HO Clarke Generating
12584 Hiram Clarke Road, Houston, TX 77045Plant Summary Information
HO Clarke Generating is ranked #111 out of 314 natural gas power plants in Texas in terms of total annual net electricity generation.
HO Clarke Generating is comprised of 8 generators and generated 102.3 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | HO Clarke Generating |
|---|---|
| Utility Name | ProEnergy Services |
| Location | Harris County, TX |
| Initial Operation Date | March 2021 |
| Last Update | Dec 2025 |
| Annual Generation | 335.5 GWh |
| Annual Consumption | 3.8 M MMBtu |
| Ranked #1,840 out of 12,613 Power Plants Nationwide | |
| Ranked #626 out of 2,246 Natural Gas Power Plants Nationwide | |
| Ranked #361 out of 816 Texas Power Plants | |
| Ranked #111 out of 314 Texas Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
Map of HO Clarke Generating
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for HO Clarke Generating.
Monthly Net Generation for HO Clarke Generating
Monthly Plant Fuel Consumption for HO Clarke Generating
HO Clarke Generating Details
| Summary Information | |
|---|---|
| Plant Name | HO Clarke Generating (63335) |
| Plant Address | 12584 Hiram Clarke Road, Houston, TX 77045 |
| Utility | ProEnergy Services (63082) |
| Latitude, Longitude | 29.64536, -95.45169 |
| Generation Dates on File | Mar 2021 to Dec 2025 |
| Initial Operation Date | March 2021 |
| Annual Generation | 335.5 GWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | EG20-201-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | CenterPoint Energy (8901) TX |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name | KINDER MORGAN TEXAS PIPELINE LLC |
| Natural Gas Storage | No |
Generator CTG-7 Details Operating October 2021
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | HOCPRO01 |
| Nameplate Capacity | 60.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 44.5 MW |
| Winter Capacity | 49.8 MW |
| Minimum Load | 22.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | October 2021 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator CTG-8 Details Operating October 2021
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | HOCPRO01 |
| Nameplate Capacity | 60.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 44.5 MW |
| Winter Capacity | 49.8 MW |
| Minimum Load | 22.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | October 2021 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator CTG-1 Details Operating March 2021
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | HOCPRO01 |
| Nameplate Capacity | 60.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 44.5 MW |
| Winter Capacity | 49.8 MW |
| Minimum Load | 22.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | March 2021 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator CTG-2 Details Operating March 2021
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | HOCPRO01 |
| Nameplate Capacity | 60.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 44.5 MW |
| Winter Capacity | 49.8 MW |
| Minimum Load | 22.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | March 2021 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator CTG-3 Details Operating March 2021
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | HOCPRO01 |
| Nameplate Capacity | 60.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 44.5 MW |
| Winter Capacity | 49.8 MW |
| Minimum Load | 22.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | March 2021 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator CTG-4 Details Operating March 2021
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | HOCPRO01 |
| Nameplate Capacity | 60.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 44.5 MW |
| Winter Capacity | 49.8 MW |
| Minimum Load | 22.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | March 2021 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator CTG-5 Details Operating March 2021
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | HOCPRO01 |
| Nameplate Capacity | 60.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 44.5 MW |
| Winter Capacity | 49.8 MW |
| Minimum Load | 22.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | March 2021 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator CTG-6 Details Operating March 2021
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | HOCPRO01 |
| Nameplate Capacity | 60.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 44.5 MW |
| Winter Capacity | 49.8 MW |
| Minimum Load | 22.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | March 2021 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
HO Clarke Generating Plant Owners
| Owner Name | Address | Generator | Ownership |
|---|---|---|---|
| HO Clarke Generating, LLC | 8303 McHard Road, Houston, TX 77053 | Generator CTG-1 | 100.00% |
| HO Clarke Generating, LLC | 8303 McHard Road, Houston, TX 77053 | Generator CTG-2 | 100.00% |
| HO Clarke Generating, LLC | 8303 McHard Road, Houston, TX 77053 | Generator CTG-3 | 100.00% |
| HO Clarke Generating, LLC | 8303 McHard Road, Houston, TX 77053 | Generator CTG-4 | 100.00% |
| HO Clarke Generating, LLC | 8303 McHard Road, Houston, TX 77053 | Generator CTG-5 | 100.00% |
| HO Clarke Generating, LLC | 8303 McHard Road, Houston, TX 77053 | Generator CTG-6 | 100.00% |
| HO Clarke II, LLC | 8303 McHard Road, Houston, TX 77053 | Generator CTG-7 | 100.00% |
| HO Clarke II, LLC | 8303 McHard Road, Houston, TX 77053 | Generator CTG-8 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #616 | Hal C Weaver Power Plant | Austin, TX | 361.2 GWh |
| #617 | Saranac Facility | Plattsburgh, NY | 354.9 GWh |
| #618 | Wabash Valley Power IGCC | Terre Haute, IN | 354.1 GWh |
| #619 | Encogen | Bellingham, WA | 354.1 GWh |
| #620 | Mark One Power Station | Angleton, TX | 352.7 GWh |
| #621 | Turtle Creek | Springfield, NE | 380.0 GWh |
| #622 | Humboldt Bay | Eureka, CA | 347.8 GWh |
| #623 | RED-Rochester, LLC | Rochester, NY | 344.9 GWh |
| #624 | Henry County | New Castle, IN | 344.7 GWh |
| #625 | Tolk | Muleshoe, TX | 2.9 TWh |
| #627 | Plant 31 Paper Mill | West Monroe, LA | 523.0 GWh |
| #628 | Pearsall | Pearsall, TX | 329.9 GWh |
| #629 | Richland (OH) | Defiance, OH | 327.3 GWh |
| #630 | Geismar | Geismar, LA | 514.1 GWh |
| #631 | Knox Lee | Longview, TX | 321.3 GWh |
| #632 | Colbert | Tuscumbia, AL | 320.6 GWh |
| #633 | Riverside (MN) | Minneapolis, MN | 313.1 GWh |
| #634 | Woodsdale | Trenton, OH | 321.1 GWh |
| #635 | Waterford 1 & 2 | Killona, LA | 318.7 GWh |
| #636 | Blue Lake | Shakopee, MN | 317.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding HO Clarke Generating.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Friendswood Energy | Houston, TX | 65.7 GWh | 0.1 mi |
| HEB00063 | Pearland, TX | 306.0 MWh | 7 mi |
| HEB00109 | Katy, TX | 303.0 MWh | 11.1 mi |
| HEB00110 | Missouri City, TX | 179.0 MWh | 9.1 mi |
| HEB00760 | Manvel, TX | 115.0 MWh | 11.3 mi |
| HEB00779 | Houston, TX | 17.0 MWh | 6.4 mi |
| Houston Plant | Houston, TX | 52.7 GWh | 12 mi |
| Mckeever | Fresno, TX | 187.0 MWh | 9.6 mi |
| OTHERNFBWA | Houston, TX | 321.0 MWh | 10.9 mi |
| OTHERTraditionBuffalo | Houston, TX | 202.0 MWh | 3.1 mi |
| Rice University | Houston, TX | 17.7 GWh | 6.2 mi |
| Southwick | Houston, TX | 111.0 MWh | 6.2 mi |
| TECO CHP-1 | Houston, TX | 30.7 GWh | 5.1 mi |
| The Methodist Hospital, Gas Turbine | Houston, TX | 13.8 GWh | 5.4 mi |
| WAL2993 | Sugar Land, TX | 255.0 MWh | 11.8 mi |
| WAL3302 | Houston, TX | 259.0 MWh | 7 mi |
| WAL3572 | Pearland, TX | 163.0 MWh | 7.3 mi |
| WAL3584 | Houston, TX | 230.0 MWh | 5.5 mi |
| WAL5612 | Houston, TX | 230.0 MWh | 9.7 mi |
| WAL872 | Pearland, TX | 214.0 MWh | 11.2 mi |