HO Clarke Generating
12584 Hiram Clarke Road, Houston, TX 77045Plant Summary Information
HO Clarke Generating is ranked #112 out of 313 natural gas power plants in Texas in terms of total annual net electricity generation.
HO Clarke Generating is comprised of 8 generators and generated 84.4 GWh during the 3-month period between March 2026 to June 2026.
| Plant Name | HO Clarke Generating |
|---|---|
| Utility Name | City of San Antonio - (TX) |
| Location | Harris County, TX |
| Initial Operation Date | March 2021 |
| Last Update | Jun 2026 |
| Annual Generation | 337.8 GWh |
| Annual Consumption | 3.9 M MMBtu |
| Ranked #1,876 out of 13,094 Power Plants Nationwide | |
| Ranked #631 out of 2,208 Natural Gas Power Plants Nationwide | |
| Ranked #386 out of 858 Texas Power Plants | |
| Ranked #112 out of 313 Texas Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
| Previous Operator |
ProEnergy Services (2019 to 2024) City of San Antonio - (TX) (2025 to 2025) |
Map of HO Clarke Generating
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for HO Clarke Generating.
Monthly Net Generation for HO Clarke Generating
Monthly Plant Fuel Consumption for HO Clarke Generating
HO Clarke Generating Details
| Summary Information | |
|---|---|
| Plant Name | HO Clarke Generating (63335) |
| Plant Address | 12584 Hiram Clarke Road, Houston, TX 77045 |
| Utility | City of San Antonio - (TX) (16604) |
| Latitude, Longitude | 29.64536, -95.45169 |
| Generation Dates on File | Mar 2021 to Jun 2026 |
| Initial Operation Date | March 2021 |
| Annual Generation | 337.8 GWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | EG20-201-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | CenterPoint Energy (8901) TX |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name | KINDER MORGAN TEXAS PIPELINE LLC |
| Natural Gas Storage | No |
Generator CTG-7 Details Operating October 2021
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | HOCPRO01 |
| Nameplate Capacity | 60.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 44.5 MW |
| Winter Capacity | 49.8 MW |
| Minimum Load | 22.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | October 2021 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator CTG-8 Details Operating October 2021
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | HOCPRO01 |
| Nameplate Capacity | 60.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 44.5 MW |
| Winter Capacity | 49.8 MW |
| Minimum Load | 22.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | October 2021 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator CTG-1 Details Operating March 2021
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | HOCPRO01 |
| Nameplate Capacity | 60.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 44.5 MW |
| Winter Capacity | 49.8 MW |
| Minimum Load | 22.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | March 2021 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator CTG-2 Details Operating March 2021
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | HOCPRO01 |
| Nameplate Capacity | 60.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 44.5 MW |
| Winter Capacity | 49.8 MW |
| Minimum Load | 22.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | March 2021 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator CTG-3 Details Operating March 2021
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | HOCPRO01 |
| Nameplate Capacity | 60.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 44.5 MW |
| Winter Capacity | 49.8 MW |
| Minimum Load | 22.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | March 2021 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator CTG-4 Details Operating March 2021
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | HOCPRO01 |
| Nameplate Capacity | 60.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 44.5 MW |
| Winter Capacity | 49.8 MW |
| Minimum Load | 22.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | March 2021 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator CTG-5 Details Operating March 2021
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | HOCPRO01 |
| Nameplate Capacity | 60.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 44.5 MW |
| Winter Capacity | 49.8 MW |
| Minimum Load | 22.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | March 2021 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator CTG-6 Details Operating March 2021
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | HOCPRO01 |
| Nameplate Capacity | 60.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 44.5 MW |
| Winter Capacity | 49.8 MW |
| Minimum Load | 22.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | March 2021 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
HO Clarke Generating Plant Owners
| Owner Name | Address | Generator | Ownership |
|---|---|---|---|
| HO Clarke Generating, LLC | 8303 McHard Road, Houston, TX 77053 | Generator CTG-1 | 100.00% |
| HO Clarke Generating, LLC | 8303 McHard Road, Houston, TX 77053 | Generator CTG-2 | 100.00% |
| HO Clarke Generating, LLC | 8303 McHard Road, Houston, TX 77053 | Generator CTG-3 | 100.00% |
| HO Clarke Generating, LLC | 8303 McHard Road, Houston, TX 77053 | Generator CTG-4 | 100.00% |
| HO Clarke Generating, LLC | 8303 McHard Road, Houston, TX 77053 | Generator CTG-5 | 100.00% |
| HO Clarke Generating, LLC | 8303 McHard Road, Houston, TX 77053 | Generator CTG-6 | 100.00% |
| HO Clarke II, LLC | 8303 McHard Road, Houston, TX 77053 | Generator CTG-7 | 100.00% |
| HO Clarke II, LLC | 8303 McHard Road, Houston, TX 77053 | Generator CTG-8 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #621 | Primient Loudon Plant | Loudon, TN | 366.4 GWh |
| #622 | Valley (WI) | Milwaukee, WI | 365.2 GWh |
| #623 | Whitewater Generating Station | Whitewater, WI | 361.2 GWh |
| #624 | Kimberly Clark Mobile - CHP Plant | Mobile, AL | 357.6 GWh |
| #625 | Hal C Weaver Power Plant | Austin, TX | 357.4 GWh |
| #626 | Beatrice | Beatrice, NE | 356.4 GWh |
| #627 | West Valley Generation Project | West Valley City, UT | 354.0 GWh |
| #628 | Walton County Energy Facility | Monroe, GA | 353.9 GWh |
| #629 | Selkirk Cogen | Selkirk, NY | 346.4 GWh |
| #630 | RED-Rochester, LLC | Rochester, NY | 344.9 GWh |
| #632 | Port Jefferson | Port Jefferson, NY | 413.8 GWh |
| #633 | Lake Catherine | Jones Mill, AR | 336.2 GWh |
| #634 | Bluffview | Farmington, NM | 334.9 GWh |
| #635 | Roseville Energy Park | Roseville, CA | 329.9 GWh |
| #636 | Big Sandy Peaker Plant | Kenona, WV | 329.8 GWh |
| #637 | Richard M Flynn | Holtsville, NY | 346.5 GWh |
| #638 | Plant 31 Paper Mill | West Monroe, LA | 514.8 GWh |
| #639 | Robert P Mone Plant | Convoy, OH | 327.9 GWh |
| #640 | Knox Lee | Longview, TX | 321.3 GWh |
| #641 | Paris Energy Center | Paris, TX | 320.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding HO Clarke Generating.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Friendswood Energy | Houston, TX | 45.2 GWh | 0.1 mi |
| FTBLID2 | Sugarland, TX | 882.0 MWh | 12.1 mi |
| HEB00063 | Pearland, TX | 308.0 MWh | 7 mi |
| HEB00109 | Katy, TX | 241.0 MWh | 11.1 mi |
| HEB00110 | Missouri City, TX | 155.0 MWh | 9.1 mi |
| HEB00760 | Manvel, TX | 205.0 MWh | 11.3 mi |
| HEB00779 | Houston, TX | 152.0 MWh | 6.4 mi |
| Houston Plant | Houston, TX | 52.5 GWh | 12 mi |
| Mckeever | Fresno, TX | 80.0 MWh | 9.6 mi |
| OTHERNFBWA | Houston, TX | 255.0 MWh | 10.9 mi |
| OTHERTraditionBuffalo | Houston, TX | 79.0 MWh | 3.1 mi |
| Rice University | Houston, TX | 19.0 GWh | 6.2 mi |
| Southwick | Houston, TX | 65.0 MWh | 6.2 mi |
| TECO CHP-1 | Houston, TX | 63.1 GWh | 5.1 mi |
| WAL2993 | Sugar Land, TX | 361.0 MWh | 11.8 mi |
| WAL3302 | Houston, TX | 173.0 MWh | 7 mi |
| WAL3572 | Pearland, TX | 74.0 MWh | 7.3 mi |
| WAL3584 | Houston, TX | 279.0 MWh | 5.5 mi |
| WAL5612 | Houston, TX | 330.0 MWh | 9.7 mi |
| WAL872 | Pearland, TX | 308.0 MWh | 11.2 mi |