hampshire | # 43 | 57 | 1,198.65 GWh |
| New Jersey | # 30 | 398 | 4,274.91 GWh |
| New Mexico | # 29 | 158 | 4,513.39 GWh |
| New York | # 10 | 1,064 | 10,643.78 GWh |
| North Carolina | # 9 | 913 | 11,481.42 GWh |
| North Dakota | # 34 | 59 | 3,601.34 GWh |
| Ohio | # 7 | 211 | 11,886.21 GWh |
| Oklahoma | # 17 | 144 | 7,547.66 GWh |
| Oregon | # 27 | 281 | 4,575.23 GWh |
| Pennsylvania | # 3 | 258 | 18,234.28 GWh |
| Rhode Island | # 47 | 107 | 580.94 GWh |
| South Carolina | # 16 | 209 | 7,632.32 GWh |
| South Dakota | # 42 | 53 | 1,802.78 GWh |
| Tennessee | # 19 | 99 | 6,454.94 GWh |
| Texas | # 1 | 1,019 | 50,690.02 GWh |
| Utah | # 39 | 128 | 2,809.26 GWh |
| Vermont | # 50 | 118 | 186.37 GWh |
| Virginia | # 18 | 250 | 7,445.56 GWh |
| Washington | # 12 | 134 | 9,231.20 GWh |
| West Virginia | # 32 | 41 | 4,142.41 GWh |
| Wisconsin | # 26 | 266 | 4,582.07 GWh |
| Wyoming | # 38 | 69 | 2,983.81 GWh |