Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Gardners Falls | Central Rivers Power MA, LLC | Buckland, MA | ISO New England (ISNE) | 11.4 GWh | Dec 1913 | Dec 2025 | Water |
| Dwight | Central Rivers Power MA, LLC | Chicopee, MA | ISO New England (ISNE) | 5.6 GWh | Dec 1919 | Dec 2025 | Water |
| Indian Orchard | Central Rivers Power MA, LLC | Indian Orchard, MA | ISO New England (ISNE) | 3.5 GWh | Dec 1927 | Dec 2025 | Water |
| Canaan | Central Rivers Power NH, LLC | Canaan, VT | ISO New England (ISNE) | 6.3 GWh | Jul 1927 | Dec 2025 | Water |
| Smith (NH) | Central Rivers Power NH, LLC | Berlin, NH | ISO New England (ISNE) | 87.5 GWh | Jul 1948 | Dec 2025 | Water |
| Amoskeag | Central Rivers Power NH, LLC | Manchester, NH | ISO New England (ISNE) | 64.9 GWh | Jul 1922 | Dec 2025 | Water |
| Ayers Island | Central Rivers Power NH, LLC | Bristol, NH | ISO New England (ISNE) | 36.3 GWh | Jul 1925 | Dec 2025 | Water |
| Eastman Falls | Central Rivers Power NH, LLC | Franklin, NH | ISO New England (ISNE) | 21.9 GWh | Jul 1937 | Dec 2025 | Water |
| Garvins Falls | Central Rivers Power NH, LLC | Bow, NH | ISO New England (ISNE) | 24.8 GWh | Jul 1925 | Dec 2025 | Water |
| Gorham | Central Rivers Power NH, LLC | Gorham, NH | ISO New England (ISNE) | 8.4 GWh | Jul 1917 | Dec 2025 | Water |
| Hooksett | Central Rivers Power NH, LLC | Hooksett, NH | ISO New England (ISNE) | 6.3 GWh | Jul 1927 | Dec 2025 | Water |
| Jackman | Central Rivers Power NH, LLC | Hillsborough, NH | ISO New England (ISNE) | 8.4 GWh | Jan 1926 | Aug 2025 | Water |
| Montgomery Creek Hydro | Central Rivers Power US, LLC | Montgomery Creek, CA | California Independent System Operator (CISO) | 9.2 GWh | Dec 1986 | Dec 2025 | Water |
| Slate Creek | Central Rivers Power US, LLC | Lakehead, CA | PacifiCorp West (PACW) | 12.2 GWh | Apr 1990 | Dec 2025 | Water |
| Twin Falls Hydro | Central Rivers Power US, LLC | North Bend, WA | Puget Sound Energy, Inc. (PSEI) | 59.3 GWh | Nov 1989 | Dec 2025 | Water |
| Copenhagen Plant | Central Rivers Power US, LLC | Copenhagen, NY | New York Independent System Operator (NYIS) | 7.0 GWh | May 1984 | Dec 2025 | Water |
| High Shoals Hydro (NC) | Central Rivers Power US, LLC | High Shoals, NC | Duke Energy Carolinas (DUK) | 2.5 GWh | Jun 1934 | Aug 2026 | Water |
| Beaver Valley Patterson Dam | Central Rivers Power US, LLC | Beaver Falls, PA | PJM Interconnection, LLC (PJM) | 4.4 GWh | Aug 1982 | Dec 2025 | Water |
| Bear Creek (CA) | Central Rivers Power US, LLC | Shingletown, CA | California Independent System Operator (CISO) | 6.5 GWh | Dec 1989 | Dec 2025 | Water |
| Hailesboro 4 Plant | Central Rivers Power US, LLC | Hailesboro, NY | New York Independent System Operator (NYIS) | 9.8 GWh | Dec 1921 | Dec 2025 | Water |
| Lachute Hydro Upper | Central Rivers Power US, LLC | Ticonderoga, NY | New York Independent System Operator (NYIS) | 8.1 GWh | Nov 1987 | Dec 2025 | Water |
| Lawrence Hydroelectric Associates | Central Rivers Power US, LLC | Lawrence, MA | ISO New England (ISNE) | 58.9 GWh | Jun 1981 | Dec 2025 | Water |
| Lachute Hydro Lower | Central Rivers Power US, LLC | Ticonderoga, NY | New York Independent System Operator (NYIS) | 8.1 GWh | Nov 1987 | Dec 2025 | Water |
| Black River Hydro Associates | Central Rivers Power US, LLC | Port Layden, NY | New York Independent System Operator (NYIS) | 16.5 GWh | Dec 1983 | Dec 2025 | Water |
| Lower Saranac Hydroelectric Facility | Central Rivers Power US, LLC | Plattsburgh, NY | New York Independent System Operator (NYIS) | 18.7 GWh | Sep 1990 | Dec 2025 | Water |
| Pelzer Lower | Central Rivers Power US, LLC | Williamston, SC | Duke Energy Carolinas (DUK) | 3.8 GWh | Nov 1989 | Dec 2025 | Water |
| Pelzer Upper | Central Rivers Power US, LLC | Petzer, SC | Duke Energy Carolinas (DUK) | 3.8 GWh | Nov 1989 | Dec 2025 | Water |
| Piedmont Hydro Power Project | Central Rivers Power US, LLC | Piedmont, SC | Duke Energy Carolinas (DUK) | 4.8 GWh | Apr 1989 | Dec 2025 | Water |
| Sheldon Springs Hydroelectric | Central Rivers Power US, LLC | Sheldon Springs, VT | ISO New England (ISNE) | 52.5 GWh | Jun 1988 | Dec 2025 | Water |
| Pyrites Plant | Central Rivers Power US, LLC | Pyrites, NY | New York Independent System Operator (NYIS) | 24.9 GWh | Dec 1948 | Dec 2025 | Water |
| Dexter Plant | Central Rivers Power US, LLC | Dexter, NY | New York Independent System Operator (NYIS) | 6.9 GWh | Dec 1930 | Dec 2025 | Water |
| Victory Mills | Central Rivers Power US, LLC | Victory Mills, NY | New York Independent System Operator (NYIS) | 2.7 GWh | Nov 1986 | Dec 2025 | Water |
| Gauley River Power Partners | Central Rivers Power WV, LLC | Summersville, WV | PJM Interconnection, LLC (PJM) | 149.1 GWh | Jun 2001 | Dec 2025 | Water |
| Jordanelle Dam Hydroelectric Project | Central Utah Water Conservancy District | Heber, UT | PacifiCorp East (PACE) | 49.3 GWh | Jun 2008 | Dec 2025 | Water |
| Century Oak Wind Project, LLC | Century Oak Wind Project, LLC | Cisco, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 559.3 GWh | Jun 2024 | Aug 2026 | Wind |
| Colorado Bend Energy Center | CER Colorado Bend Energy Partners LP | Wharton, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 1.9 TWh | Apr 2002 | Aug 2026 | Natural Gas |
| Hillabee Energy Center | CER Generation LLC | Alexander City, AL | Southern Company Services, Inc. - Trans (SOCO) | 2.8 TWh | May 2010 | Aug 2026 | Natural Gas |
| Cereal City Solar, LLC | Cereal City Solar, LLC | Battle Creek, MI | Midcontinent Independent System Operator, Inc. (MISO) | 197.8 GWh | Nov 2023 | Aug 2026 | Solar |
| Cerro Gordo Wind Farm | Cerro Gordo Wind Farm | Union, IA | Midcontinent Independent System Operator, Inc. (MISO) | 170.8 GWh | Jul 2020 | Aug 2026 | Wind |
| CES Agawam Tuckahoe Solar Hybrid | CES Agawam Tuckahoe Solar LLC | Agawam, MA | ISO New England (ISNE) | 6.7 GWh | Nov 2021 | Dec 2025 | Solar |
| Conflitti Solar | CES Electron Farm One, LLC | Firebaugh, CA | California Independent System Operator (CISO) | 100.0 MWh | - | Dec 2025 | Solar |
| CF Industries Yazoo City Complex | CF Industries Nitrogen LLC | Yazoo City, MS | Midcontinent Independent System Operator, Inc. (MISO) | 81.8 GWh | Jun 1984 | Aug 2026 | Natural Gas |
| Jersey Gardens Phase 2 | CF Jersey Gardens Owner Two LLC | Elizabeth, NJ | PJM Interconnection, LLC (PJM) | 2.8 GWh | Jan 2012 | Dec 2025 | Solar |
| CG Windfarm LLC | CG Windfarm LLC | Woodstock, MN | Midcontinent Independent System Operator, Inc. (MISO) | 144.0 MWh | Nov 2003 | Dec 2024 | Wind |
| Synergy Biogas | CH4 Biogas LLC | Wyoming, NY | New York Independent System Operator (NYIS) | 3.1 GWh | Nov 2011 | Dec 2025 | Other Biomass Gas |
| Las Positas College | Chabot Las Positas Community College District | Livermore, CA | California Independent System Operator (CISO) | 1.7 GWh | Jul 2018 | Dec 2025 | Solar |
| Chaffey College Rancho Cucamonga Campus | Chaffey Community College District | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 6.9 GWh | Jan 2017 | Dec 2025 | Solar |
| Chalk Point Power | Chalk Point Power, LLC | Aquasco, MD | PJM Interconnection, LLC (PJM) | 2.9 TWh | Jul 1964 | Aug 2026 | Natural Gas : 98.4% Distillate Fuel Oil : 1.6% |
| Chalmette Refining LLC | Chalmette Refining LLC | Chalmette, LA | Midcontinent Independent System Operator, Inc. (MISO) | 5.9 GWh | Feb 1990 | Dec 2025 | Other Fuel |
| Chambersburg | Chambersburg Energy, LLC | Chambersburg, PA | PJM Interconnection, LLC (PJM) | 244.4 GWh | Oct 2001 | Dec 2025 | Natural Gas |
| Channel Energy Center LLC | Channel Energy Center LLC | Pasadena, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 4.3 TWh | Jun 2001 | Aug 2026 | Natural Gas |
| OR - Chapman Creek - Greenkey CSG | Chapman Creek Solar, LLC | Cave Junction, OR | PacifiCorp West (PACW) | 4.7 GWh | Apr 2025 | Dec 2025 | Solar |
| Chapman Ranch Wind I | Chapman Ranch Wind LLC | Corpus Christi, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 544.3 GWh | Sep 2017 | Dec 2025 | Wind |
| Charlton Solar I CSG | Charlton Solar I, LLC | Charlton, MA | ISO New England (ISNE) | 5.3 GWh | Nov 2014 | Dec 2025 | Solar |
| Chattanooga Metropolitan Airport Solar | Chattanooga Metropolitan Airport | Chattanooga, TN | Tennessee Valley Authority (TVA) | 2.6 GWh | Nov 2011 | Dec 2025 | Solar |
| Chautauqua LFGTE Facility | Chautauqua Green Energy, LLC | Jamestown, NY | New York Independent System Operator (NYIS) | 2.9 GWh | Jan 2010 | Dec 2025 | Landfill Gas |
| Chaves County Solar II | Chaves County Solar II, LLC | Roswell, NM | Southwest Power Pool (SWPP) | 69.2 GWh | Mar 2023 | Aug 2026 | Solar |
| Chaves Solar, LLC | Chaves Solar LLC | Roswell, NM | Southwest Power Pool (SWPP) | 143.9 GWh | Sep 2016 | Aug 2026 | Solar |
| Cherokee County Cogen | Cherokee County Cogen Partners LLC | Gaffney, SC | South Carolina Public Service Authority (SC) | 644.3 GWh | Feb 1998 | Dec 2025 | Natural Gas |
| Cherry Valley PV I | Cherry Valley PV I, LLC | Cherry Valley, AR | Midcontinent Independent System Operator, Inc. (MISO) | 165.5 GWh | - | Aug 2026 | Solar |
| Cherrywood Solar I | Cherrywood Solar, LLC | Greensboro, MD | PJM Interconnection, LLC (PJM) | 128.6 GWh | - | Aug 2026 | Solar |
| Chesapeake Solar Project | Chesapeake Solar Project, LLC | Chesapeake, VA | PJM Interconnection, LLC (PJM) | 241.2 GWh | Nov 2023 | Aug 2026 | Solar |
| Chester Woods Point Solar, LLC CSG | Chester Woods Point Solar, LLC | Chester, MD | PJM Interconnection, LLC (PJM) | 4.1 GWh | May 2019 | Dec 2025 | Solar |
| Chestnut | Chestnut Westside LLC | Lemoore, CA | California Independent System Operator (CISO) | 358.1 GWh | Nov 2023 | Aug 2026 | Solar |
| Oak Point Cogen | Chevron Oronite Co LLC | Belle Chasse, LA | Midcontinent Independent System Operator, Inc. (MISO) | 97.8 GWh | Sep 1999 | Dec 2025 | Natural Gas |
| Richmond Cogen | Chevron Products Company-Richmond | Richmond, CA | California Independent System Operator (CISO) | 965.4 GWh | Jul 1992 | Aug 2026 | Natural Gas : 97.4% Other Gas : 2.6% |
| Questa Solar Facility | Chevron Technology Ventures | Questa, NM | Public Service Company of New Mexico (PNM) | 1.3 GWh | Dec 2010 | Dec 2025 | Solar |
| Coalinga 25D Cogen | Chevron USA Inc | Coalinga, CA | California Independent System Operator (CISO) | 38.9 GWh | Sep 1986 | Dec 2025 | Natural Gas |
| McKittrick Cogen | Chevron USA Inc | McKittrick, CA | California Independent System Operator (CISO) | 61.2 GWh | May 2012 | Dec 2025 | Natural Gas |
| Cymric 31X Cogen | Chevron USA Inc | McKittrick, CA | California Independent System Operator (CISO) | 17.5 GWh | Sep 1988 | Dec 2025 | Natural Gas |
| Cymric 6Z Cogen | Chevron USA Inc | McKittrick, CA | California Independent System Operator (CISO) | 26.6 GWh | Jun 1986 | Dec 2025 | Natural Gas |
| Taft 26C Cogen | Chevron USA Inc | Taft, CA | California Independent System Operator (CISO) | 46.9 GWh | Jun 1982 | Aug 2026 | Natural Gas |
| Cymric 36W Cogen | Chevron USA Inc | McKittrick, CA | California Independent System Operator (CISO) | 53.4 GWh | Sep 1982 | Dec 2025 | Natural Gas |
| Kern River Eastridge Cogen | Chevron USA Inc | Bakersfield, CA | California Independent System Operator (CISO) | 203.8 GWh | May 1988 | Aug 2026 | Natural Gas |
| Southeast Kern River Cogen | Chevron USA Inc | Bakersfield, CA | California Independent System Operator (CISO) | 49.1 GWh | Jan 1989 | Aug 2026 | Natural Gas |
| El Segundo Cogen | Chevron USA Inc-El Segundo | El Segundo, CA | California Independent System Operator (CISO) | 1.2 TWh | Nov 1987 | Aug 2026 | Natural Gas : 99.9% |
| West Village Solar - Array 1Community So | CHF-Davis I, LLC | Davis, CA | California Independent System Operator (CISO) | 746.0 MWh | Apr 2022 | Dec 2025 | Solar |
| West Village Solar - Array 2 Community S | CHF-Davis I, LLC | Davis, CA | California Independent System Operator (CISO) | 619.0 MWh | Apr 2022 | Dec 2025 | Solar |
| Fenner Wind | CHI Energy Inc | Cazenovia, NY | New York Independent System Operator (NYIS) | 75.8 GWh | Sep 2001 | Dec 2025 | Wind |
| NV - Nokomis - CHI | CHI NV Solar LLC | Mesquite, NV | Nevada Power Company (NEVP) | 2.9 GWh | May 2025 | Dec 2025 | Solar |
| Jessica Mills LLC | CHI Operations Inc | Hendricks, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 GWh | Jan 2001 | Dec 2024 | Wind |
| Julia Hills LLC | CHI Operations Inc | Hendricks, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 GWh | Jan 2001 | Dec 2024 | Wind |
| Sun River LLC | CHI Operations Inc | Hendricks, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 GWh | Jan 2001 | Dec 2024 | Wind |
| Twin Lake Hills LLC | CHI Operations Inc | Lake Benton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.8 GWh | Nov 2000 | Dec 2024 | Wind |
| Spartan Hills LLC | CHI Operations Inc | Lake Benton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.8 GWh | Dec 2000 | Dec 2024 | Wind |
| Soliloquoy Ridge LLC | CHI Operations Inc | Lake Benton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.8 GWh | Dec 2000 | Dec 2024 | Wind |
| Winters Spawn LLC | CHI Operations Inc | Lake Benton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.8 GWh | Dec 2000 | Dec 2024 | Wind |
| Jack River LLC | CHI Operations Inc | Hendricks, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 GWh | Jan 2001 | Dec 2024 | Wind |
| Tsar Nicholas LLC | CHI Operations Inc | Hendricks, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 GWh | Jan 2001 | Dec 2024 | Wind |
| Autumn Hills LLC | CHI Operations Inc | Hendricks, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 GWh | Jan 2001 | Dec 2024 | Wind |
| Ruthton Ridge LLC | CHI Operations Inc | Lake Benton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.8 GWh | Dec 2000 | Dec 2024 | Wind |
| Agassiz Beach LLC | CHI Operations Inc | Averill, MN | Midcontinent Independent System Operator, Inc. (MISO) | 3.3 GWh | Jan 2001 | Dec 2025 | Wind |
| Hadley Ridge LLC | CHI Operations Inc | Lake Benton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.8 GWh | Nov 2000 | Dec 2024 | Wind |
| Florence Hills LLC | CHI Operations Inc | Lake Benton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.8 GWh | Dec 2000 | Dec 2024 | Wind |
| Hope Creek LLC | CHI Operations Inc | Lake Benton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.8 GWh | Dec 2000 | Dec 2024 | Wind |
| Chickadee G-3 | Chickadee 3-G Purchaser LLC | Beaumont, TX | Midcontinent Independent System Operator, Inc. (MISO) | 205.1 GWh | Feb 1987 | Aug 2026 | Natural Gas : 98.5% Waste/Other Oil : 1.5% |
| Chicot Solar | Chicot Solar, LLC | Lake Village, AR | Midcontinent Independent System Operator, Inc. (MISO) | 210.6 GWh | Aug 2020 | Aug 2026 | Solar |
| Chillicothe | Chillicothe Municipal Utils (MO) | Chillicothe, MO | Southwest Power Pool (SWPP) | 2.9 GWh | May 1986 | Dec 2025 | Natural Gas : 92.5% Distillate Fuel Oil : 7.5% |
| Chillingham Solar | Chillingham Solar LLC | Rogers, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 880.3 GWh | - | Aug 2026 | Solar |
| Chisago Community Solar | Chisago Community Solar | Taylor Falls, MN | Midcontinent Independent System Operator, Inc. (MISO) | 6.1 GWh | Nov 2016 | Dec 2025 | Solar |
Summary of Power Plants By State
Figures are based on August 2026 generation numbers.| State | Rank | Active Plants | Aug 2026 Generation |
|---|---|---|---|
| Alabama | # 9 | 80 | 13,897.78 GWh |
| Alaska | # 48 | 146 | 672.99 GWh |
| Arizona | # 10 | 203 | 13,589.64 GWh |
| Arkansas | # 23 | 122 | 7,027.75 GWh |
| California | # 3 | 1,840 | 24,164.86 GWh |
| Colorado | # 30 | 321 | 5,322.30 GWh |
| Connecticut | # 34 | 180 | 4,400.98 GWh |
| Delaware | # 49 | 35 | 555.40 GWh |
| District of Columbia | # 51 | 19 | 21.71 GWh |
| Florida | # 2 | 345 | 28,185.93 GWh |
| Georgia | # 6 | 261 | 15,282.60 GWh |
| Hawaii | # 47 | 73 | 863.62 GWh |
| Idaho | # 43 | 152 | 1,754.56 GWh |
| Illinois | # 5 | 556 | 18,683.36 GWh |
| Indiana | # 17 | 226 | 9,970.06 GWh |
| Iowa | # 27 | 301 | 5,759.64 GWh |
| Kansas | # 26 | 191 | 6,368.18 GWh |
| Kentucky | # 21 | 63 | 7,221.26 GWh |
| Louisiana | # 14 | 93 | 10,670.45 GWh |
| Maine | # 45 | 250 | 1,285.31 GWh |
| Maryland | # 37 | 236 | 3,745.22 GWh |
| Massachusetts | # 41 | 679 | 1,958.59 GWh |
| Michigan | # 12 | 288 | 12,064.19 GWh |
| Minnesota | # 32 | 794 | 5,047.38 GWh |
| Mississippi | # 19 | 62 | 8,358.70 GWh |
| Missouri | # 22 | 134 | 7,125.71 GWh |
| State | Rank | Active Plants | Aug 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 72 | 2,266.60 GWh |
| Nebraska | # 39 | 132 | 3,448.00 GWh |
| Nevada | # 29 | 117 | 5,523.31 GWh |
| New Hampshire | # 42 | 60 | 1,901.10 GWh |
| New Jersey | # 25 | 409 | 6,440.88 GWh |
| New Mexico | # 33 | 166 | 4,571.47 GWh |
| New York | # 11 | 1,087 | 13,130.21 GWh |
| North Carolina | # 8 | 921 | 14,263.55 GWh |
| North Dakota | # 38 | 62 | 3,579.89 GWh |
| Ohio | # 7 | 216 | 14,448.49 GWh |
| Oklahoma | # 13 | 153 | 10,965.38 GWh |
| Oregon | # 31 | 292 | 5,257.14 GWh |
| Pennsylvania | # 4 | 270 | 23,772.83 GWh |
| Rhode Island | # 46 | 108 | 924.31 GWh |
| South Carolina | # 16 | 214 | 9,989.71 GWh |
| South Dakota | # 44 | 53 | 1,486.65 GWh |
| Tennessee | # 18 | 101 | 8,430.26 GWh |
| Texas | # 1 | 1,069 | 65,726.98 GWh |
| Utah | # 36 | 131 | 4,074.82 GWh |
| Vermont | # 50 | 118 | 175.56 GWh |
| Virginia | # 15 | 255 | 10,241.54 GWh |
| Washington | # 20 | 137 | 8,189.60 GWh |
| West Virginia | # 28 | 41 | 5,593.74 GWh |
| Wisconsin | # 24 | 272 | 6,683.19 GWh |
| Wyoming | # 35 | 71 | 4,322.19 GWh |