V H Braunig
15290 Streich Rd., Elmendorf, TX 78112Plant Summary Information
V H Braunig is ranked #106 out of 314 natural gas power plants in Texas in terms of total annual net electricity generation.
V H Braunig is comprised of 7 generators and generated 57.7 GWh during the 3-month period between November 2025 to February 2026.
| Plant Name | V H Braunig |
|---|---|
| Utility Name | City of San Antonio - (TX) |
| Location | Bexar County, TX |
| Initial Operation Date | March 1966 |
| Last Update | Feb 2026 |
| Annual Generation | 378.6 GWh |
| Annual Consumption | 5.6 M MMBtu |
| Ranked #1,669 out of 12,637 Power Plants Nationwide | |
| Ranked #607 out of 2,243 Natural Gas Power Plants Nationwide | |
| Ranked #331 out of 820 Texas Power Plants | |
| Ranked #106 out of 314 Texas Natural Gas Power Plants | |
| Fuel Types | Natural Gas : 99.4% Distillate Fuel Oil : 0.6% |
Map of V H Braunig
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for V H Braunig.
Monthly Net Generation for V H Braunig
Monthly Plant Fuel Consumption for V H Braunig
V H Braunig Details
| Summary Information | |
|---|---|
| Plant Name | V H Braunig (3612) |
| Plant Address | 15290 Streich Rd., Elmendorf, TX 78112 |
| Utility | City of San Antonio - (TX) (16604) |
| Latitude, Longitude | 29.2567, -98.3825 |
| Generation Dates on File | Jan 2001 to Feb 2026 |
| Initial Operation Date | March 1966 |
| Annual Generation | 378.6 GWh |
| Fuel Types | Natural Gas : 99.4% Distillate Fuel Oil : 0.6% |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | Braunig Lake |
| Ash Impoundment | No |
| Transmission / Distribution Owner | City of San Antonio - (TX) (16604) TX |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name | ENTERPRISE TEXAS PIPELINE |
| Natural Gas Storage | No |
Generator 1 Details Operating March 1966
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | BRAUNIG_VHB1 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | BRAUNIG_VHB1 |
| Nameplate Capacity | 225 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 217 MW |
| Winter Capacity | 217 MW |
| Minimum Load | 60 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | March 1966 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 2 Details Operating April 1968
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | BRAUNIG_VHB2 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | BRAUNIG_VHB2 |
| Nameplate Capacity | 252 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 230 MW |
| Winter Capacity | 230 MW |
| Minimum Load | 60 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | April 1968 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 3 Details Operating May 1970
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | BRAUNIG_VHB3 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | BRAUNIG_VHB3 |
| Nameplate Capacity | 417 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 412 MW |
| Winter Capacity | 412 MW |
| Minimum Load | 70 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | May 1970 |
|---|---|
| Planned Retirement | March 2027 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 5 Details Operating December 2010
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | BR_VHB6CT5_6 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | BR_VHB6CT5_6 |
| Nameplate Capacity | 61 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 48 MW |
| Winter Capacity | 48 MW |
| Minimum Load | 20 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2010 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | No |
|---|---|
| Net Summer Capacity With Natural Gas | 48 MW |
| Net Winter Capacity With Natural Gas | 48 MW |
| Net Summer Capacity With Oil | 48 MW |
| Net Winter Capacity With Oil | 48 MW |
| Time To Switch From Gas To Oil | 6H |
| Time To Switch From Oil To Gas | 6H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator 6 Details Operating December 2010
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | BR_VHB6CT5_6 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | BR_VHB6CT5_6 |
| Nameplate Capacity | 61 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 48 MW |
| Winter Capacity | 48 MW |
| Minimum Load | 20 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2010 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | No |
|---|---|
| Net Summer Capacity With Natural Gas | 48 MW |
| Net Winter Capacity With Natural Gas | 48 MW |
| Net Summer Capacity With Oil | 48 MW |
| Net Winter Capacity With Oil | 48 MW |
| Time To Switch From Gas To Oil | 6H |
| Time To Switch From Oil To Gas | 6H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator 7 Details Operating December 2010
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | BR_VHB6CT7_8 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | BR_VHB6CT7_8 |
| Nameplate Capacity | 61 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 48 MW |
| Winter Capacity | 48 MW |
| Minimum Load | 20 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2010 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | No |
|---|---|
| Net Summer Capacity With Natural Gas | 48 MW |
| Net Winter Capacity With Natural Gas | 48 MW |
| Net Summer Capacity With Oil | 48 MW |
| Net Winter Capacity With Oil | 48 MW |
| Time To Switch From Gas To Oil | 6H |
| Time To Switch From Oil To Gas | 6H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator 8 Details Operating December 2010
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | BR_VHB6CT7_8 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | BR_VHB6CT7_8 |
| Nameplate Capacity | 61 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 47 MW |
| Winter Capacity | 47 MW |
| Minimum Load | 20 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2010 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | No |
|---|---|
| Net Summer Capacity With Natural Gas | 47 MW |
| Net Winter Capacity With Natural Gas | 47 MW |
| Net Summer Capacity With Oil | 47 MW |
| Net Winter Capacity With Oil | 47 MW |
| Time To Switch From Gas To Oil | 6H |
| Time To Switch From Oil To Gas | 6H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
V H Braunig Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #597 | Kennedy International Airport Cogen | Jamaica, NY | 398.6 GWh |
| #598 | Primient Loudon Plant | Loudon, TN | 393.6 GWh |
| #599 | Tolk | Muleshoe, TX | 3.0 TWh |
| #600 | Washington Parish Energy Center | Bogalusa, LA | 391.5 GWh |
| #601 | Yellowstone County Generating Station | Laurel, MT | 390.7 GWh |
| #602 | Mulberry Cogeneration Facility | Bartow, FL | 388.0 GWh |
| #603 | Orange Cogeneration Facility | Bartow, FL | 387.5 GWh |
| #604 | Tulsa | Tulsa, OK | 384.5 GWh |
| #605 | Marsh Run Generation Facility | Remington, VA | 390.8 GWh |
| #606 | University of Florida | Gainesville, FL | 379.0 GWh |
| #608 | Trinidad (TX) | Trinidad, TX | 376.4 GWh |
| #609 | F.D. Kuester Generating Station | Negaunee, MI | 374.8 GWh |
| #610 | West Valley Generation Project | West Valley City, UT | 374.8 GWh |
| #611 | Desert Star Energy Center | Boulder City, NV | 371.1 GWh |
| #612 | Western 102 Power Plant | McCarran, NV | 369.4 GWh |
| #613 | Kimberly Clark Mobile - CHP Plant | Mobile, AL | 367.8 GWh |
| #614 | Bellingham Cogeneration Facility | Bellingham, MA | 367.8 GWh |
| #615 | Valley (WI) | Milwaukee, WI | 365.4 GWh |
| #616 | Zion Energy Center | Zion, IL | 363.6 GWh |
| #617 | Hal C Weaver Power Plant | Austin, TX | 361.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding V H Braunig.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Arthur Von Rosenberg | Elmendorf, TX | 3.6 TWh | 0.1 mi |
| Blue Wing Solar Energy Generation | San Antonio, TX | 19.1 GWh | 3.5 mi |
| Covel Gardens Gas Recovery | San Antonio, TX | 20.6 GWh | 17.5 mi |
| CPS 1 Community Solar | Adkins, TX | 1.8 GWh | 10.8 mi |
| FELPS 1 - Calaveras | Floresville, TX | 1.8 GWh | 8.3 mi |
| FELPS 2 - Calaveras | Floresville, TX | 1.9 GWh | 8.3 mi |
| FELPS 6- Floresville West | Floresville, TX | 2.1 GWh | 14.2 mi |
| FELPS 7- Floresville West | Floresville, TX | 2.1 GWh | 14.3 mi |
| HEB_CPSSADC | San Antonio, TX | 944.0 MWh | 11.2 mi |
| IKEA Live Oak Rooftop PV System | Live Oak, TX | 2.1 GWh | 17.4 mi |
| J K Spruce | San Antonio, TX | 6.6 TWh | 5.2 mi |
| Leon Creek | San Antonio, TX | 227.5 GWh | 13.4 mi |
| Nelson Gardens Landfill Gas to Energy | San Antonio, TX | 6.7 GWh | 17.5 mi |
| O W Sommers | San Antonio, TX | 2.5 TWh | 5 mi |
| OCI Alamo 2, LLC | Converse, TX | 8.8 GWh | 15 mi |
| OCI Alamo 3 LLC | San Antonio, TX | 9.9 GWh | 16.2 mi |
| OCI Alamo Solar I Hybrid | San Antonio, TX | 84.0 GWh | 3.9 mi |
| SunE CPS1 LLC | San Antonio, TX | 4.5 GWh | 2.3 mi |
| SunE CPS2 LLC | San Antonio, TX | 7.0 GWh | 2.3 mi |
| SunE CPS3 LLC | Somerset, TX | 7.2 GWh | 17.4 mi |