V H Braunig
15290 Streich Rd., Elmendorf, TX 78112Plant Summary Information
V H Braunig is ranked #72 out of 314 natural gas power plants in Texas in terms of total annual net electricity generation.
V H Braunig is comprised of 7 generators and generated 106.2 GWh during the 3-month period between June 2025 to September 2025.
| Plant Name | V H Braunig |
|---|---|
| Utility Name | City of San Antonio - (TX) |
| Location | Bexar County, TX |
| Initial Operation Date | March 1966 |
| Last Update | Sep 2025 |
| Annual Generation | 1.3 TWh |
| Annual Consumption | 16.0 M MMBtu |
| Ranked #643 out of 12,539 Power Plants Nationwide | |
| Ranked #395 out of 2,243 Natural Gas Power Plants Nationwide | |
| Ranked #95 out of 799 Texas Power Plants | |
| Ranked #72 out of 314 Texas Natural Gas Power Plants | |
| Fuel Types | Natural Gas : 99.9% |
Map of V H Braunig
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for V H Braunig.
Monthly Net Generation for V H Braunig
V H Braunig Details
| Summary Information | |
|---|---|
| Plant Name | V H Braunig (3612) |
| Plant Address | 15290 Streich Rd., Elmendorf, TX 78112 |
| Utility | City of San Antonio - (TX) (16604) |
| Latitude, Longitude | 29.2567, -98.3825 |
| Generation Dates on File | Jan 2001 to Sep 2025 |
| Initial Operation Date | March 1966 |
| Annual Generation | 1.3 TWh |
| Fuel Types | Natural Gas : 99.9% |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | Braunig Lake |
| Ash Impoundment | No |
| Transmission / Distribution Owner | City of San Antonio - (TX) (16604) TX |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name | ENTERPRISE TEXAS PIPELINE |
| Natural Gas Storage | No |
Generator 1 Details Operating March 1966
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | BRAUNIG_VHB1 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | BRAUNIG_VHB1 |
| Nameplate Capacity | 225 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 217 MW |
| Winter Capacity | 217 MW |
| Minimum Load | 60 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | March 1966 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 2 Details Operating April 1968
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | BRAUNIG_VHB2 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | BRAUNIG_VHB2 |
| Nameplate Capacity | 252 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 230 MW |
| Winter Capacity | 230 MW |
| Minimum Load | 60 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | April 1968 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 3 Details Operating May 1970
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | BRAUNIG_VHB3 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | BRAUNIG_VHB3 |
| Nameplate Capacity | 417 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 412 MW |
| Winter Capacity | 412 MW |
| Minimum Load | 70 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | May 1970 |
|---|---|
| Planned Retirement | March 2027 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 5 Details Operating December 2010
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | BR_VHB6CT5_6 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | BR_VHB6CT5_6 |
| Nameplate Capacity | 61 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 48 MW |
| Winter Capacity | 48 MW |
| Minimum Load | 20 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2010 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | No |
|---|---|
| Net Summer Capacity With Natural Gas | 48 MW |
| Net Winter Capacity With Natural Gas | 48 MW |
| Net Summer Capacity With Oil | 48 MW |
| Net Winter Capacity With Oil | 48 MW |
| Time To Switch From Gas To Oil | 6H |
| Time To Switch From Oil To Gas | 6H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator 6 Details Operating December 2010
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | BR_VHB6CT5_6 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | BR_VHB6CT5_6 |
| Nameplate Capacity | 61 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 48 MW |
| Winter Capacity | 48 MW |
| Minimum Load | 20 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2010 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | No |
|---|---|
| Net Summer Capacity With Natural Gas | 48 MW |
| Net Winter Capacity With Natural Gas | 48 MW |
| Net Summer Capacity With Oil | 48 MW |
| Net Winter Capacity With Oil | 48 MW |
| Time To Switch From Gas To Oil | 6H |
| Time To Switch From Oil To Gas | 6H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator 7 Details Operating December 2010
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | BR_VHB6CT7_8 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | BR_VHB6CT7_8 |
| Nameplate Capacity | 61 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 48 MW |
| Winter Capacity | 48 MW |
| Minimum Load | 20 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2010 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | No |
|---|---|
| Net Summer Capacity With Natural Gas | 48 MW |
| Net Winter Capacity With Natural Gas | 48 MW |
| Net Summer Capacity With Oil | 48 MW |
| Net Winter Capacity With Oil | 48 MW |
| Time To Switch From Gas To Oil | 6H |
| Time To Switch From Oil To Gas | 6H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator 8 Details Operating December 2010
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | BR_VHB6CT7_8 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | BR_VHB6CT7_8 |
| Nameplate Capacity | 61 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 47 MW |
| Winter Capacity | 47 MW |
| Minimum Load | 20 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2010 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | No |
|---|---|
| Net Summer Capacity With Natural Gas | 47 MW |
| Net Winter Capacity With Natural Gas | 47 MW |
| Net Summer Capacity With Oil | 47 MW |
| Net Winter Capacity With Oil | 47 MW |
| Time To Switch From Gas To Oil | 6H |
| Time To Switch From Oil To Gas | 6H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
V H Braunig Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #385 | Gordonsville Energy LP | Gordonsville, VA | 1.4 TWh |
| #386 | E C Gaston | Wilsonville, AL | 3.0 TWh |
| #387 | Greene County | Demopolis, AL | 1.4 TWh |
| #388 | Rathdrum Power LLC | Rathdrum, ID | 1.4 TWh |
| #389 | Hog Bayou Energy Center | Mobile, AL | 1.4 TWh |
| #390 | Cope | Cope, SC | 1.7 TWh |
| #391 | Tait Electric Generating Station | Moraine, OH | 1.3 TWh |
| #392 | Johnson County | Cleburne, TX | 1.3 TWh |
| #393 | Chalk Point Power | Aquasco, MD | 1.3 TWh |
| #394 | Northside Generating Station | Jacksonville, FL | 2.6 TWh |
| #396 | LSP-Cottage Grove LP | Cottage Grove, MN | 1.3 TWh |
| #397 | Apex Generating Station | Las Vegas, NV | 1.3 TWh |
| #398 | Elk Station | Abernathy, TX | 1.3 TWh |
| #399 | ExxonMobil Baytown Refinery | Baytown, TX | 1.2 TWh |
| #400 | Magnolia Power Project | Burbank, CA | 1.2 TWh |
| #401 | LaO Energy Systems | Plaquemine, LA | 1.4 TWh |
| #402 | Holland Energy Facility | Beecher City, IL | 1.2 TWh |
| #403 | S O Purdom | St Marks, FL | 1.2 TWh |
| #404 | Armstrong | Shelocta, PA | 1.2 TWh |
| #405 | El Segundo Cogen | El Segundo, CA | 1.2 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding V H Braunig.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Arthur Von Rosenberg | Elmendorf, TX | 3.4 TWh | 0.1 mi |
| Blue Wing Solar Energy Generation | San Antonio, TX | 19.1 GWh | 3.5 mi |
| Covel Gardens Gas Recovery | San Antonio, TX | 20.6 GWh | 17.5 mi |
| CPS 1 Community Solar | Adkins, TX | 1.8 GWh | 10.8 mi |
| FELPS 1 - Calaveras | Floresville, TX | 1.8 GWh | 8.3 mi |
| FELPS 2 - Calaveras | Floresville, TX | 1.9 GWh | 8.3 mi |
| FELPS 6- Floresville West | Floresville, TX | 2.1 GWh | 14.2 mi |
| FELPS 7- Floresville West | Floresville, TX | 2.1 GWh | 14.3 mi |
| HEB_CPSSADC | San Antonio, TX | 944.0 MWh | 11.2 mi |
| IKEA Live Oak Rooftop PV System | Live Oak, TX | 2.1 GWh | 17.4 mi |
| J K Spruce | San Antonio, TX | 6.4 TWh | 5.2 mi |
| Leon Creek | San Antonio, TX | 227.5 GWh | 13.4 mi |
| Nelson Gardens Landfill Gas to Energy | San Antonio, TX | 6.7 GWh | 17.5 mi |
| O W Sommers | San Antonio, TX | 2.5 TWh | 5 mi |
| OCI Alamo 2, LLC | Converse, TX | 8.8 GWh | 15 mi |
| OCI Alamo 3 LLC | San Antonio, TX | 9.9 GWh | 16.2 mi |
| OCI Alamo Solar I Hybrid | San Antonio, TX | 84.0 GWh | 3.9 mi |
| SunE CPS1 LLC | San Antonio, TX | 4.5 GWh | 2.3 mi |
| SunE CPS2 LLC | San Antonio, TX | 7.0 GWh | 2.3 mi |
| SunE CPS3 LLC | Somerset, TX | 7.2 GWh | 17.4 mi |