Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Jonesboro CWL Solar Park | City Water and Light Plant - (AR) | Jonesboro, AR | Midcontinent Independent System Operator, Inc. (MISO) | 20.5 GWh | May 2022 | Dec 2025 | Solar |
| Jonesboro City Water & Light Plant | City Water and Light Plant - (AR) | Jonesboro, AR | Midcontinent Independent System Operator, Inc. (MISO) | 56.6 GWh | Jun 1999 | Dec 2025 | Natural Gas : 99.9% |
| CityCenter Central Plant Cogen Units | CityCenter Land LLC | Las Vegas, NV | Nevada Power Company (NEVP) | 62.5 GWh | Nov 2009 | May 2026 | Natural Gas |
| Claire Solar Farm | Claire Solar Partners LLC | South Burlington, VT | ISO New England (ISNE) | 3.6 GWh | Jun 2014 | Dec 2024 | Solar |
| Syncarpha Clara City CSG I (Stamer) | Clara City CSG I, LLC | Clara City, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Nov 2018 | Dec 2025 | Solar |
| Clara City Solar | Clara City Solar LLC | Clara City, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Aug 2019 | Dec 2025 | Solar |
| Clarendon Solar Farm | Clarendon Solar Farm, LLC | North Clarendon, VT | ISO New England (ISNE) | 2.9 GWh | Jun 2014 | Dec 2025 | Solar |
| Clark Road Solar 1, LLC | Clark Road Solar 1, LLC | Gardner, MA | ISO New England (ISNE) | 8.0 GWh | Nov 2020 | Dec 2025 | Solar |
| Clark University | Clark University | Worcester, MA | ISO New England (ISNE) | 3.6 GWh | Dec 2012 | Dec 2025 | Natural Gas |
| Crossroads Energy Center | Clarksdale Public Utilities | Clarksdale, MS | Midcontinent Independent System Operator, Inc. (MISO) | 64.7 GWh | Jun 2002 | Dec 2025 | Natural Gas |
| L L Wilkins | Clarksdale Public Utilities | Clarksdale, MS | Midcontinent Independent System Operator, Inc. (MISO) | 166.0 MWh | Sep 1961 | Aug 2025 | Natural Gas : 71.4% Distillate Fuel Oil : 28.6% |
| Clarkstown Landfill Solar Facility | Clarkstown Solar LLC | West Nyack, NY | New York Independent System Operator (NYIS) | 2.0 GWh | Nov 2014 | Dec 2025 | Solar |
| Claverack Creek Solar | Claverack Creek Solar, LLC | Hudson, NY | New York Independent System Operator (NYIS) | 7.8 GWh | Sep 2024 | Dec 2025 | Solar |
| Clay FC | Clay FC, LLC | Louisville, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.8 GWh | Jun 2021 | Dec 2025 | Solar |
| OR - Solops - SPI 18 - Clayfield | Clayfield Solar, LLC | Estacada, OR | Portland General Electric Company (PGE) | 3.2 GWh | Sep 2024 | Dec 2025 | Solar |
| Trumbull Energy Center | Clean Energy Future - Trumbull, LLC. | Warren, OH | PJM Interconnection, LLC (PJM) | 569.2 GWh | - | May 2026 | Natural Gas |
| Middletown- Ohio | Clean Energy Future-Lordstown, LLC | Lordstown, OH | PJM Interconnection, LLC (PJM) | 6.5 TWh | Sep 2018 | May 2026 | Natural Gas |
| Reventure Park | Clean Energy LLC | Charlotte, NC | Duke Energy Carolinas (DUK) | 26.7 GWh | Jun 2014 | Dec 2025 | Landfill Gas |
| Brewster Landfill | Clean Focus Yield, LLC | Brewster, MA | ISO New England (ISNE) | 1.6 GWh | Aug 2014 | Dec 2025 | Solar |
| Tisbury Landfill Solar | Clean Focus Yield, LLC | Tisbury, MA | ISO New England (ISNE) | 1.5 GWh | Jun 2014 | Dec 2025 | Solar |
| Barnstable Landfill | Clean Focus Yield, LLC | Marstons Mills, MA | ISO New England (ISNE) | 4.9 GWh | Aug 2014 | Dec 2025 | Solar |
| Dennis Landfill | Clean Focus Yield, LLC | Dennis, MA | ISO New England (ISNE) | 7.7 GWh | Aug 2014 | Dec 2025 | Solar |
| Coronus Adelanto West 2 | Clean Focus Yield, LLC | Adelanto, CA | California Independent System Operator (CISO) | 3.4 GWh | Dec 2014 | Dec 2025 | Solar |
| Coronus Adelanto West 1 | Clean Focus Yield, LLC | Adelanto, CA | California Independent System Operator (CISO) | 3.4 GWh | Dec 2014 | Dec 2025 | Solar |
| Chatham Landfill | Clean Focus Yield, LLC | Chatham, MA | ISO New England (ISNE) | 2.4 GWh | Aug 2014 | Dec 2025 | Solar |
| Harwich Landfill | Clean Focus Yield, LLC | Harwich, MA | ISO New England (ISNE) | 5.9 GWh | Jul 2014 | Dec 2025 | Solar |
| Jersey Gardens Phase 1 | Clean Focus Yield, LLC | Elizabeth, NJ | PJM Interconnection, LLC (PJM) | 2.3 GWh | Nov 2011 | Dec 2024 | Solar |
| Katama Farm | Clean Focus Yield, LLC | Edgartown, MA | ISO New England (ISNE) | 1.6 GWh | May 2014 | Dec 2025 | Solar |
| Nunnepog | Clean Focus Yield, LLC | Edgartown, MA | ISO New England (ISNE) | 1.7 GWh | May 2014 | Dec 2025 | Solar |
| Butler Plaza | Clean Focus Yield, LLC | Gainesville, FL | Gainesville Regional Utilities (GVL) | 2.5 GWh | Nov 2010 | Dec 2025 | Solar |
| Lancaster | Clean Focus Yield, LLC | Lancaster, CA | California Independent System Operator (CISO) | 7.6 GWh | Oct 2018 | Dec 2025 | Solar |
| Durham AWTF | Clean Water Services | Tigard, OR | Portland General Electric Company (PGE) | 8.2 GWh | Mar 2015 | May 2026 | Other Biomass Gas |
| KDC Solar PR1, LLC | CleanCapital Holdings | Jackson, NJ | PJM Interconnection, LLC (PJM) | 27.6 GWh | May 2019 | Dec 2025 | Solar |
| Steel Sun | CleanCapital Holdings | Lackawanna, NY | New York Independent System Operator (NYIS) | 4.4 GWh | Nov 2016 | May 2026 | Solar |
| Airport 1 Solar (DIA) | CleanCapital Holdings | Denver, CO | Southwest Power Pool (SWPP) | 1.5 GWh | Nov 2009 | Dec 2025 | Solar |
| Steel Sun 2: 2303-III-2 Hamburg Tpke | CleanCapital Holdings | Lackawanna, NY | New York Independent System Operator (NYIS) | 3.1 GWh | Apr 2019 | Dec 2025 | Solar |
| Homer Street West | CleanCapital Holdings | Olean, NY | New York Independent System Operator (NYIS) | 2.0 GWh | Apr 2019 | Dec 2025 | Solar |
| KDC Solar ASGM | CleanCapital Holdings | Bridgeton, NJ | PJM Interconnection, LLC (PJM) | 6.3 GWh | Jun 2019 | Dec 2025 | Solar |
| KDC Solar CSCP LLC | CleanCapital Holdings | Freehold, NJ | PJM Interconnection, LLC (PJM) | 4.7 GWh | Aug 2019 | Dec 2025 | Solar |
| Steel Sun 2: 2303-III-4 Hamburg Tpke | CleanCapital Holdings | Lackawanna, NY | New York Independent System Operator (NYIS) | 3.0 GWh | Apr 2019 | Dec 2025 | Solar |
| WED GW Solar, LLC | CleanCapital Holdings | Lincoln, RI | ISO New England (ISNE) | 4.5 GWh | Dec 2018 | Dec 2025 | Solar |
| Homer Street East | CleanCapital Holdings | Olean, NY | New York Independent System Operator (NYIS) | 1.8 GWh | Apr 2019 | Dec 2025 | Solar |
| Steel Sun 2: 2303-III-9 Hamburg Tpke | CleanCapital Holdings | Lackawanna, NY | New York Independent System Operator (NYIS) | 3.2 GWh | Apr 2019 | Dec 2025 | Solar |
| GSPP Boxborough Littleton (MA) | CleanCapital Holdings | Boxborough, MA | ISO New England (ISNE) | 6.2 GWh | Dec 2018 | Dec 2025 | Solar |
| GD West Greenwich Victory I, LLC | CleanCapital Holdings | West Greenwich, RI | ISO New England (ISNE) | 2.7 GWh | Nov 2019 | Dec 2025 | Solar |
| GD Richmond Buttonwoods I, LLC | CleanCapital Holdings | Richmond, RI | ISO New England (ISNE) | 2.0 GWh | Nov 2019 | Dec 2025 | Solar |
| Methuen Landfill | CleanCapital Holdings | Methuen, MA | ISO New England (ISNE) | 1.5 GWh | Jun 2013 | Dec 2025 | Solar |
| Lepomis PV Energy LLC | CleanCapital Holdings | Plymouth, MA | ISO New England (ISNE) | 7.7 GWh | May 2014 | Dec 2025 | Solar |
| Ludlow Landfill | CleanCapital Holdings | Ludlow, MA | ISO New England (ISNE) | 3.2 GWh | Jul 2013 | Dec 2025 | Solar |
| Easton Landfill | CleanCapital Holdings | Easton, MA | ISO New England (ISNE) | 2.5 GWh | Sep 2013 | Dec 2025 | Solar |
| EAFB - South Base | CleanCapital Holdings | Edwards Air Force Bas, CA | California Independent System Operator (CISO) | 2.4 GWh | Jan 2012 | Dec 2025 | Solar |
| Acushnet-Braley Road 1 | CleanCapital Holdings | Freetown, MA | ISO New England (ISNE) | 2.6 GWh | Dec 2012 | Dec 2025 | Solar |
| EAFB - North Base | CleanCapital Holdings | Edwards Air Force Bas, CA | California Independent System Operator (CISO) | 2.6 GWh | Jan 2012 | Dec 2025 | Solar |
| Enerparc CA1 LLC | CleanCapital Holdings | Hollister, CA | California Independent System Operator (CISO) | 3.2 GWh | May 2014 | Dec 2025 | Solar |
| Dartmouth Landfill | CleanCapital Holdings | Dartmouth, MA | ISO New England (ISNE) | 1.8 GWh | Jan 2013 | Dec 2025 | Solar |
| CSD 2 - Heritage High | CleanCapital Holdings | Brentwood, CA | California Independent System Operator (CISO) | 1.7 GWh | Aug 2013 | Dec 2025 | Solar |
| CSD 2- Freedom High | CleanCapital Holdings | Oakley, CA | California Independent System Operator (CISO) | 1.3 GWh | Jul 2013 | Dec 2025 | Solar |
| Blue Sky One | CleanCapital Holdings | Taos, NM | Public Service Company of New Mexico (PNM) | 2.7 GWh | Sep 2012 | Dec 2025 | Solar |
| Acushnet- High Hill | CleanCapital Holdings | Dartmouth, MA | ISO New England (ISNE) | 3.3 GWh | Feb 2013 | Dec 2025 | Solar |
| Plymouth Site 1 | CleanCapital Holdings | Plympton, MA | ISO New England (ISNE) | 7.5 GWh | Sep 2013 | Dec 2025 | Solar |
| SDCCD - Miramar | CleanCapital Holdings | San Diego, CA | California Independent System Operator (CISO) | 1.3 GWh | Jan 2011 | Dec 2025 | Solar |
| SDCWA - Twin Oaks | CleanCapital Holdings | San Marcos, CA | California Independent System Operator (CISO) | 1.6 GWh | Apr 2011 | Dec 2025 | Solar |
| EDF Lancaster | CleanCapital Holdings | Lancaster, MA | ISO New England (ISNE) | 5.1 GWh | Jun 2014 | Dec 2025 | Solar |
| Rockville Solar II, LLC | CleanCapital Holdings | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 912.0 MWh | Jul 2014 | Dec 2025 | Solar |
| Mesa PV1 | CleanCapital Holdings | Grand Junction, CO | Public Service Company of Colorado (PSCO) | 1.9 GWh | Nov 2014 | Dec 2025 | Solar |
| Sterling PV 3 | CleanCapital Holdings | Sterling, CO | Public Service Company of Colorado (PSCO) | 2.2 GWh | Nov 2014 | Dec 2025 | Solar |
| Sonora 1 | CleanCapital Holdings | Jamestown, CA | California Independent System Operator (CISO) | 858.0 MWh | Nov 2013 | Dec 2025 | Solar |
| Rockville Solar I LLC | CleanCapital Holdings | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Mar 2014 | Dec 2025 | Solar |
| Samuel Mickle School | CleanCapital Holdings | Mickleton, NJ | PJM Interconnection, LLC (PJM) | 912.0 MWh | Nov 2017 | Dec 2025 | Solar |
| Vallecitos Water District | CleanCapital Holdings | San Marcos, CA | California Independent System Operator (CISO) | 2.8 GWh | Aug 2021 | Dec 2025 | Solar |
| Corning Riverview (CSG) | CleanCapital Holdings | Tonawanda, NY | New York Independent System Operator (NYIS) | 7.4 GWh | Nov 2020 | Dec 2025 | Solar |
| Easthampton Landfill-City of Easthampton | CleanCapital Holdings | Easthampton, MA | ISO New England (ISNE) | 2.8 GWh | May 2012 | Dec 2025 | Solar |
| Madera Community Hospital | CleanCapital Holdings | Madera, CA | California Independent System Operator (CISO) | 1.7 GWh | Sep 2011 | Dec 2025 | Solar |
| Acushnet Hawes Reed Road | CleanCapital Holdings | Dartmouth, MA | ISO New England (ISNE) | 1.8 GWh | Jun 2012 | Dec 2025 | Solar |
| PCIP Solar | CleanCapital Holdings | Timberlake, NC | Duke Energy Progress East (CPLE) | 898.0 MWh | Oct 2011 | Dec 2025 | Solar |
| Acushnet AD Makepeace | CleanCapital Holdings | Wareham, MA | ISO New England (ISNE) | 6.1 GWh | Jun 2012 | Dec 2025 | Solar |
| Tipton 2 - (CA) | CleanCapital Holdings | Tipton, CA | California Independent System Operator (CISO) | 2.7 GWh | Nov 2024 | Dec 2025 | Solar |
| MLH 3 | CleanCapital Holdings | Gainesville, FL | Gainesville Regional Utilities (GVL) | 683.0 MWh | Sep 2013 | Dec 2025 | Solar |
| MLH 2 | CleanCapital Holdings | Gainesville, FL | Gainesville Regional Utilities (GVL) | 644.0 MWh | Sep 2013 | Dec 2025 | Solar |
| Tipton 1 - (CA) | CleanCapital Holdings | Tipton, CA | California Independent System Operator (CISO) | 167.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Visalia - (CA) | CleanCapital Holdings | Visalia, CA | California Independent System Operator (CISO) | 3.2 GWh | May 2025 | Dec 2025 | Solar |
| KDC Solar TC Blandair Park LLC | CleanCapital Holdings | West Friendship, MD | PJM Interconnection, LLC (PJM) | 3.5 GWh | Sep 2022 | Dec 2025 | Solar |
| LSE Musca Solar | CleanCapital Holdings | Beavers Dam, NY | New York Independent System Operator (NYIS) | 4.7 GWh | Sep 2022 | Dec 2025 | Solar |
| Gorham Solar 1 (CSG) | CleanCapital Holdings | Gorham, ME | ISO New England (ISNE) | 6.6 GWh | Oct 2023 | Dec 2025 | Solar |
| KDC Solar TC George Howard LLC | CleanCapital Holdings | West Friendship, MD | PJM Interconnection, LLC (PJM) | 3.3 GWh | Sep 2022 | Dec 2025 | Solar |
| KDC Solar TC Little Patuxent WWTP LLC | CleanCapital Holdings | West Friendship, MD | PJM Interconnection, LLC (PJM) | 3.8 GWh | Sep 2022 | Dec 2024 | Solar |
| LSE Pavo Solar | CleanCapital Holdings | Walton, NY | New York Independent System Operator (NYIS) | 2.0 GWh | Aug 2022 | Dec 2025 | Solar |
| WED Stilson Solar | CleanCapital Holdings | Richmond, RI | ISO New England (ISNE) | 2.9 GWh | Nov 2017 | Dec 2025 | Solar |
| WED Kingstown Solar I, LLC - West | CleanCapital Holdings | Richmond, RI | ISO New England (ISNE) | 2.1 GWh | Nov 2017 | Dec 2025 | Solar |
| Phelps 158 Solar Farm | CleanCapital Holdings | Conway, NC | PJM Interconnection, LLC (PJM) | 5.4 GWh | Jan 2018 | Dec 2025 | Solar |
| WED Kingstown Solar I - East Array | CleanCapital Holdings | Washington, RI | ISO New England (ISNE) | 4.6 GWh | Nov 2017 | Dec 2025 | Solar |
| IGS Solar I - EWR6 | CleanCapital Holdings | Avenel, NJ | PJM Interconnection, LLC (PJM) | 3.2 GWh | Oct 2016 | Dec 2025 | Solar |
| IGS Solar I - EWR5 | CleanCapital Holdings | Avenel, NJ | PJM Interconnection, LLC (PJM) | 3.6 GWh | Oct 2016 | Dec 2025 | Solar |
| IGS Solar I - BWI5 | CleanCapital Holdings | Baltimore, MD | PJM Interconnection, LLC (PJM) | 2.0 GWh | Nov 2016 | Dec 2024 | Solar |
| Cornillie 2 Community (CSG) | CleanCapital Holdings | North Branch, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Nov 2020 | Dec 2025 | Solar |
| Brenda Luhman - CSG | CleanCapital Holdings | Zumbrota, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Jul 2020 | Dec 2025 | Solar |
| Hammer Community (CSG) | CleanCapital Holdings | Clear Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Jul 2020 | Dec 2025 | Solar |
| Gohman Community Solar (CSG) | CleanCapital Holdings | Clear Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Jan 2020 | Dec 2025 | Solar |
| Paulson Community (CSG) | CleanCapital Holdings | St. Peter, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Mar 2020 | Dec 2025 | Solar |
| Laurel Village (CSG) | CleanCapital Holdings | Cokato, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Mar 2020 | Dec 2025 | Solar |
Summary of Power Plants By State
Figures are based on May 2026 generation numbers.| State | Rank | Active Plants | May 2026 Generation |
|---|---|---|---|
| Alabama | # 8 | 77 | 11,823.92 GWh |
| Alaska | # 48 | 140 | 513.29 GWh |
| Arizona | # 14 | 196 | 9,091.99 GWh |
| Arkansas | # 25 | 117 | 4,873.33 GWh |
| California | # 4 | 1,740 | 15,360.54 GWh |
| Colorado | # 31 | 308 | 4,156.36 GWh |
| Connecticut | # 35 | 173 | 3,391.33 GWh |
| Delaware | # 49 | 35 | 236.45 GWh |
| District of Columbia | # 51 | 17 | 14.46 GWh |
| Florida | # 2 | 342 | 25,093.89 GWh |
| Georgia | # 6 | 250 | 12,138.02 GWh |
| Hawaii | # 46 | 70 | 762.50 GWh |
| Idaho | # 41 | 151 | 1,963.84 GWh |
| Illinois | # 5 | 494 | 14,816.74 GWh |
| Indiana | # 15 | 222 | 7,662.28 GWh |
| Iowa | # 21 | 297 | 5,720.38 GWh |
| Kansas | # 24 | 188 | 5,118.39 GWh |
| Kentucky | # 23 | 61 | 5,471.28 GWh |
| Louisiana | # 13 | 90 | 9,131.60 GWh |
| Maine | # 44 | 242 | 1,130.78 GWh |
| Maryland | # 37 | 228 | 3,103.37 GWh |
| Massachusetts | # 45 | 666 | 1,073.93 GWh |
| Michigan | # 11 | 276 | 9,774.25 GWh |
| Minnesota | # 28 | 790 | 4,567.82 GWh |
| Mississippi | # 20 | 60 | 6,404.61 GWh |
| Missouri | # 22 | 129 | 5,701.36 GWh |
| State | Rank | Active Plants | May 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 71 | 2,053.07 GWh |
| Nebraska | # 36 | 126 | 3,193.89 GWh |
| Nevada | # 33 | 117 | 3,848.29 GWh |
| New Hampshire | # 43 | 57 | 1,198.65 GWh |
| New Jersey | # 30 | 398 | 4,274.91 GWh |
| New Mexico | # 29 | 158 | 4,513.39 GWh |
| New York | # 10 | 1,064 | 10,643.78 GWh |
| North Carolina | # 9 | 913 | 11,481.42 GWh |
| North Dakota | # 34 | 59 | 3,601.34 GWh |
| Ohio | # 7 | 211 | 11,886.21 GWh |
| Oklahoma | # 17 | 144 | 7,547.66 GWh |
| Oregon | # 27 | 281 | 4,575.23 GWh |
| Pennsylvania | # 3 | 258 | 18,234.28 GWh |
| Rhode Island | # 47 | 107 | 580.94 GWh |
| South Carolina | # 16 | 209 | 7,632.32 GWh |
| South Dakota | # 42 | 53 | 1,802.78 GWh |
| Tennessee | # 19 | 99 | 6,454.94 GWh |
| Texas | # 1 | 1,019 | 50,690.02 GWh |
| Utah | # 39 | 128 | 2,809.26 GWh |
| Vermont | # 50 | 118 | 186.37 GWh |
| Virginia | # 18 | 250 | 7,445.56 GWh |
| Washington | # 12 | 134 | 9,231.20 GWh |
| West Virginia | # 32 | 41 | 4,142.41 GWh |
| Wisconsin | # 26 | 266 | 4,582.07 GWh |
| Wyoming | # 38 | 69 | 2,983.81 GWh |