| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| OYA Robinson Road | OYA Robinson Road, LLC | Orleans, NY | New York Independent System Operator (NYIS) | 9.7 GWh | May 2022 | Dec 2024 | Solar |
| OYA State Route 122 | OYA State Route 122, LLC | Constable, NY | New York Independent System Operator (NYIS) | 6.9 GWh | Nov 2021 | Dec 2024 | Solar |
| Allie L.L.C. (CSG) | Allie L.L.C. | Renville, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Jul 2022 | Dec 2024 | Solar |
| Lincoln WWTF Hybrid | Lincoln Solar Star, LLC | Lincoln, CA | California Independent System Operator (CISO) | 6.4 GWh | Jul 2021 | Dec 2024 | Solar |
| Bedford Solar (Dominion) | Dominion Renewable Energy | Chesapeake, VA | PJM Interconnection, LLC (PJM) | 120.8 GWh | Oct 2021 | Mar 2026 | Solar |
| Powells Creek Solar - Hybrid | Powells Creek Farm Solar, LLC | Alton, VA | PJM Interconnection, LLC (PJM) | 150.3 GWh | Jul 2023 | Mar 2026 | Solar |
| Sunnybrook Solar Project - Hybrid | Sunnybrook Farm Solar, LLC | Scottsburg, VA | PJM Interconnection, LLC (PJM) | 88.1 GWh | Nov 2022 | Mar 2026 | Solar |
| Horizon Solar | Leeward Asset Management, LLC | Pearsall, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 474.6 GWh | Nov 2023 | Mar 2026 | Solar |
| Millersport GM 1 | Greenbacker Renewable Energy Corporation | Amherst, NY | New York Independent System Operator (NYIS) | 6.8 GWh | Feb 2023 | Dec 2024 | Solar |
| Caden Energix Wytheville LLC | Caden Energix Wytheville LLC | Wytheville, VA | PJM Interconnection, LLC (PJM) | 38.5 GWh | May 2022 | Dec 2024 | Solar |
| Gas City 2 | Indiana Municipal Power Agency | Gas City, IN | PJM Interconnection, LLC (PJM) | 3.3 GWh | Dec 2022 | Dec 2024 | Solar |
| Springfield Solar | Dominion Renewable Energy | Montross, VA | PJM Interconnection, LLC (PJM) | 2.1 GWh | Jun 2024 | Dec 2024 | Solar |
| Maplewood Solar | Dominion Renewable Energy | Climax, VA | PJM Interconnection, LLC (PJM) | 188.3 GWh | Nov 2022 | Mar 2026 | Solar |
| Rochambeau Solar | Dominion Renewable Energy | Williamsburg, VA | PJM Interconnection, LLC (PJM) | 37.6 GWh | Nov 2021 | Dec 2024 | Solar |
| Fort Powhatan Solar | Dominion Renewable Energy | Disputanta, VA | PJM Interconnection, LLC (PJM) | 303.0 GWh | Dec 2021 | Mar 2026 | Solar |
| South Goshen Community Solar | AES Distributed Energy | Goshen, NY | New York Independent System Operator (NYIS) | 6.1 GWh | Aug 2021 | Dec 2024 | Solar |
| Hollins Ferry CSG | ICFTS MD Solar, LLC | Halethorpe, MD | PJM Interconnection, LLC (PJM) | 2.4 GWh | Nov 2021 | Dec 2024 | Solar |
| Mount Laurel Solar | NJR Clean Energy Ventures Corporation | Mt. Laurel, NJ | PJM Interconnection, LLC (PJM) | 3.7 GWh | Nov 2020 | Dec 2024 | Solar |
| 8500 Balboa PV, LLC | 8500 Balboa PV, LLC | Northridge, CA | Los Angeles Department of Water and Power (LDWP) | 3.6 GWh | Jan 2022 | Dec 2024 | Solar |
| 20333 Normandie PV, LLC | TRITEC Americas | Torrance, CA | Los Angeles Department of Water and Power (LDWP) | 5.3 GWh | Nov 2021 | Dec 2024 | Solar |
| CPV Maple Hill Solar | CPV Maple Hill Solar, LLC | Portage, PA | PJM Interconnection, LLC (PJM) | 157.2 GWh | Oct 2023 | Mar 2026 | Solar |
| Shakes Solar | Cypress Creek Renewables | Carrizo Springs, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 391.4 GWh | May 2022 | Mar 2026 | Solar |
| Platteview Solar LLC | AES Distributed Energy | Ashland, NE | Southwest Power Pool (SWPP) | 135.7 GWh | Apr 2024 | Mar 2026 | Solar |
| Maybrook Solar, LLC (CSG) | NJR Clean Energy Ventures Corporation | Campbell Hall, NY | New York Independent System Operator (NYIS) | 9.0 GWh | Jan 2023 | Dec 2024 | Solar |
| MD - CS - Potomac Edison Co - GA25 TPE ( | Distributed Solar Development, LLC | Accident, MD | PJM Interconnection, LLC (PJM) | 3.6 GWh | May 2022 | Dec 2024 | Solar |
| CA - DGS RFP - RJ Donovan State Prison | Forefront Power, LLC | San Diego, CA | California Independent System Operator (CISO) | 5.1 GWh | Dec 2023 | Dec 2024 | Solar |
| 580 River Solar | NuGen Capital Management | Winchendon, MA | ISO New England (ISNE) | 4.7 GWh | Aug 2018 | Dec 2024 | Solar |
| Bremen | Indiana Municipal Power Agency | Bremen, IN | Midcontinent Independent System Operator, Inc. (MISO) | 13.4 GWh | Oct 2022 | Dec 2024 | Solar |
| Shamrock Solar LLC | Greenbacker Renewable Energy Corporation | Black River Falls, WI | Midcontinent Independent System Operator, Inc. (MISO) | 5.3 GWh | Nov 2021 | Dec 2024 | Solar |
| Stromland Solar | Greenbacker Renewable Energy Corporation | Cochrane, WI | Midcontinent Independent System Operator, Inc. (MISO) | 6.0 GWh | Nov 2021 | Dec 2024 | Solar |
| IGS KSBD | Greenbacker Renewable Energy Corporation | Highland, CA | California Independent System Operator (CISO) | 9.0 GWh | Feb 2022 | Dec 2024 | Solar |
| 115 G Fisher | Greenbacker Renewable Energy Corporation | Middleborough, MA | ISO New England (ISNE) | 1.5 GWh | Sep 2015 | Dec 2024 | Solar |
| 154 D Fisher | Greenbacker Renewable Energy Corporation | Middleborough, MA | ISO New England (ISNE) | 1.5 GWh | Nov 2015 | Dec 2024 | Solar |
| Jackson Legler Solar 1 LLC | Greenbacker Renewable Energy Corporation | Jackson Township, NJ | PJM Interconnection, LLC (PJM) | 5.1 GWh | Nov 2021 | Dec 2024 | Solar |
| Mt Arlington Solar 1 LLC | Greenbacker Renewable Energy Corporation | Mt Arlington, NJ | PJM Interconnection, LLC (PJM) | 2.8 GWh | Nov 2021 | Dec 2024 | Solar |
| Jicarilla Solar 2 | Repsol Renewables NA | Dulce, NM | Public Service Company of New Mexico (PNM) | 131.2 GWh | Mar 2022 | Mar 2026 | Solar |
| Pitkin County Solar | Coolangatta Solar LLC | Aspen, CO | Western Area Power Administration - Rocky Mountain Region (WACM) | 9.3 GWh | Sep 2021 | Dec 2024 | Solar |
| CA-DGS-California Correctional Inst | Forefront Power, LLC | Tehachapi, CA | California Independent System Operator (CISO) | 7.3 GWh | Mar 2024 | Dec 2024 | Solar |
| Phobos Solar, LLC | Phobos Solar, LLC | Middlesex, NC | Duke Energy Progress East (CPLE) | 167.7 GWh | Dec 2022 | Mar 2026 | Solar |
| Cabin Creek Solar, LLC | Cabin Creek Solar, LLC | Biscoe, NC | Duke Energy Progress East (CPLE) | 159.6 GWh | Dec 2022 | Mar 2026 | Solar |
| North Haven Solar One | North Haven Solar One, LLC | North Haven, CT | ISO New England (ISNE) | 2.5 GWh | Feb 2024 | Dec 2024 | Solar |
| Ridgeback | Ridgeback Solar, LLC | Liberty, NC | Duke Energy Progress East (CPLE) | 3.9 GWh | Nov 2021 | Dec 2024 | Solar |
| Thunderhead | Thunderhead Solar, LLC | Asheboro, NC | Duke Energy Progress East (CPLE) | 3.2 GWh | Nov 2021 | Dec 2024 | Solar |
| River Road | Norridgewock River Road Solar, LLC | Norridgewock, ME | ISO New England (ISNE) | 8.2 GWh | Feb 2022 | Dec 2024 | Solar |
| 196 Tremont St(CSG) | 196TRE WHAM8 Solar, LLC | Carver, MA | ISO New England (ISNE) | 4.2 GWh | Oct 2021 | Dec 2024 | Solar |
| NY8 - Grissom Solar | MN8 Energy LLC | Mohawk, NY | New York Independent System Operator (NYIS) | 24.4 GWh | Feb 2023 | Dec 2024 | Solar |
| NY8 - Branscomb Solar | MN8 Energy LLC | Schaghticoke, NY | New York Independent System Operator (NYIS) | 31.8 GWh | Nov 2021 | Dec 2024 | Solar |
| Fremont CA AutoFactory | Tesla Inc. | Fremont, CA | California Independent System Operator (CISO) | 480.0 MWh | Feb 2022 | Dec 2024 | Solar |
| Blythe Mesa Solar II | Blythe Mesa Solar II, LLC | Blythe, CA | California Independent System Operator (CISO) | 604.1 GWh | Nov 2022 | Mar 2026 | Solar |
| 71 Charlotte Furnace Rd Hybrid(CSG) | 71CFR WHAM8 Solar, LLC | Wareham, MA | ISO New England (ISNE) | 2.5 GWh | Nov 2021 | Dec 2024 | Solar |
| 77 Farm to Market Rd Hybrid(CSG) | 77F2M WHAM8 Solar, LLC | Wareham, MA | ISO New England (ISNE) | 9.4 GWh | Nov 2021 | Dec 2024 | Solar |
| 160 Tihonet Rd Hybrid(CSG) | 160TIH WHAM8 Solar, LLC | Wareham, MA | ISO New England (ISNE) | 9.8 GWh | Nov 2021 | Dec 2024 | Solar |
| 299 Farm to Market Rd Hybrid(CSG) | 299F2M WHAM8 Solar, LLC | Wareham, MA | ISO New England (ISNE) | 5.6 GWh | Nov 2021 | Dec 2024 | Solar |
| Waiawa Solar Power Hybrid | Waiawa Solar Power LLC | Waipahu, HI | (HECO) | 53.0 GWh | Dec 2022 | Mar 2026 | Solar |
| Hoot Lake Solar | Otter Tail Power Co | Fergus Falls, MN | Midcontinent Independent System Operator, Inc. (MISO) | 73.0 GWh | Jul 2023 | Mar 2026 | Solar |
| ASA DeKalb NY Solar III LLC | ASA DeKalb NY Solar III LLC | Richville, NY | New York Independent System Operator (NYIS) | 2.9 GWh | Mar 2024 | Dec 2024 | Solar |
| Walkerton | Indiana Municipal Power Agency | Walkerton, IN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Jun 2022 | Dec 2024 | Solar |
| Linton | Indiana Municipal Power Agency | Linton, IN | Midcontinent Independent System Operator, Inc. (MISO) | 10.5 GWh | Jun 2022 | Dec 2024 | Solar |
| NY8 - Janis Solar | MN8 Energy LLC | Willet, NY | New York Independent System Operator (NYIS) | 32.2 GWh | Feb 2023 | Dec 2024 | Solar |
| Berrenda Mesa Water District | The Greater Light USA LLC | Lost Hills, CA | California Independent System Operator (CISO) | 16.5 GWh | Jun 2023 | Dec 2024 | Solar |
| Everson Garden | Everson Garden LLC | Waseca, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Apr 2022 | Dec 2024 | Solar |
| Cottontail Solar 1 | Lightsource Renewable Energy Asset Management, LLC | York, PA | PJM Interconnection, LLC (PJM) | 13.4 GWh | May 2024 | Dec 2024 | Solar |
| Cottontail Solar 2 | Lightsource Renewable Energy Asset Management, LLC | West Manchester Towns, PA | PJM Interconnection, LLC (PJM) | 38.0 GWh | Jan 2024 | Dec 2024 | Solar |
| Cottontail Solar 4 | Lightsource Renewable Energy Asset Management, LLC | East Chillisquaque To, PA | PJM Interconnection, LLC (PJM) | 10.0 GWh | Aug 2024 | Dec 2024 | Solar |
| Cottontail Solar 5 | Lightsource Renewable Energy Asset Management, LLC | Penn Township, PA | PJM Interconnection, LLC (PJM) | 33.8 GWh | Jan 2024 | Dec 2024 | Solar |
| Cottontail Solar 6 | Lightsource Renewable Energy Asset Management, LLC | Penn Township, PA | PJM Interconnection, LLC (PJM) | 17.4 GWh | Mar 2024 | Dec 2024 | Solar |
| Cottontail Solar 8 | Lightsource Renewable Energy Asset Management, LLC | West Manchester Towns, PA | PJM Interconnection, LLC (PJM) | 34.5 GWh | Mar 2024 | Dec 2024 | Solar |
| Halifax Solar | NuGen Capital Management | Halifax, MA | ISO New England (ISNE) | 3.9 GWh | Jul 2015 | Dec 2024 | Solar |
| Donaghy-Stockton | Donaghy Sales Inc. | Stockton, CA | California Independent System Operator (CISO) | 2.2 GWh | Sep 2021 | Dec 2024 | Solar |
| ER Center Road Solar, LLC | Greenbacker Renewable Energy Corporation | Hardwick, VT | ISO New England (ISNE) | 3.2 GWh | Apr 2022 | Dec 2024 | Solar |
| Hudson County Solar | Greenbacker Renewable Energy Corporation | Kearny, NJ | PJM Interconnection, LLC (PJM) | 2.0 GWh | May 2022 | Dec 2024 | Solar |
| Van der Kooi Dairy Solar Array | Maas Energy Works | Riverdale, CA | California Independent System Operator (CISO) | 3.7 GWh | Mar 2021 | Dec 2024 | Solar |
| Hildreth Solar Power Plant | Duke Energy Florida, LLC | O'Brien, FL | Duke Energy Florida, Inc. (FPC) | 182.4 GWh | Feb 2023 | Mar 2026 | Solar |
| Bay Ranch Solar Power Plant | Duke Energy Florida, LLC | Panama City, FL | Duke Energy Florida, Inc. (FPC) | 182.7 GWh | Mar 2023 | Mar 2026 | Solar |
| High Springs Solar Power Plant | Duke Energy Florida, LLC | High Springs, FL | Duke Energy Florida, Inc. (FPC) | 164.7 GWh | Mar 2023 | Mar 2026 | Solar |
| Hardeetown Solar Power Plant | Duke Energy Florida, LLC | Chiefland, FL | Duke Energy Florida, Inc. (FPC) | 172.0 GWh | Mar 2023 | Mar 2026 | Solar |
| Cranberry Highway Solar LLC | Cranberry Highway Solar, LLC | Wareham, MA | ISO New England (ISNE) | 2.2 GWh | Feb 2021 | Dec 2024 | Solar |
| ENGIE 2019 ProjectCo-MA1, LLC | ENGIE 2019 ProjectCo MA-1, LLC | Agawam, MA | ISO New England (ISNE) | 6.4 GWh | Feb 2021 | Dec 2024 | Solar |
| WW-DC Solar 1, LLC | Greenbacker Renewable Energy Corporation | Washington, DC | PJM Interconnection, LLC (PJM) | 1.2 GWh | Apr 2022 | Dec 2024 | Solar |
| Ontario Sun | Azimuth 180 Solar Electric, LLC | Sandy Creek, NY | New York Independent System Operator (NYIS) | 3.6 GWh | Jan 2023 | Dec 2024 | Solar |
| Mtn. Solar 4 (CSG) | Standard Solar | Lakewood, CO | Public Service Company of Colorado (PSCO) | 3.6 GWh | Oct 2021 | Dec 2024 | Solar |
| CSP Los Angeles | Ecoplexus, Inc | Lancaster, CA | California Independent System Operator (CISO) | 5.6 GWh | Sep 2022 | Dec 2024 | Solar |
| Holliston LLC | Greenbacker Renewable Energy Corporation | Holliston, MA | ISO New England (ISNE) | 2.0 GWh | Sep 2020 | Dec 2024 | Solar |
| Broadway 3 - Tucson Phase I | MN8 Energy LLC | Tucson, AZ | Tucson Electric Power (TEPC) | 1.6 GWh | Feb 2011 | Dec 2024 | Solar |
| Broadway 3 - UC Merced 1 | MN8 Energy LLC | Merced, CA | California Independent System Operator (CISO) | 901.0 MWh | Sep 2009 | Dec 2024 | Solar |
| Broadway 3 - UCSB Lot 38 | MN8 Energy LLC | Santa Barbara, CA | California Independent System Operator (CISO) | 2.6 GWh | Nov 2016 | Dec 2024 | Solar |
| Broadway 4 - Target Shafter | MN8 Energy LLC | Shafter, CA | California Independent System Operator (CISO) | 3.0 GWh | Aug 2018 | Dec 2024 | Solar |
| Gaucho Solar | Gaucho Solar | Clinton, PA | PJM Interconnection, LLC (PJM) | 34.0 GWh | May 2023 | Dec 2024 | Solar |
| Nestlewood Solar | Nestlewood Solar | Hamersville, OH | PJM Interconnection, LLC (PJM) | 157.2 GWh | Nov 2023 | Mar 2026 | Solar |
| Woburn | Greenbacker Renewable Energy Corporation | Woburn, MA | ISO New England (ISNE) | 2.1 GWh | Nov 2020 | Dec 2024 | Solar |
| UMass PV Lot 22 | Consolidated Edison Development Inc. | Amherst, MA | ISO New England (ISNE) | 3.2 GWh | Aug 2022 | Dec 2024 | Solar |
| NY8 - Regan Solar | MN8 Energy LLC | Mohawk, NY | New York Independent System Operator (NYIS) | 31.3 GWh | Nov 2022 | Dec 2024 | Solar |
| NY8 - Puckett Solar | MN8 Energy LLC | Chenango Forks, NY | New York Independent System Operator (NYIS) | 31.5 GWh | Sep 2022 | Dec 2024 | Solar |
| AES Belleville Solar LLC | AES Distributed Energy | Belleville, IL | Midcontinent Independent System Operator, Inc. (MISO) | 12.9 GWh | Aug 2021 | Nov 2024 | Solar |
| City of Bowie | Tesla Inc. | Mitchellville, MD | PJM Interconnection, LLC (PJM) | 4.2 GWh | May 2021 | Dec 2024 | Solar |
| Fremont - Kato Rd | Tesla Inc. | Fremont, CA | California Independent System Operator (CISO) | 2.3 GWh | Nov 2016 | Dec 2024 | Solar |
| University of the Pacific | The Greater Light USA LLC | Stockton, CA | California Independent System Operator (CISO) | 6.5 GWh | Apr 2022 | Dec 2024 | Solar |
| ER Bone Hill Solar, LLC | Greenbacker Renewable Energy Corporation | Northfield, VT | ISO New England (ISNE) | 1.9 GWh | Aug 2022 | Dec 2024 | Solar |
| Bristol Landfill Solar | NuGen Capital Management | Bristol, RI | ISO New England (ISNE) | 7.9 GWh | Feb 2024 | Dec 2024 | Solar |
| Energix Aditya, LLC | Energix Aditya, LLC | Mineral, VA | PJM Interconnection, LLC (PJM) | 20.4 GWh | Jul 2023 | Dec 2024 | Solar |
Summary of Power Plants By State
Figures are based on March 2026 generation numbers.| State | Rank | Active Plants | Mar 2026 Generation |
|---|---|---|---|
| Alabama | # 10 | 76 | 10,194.39 GWh |
| Alaska | # 48 | 139 | 566.31 GWh |
| Arizona | # 15 | 183 | 8,256.99 GWh |
| Arkansas | # 25 | 114 | 4,973.03 GWh |
| California | # 5 | 1,656 | 15,197.83 GWh |
| Colorado | # 30 | 294 | 4,491.41 GWh |
| Connecticut | # 31 | 161 | 3,992.67 GWh |
| Delaware | # 49 | 33 | 248.78 GWh |
| District of Columbia | # 51 | 16 | 18.32 GWh |
| Florida | # 3 | 334 | 19,802.71 GWh |
| Georgia | # 8 | 247 | 10,697.11 GWh |
| Hawaii | # 46 | 69 | 784.18 GWh |
| Idaho | # 42 | 144 | 1,957.44 GWh |
| Illinois | # 4 | 379 | 15,489.73 GWh |
| Indiana | # 12 | 216 | 9,257.49 GWh |
| Iowa | # 21 | 289 | 6,478.67 GWh |
| Kansas | # 23 | 183 | 5,489.55 GWh |
| Kentucky | # 29 | 59 | 4,637.74 GWh |
| Louisiana | # 17 | 86 | 8,003.69 GWh |
| Maine | # 45 | 212 | 1,313.24 GWh |
| Maryland | # 39 | 202 | 2,834.84 GWh |
| Massachusetts | # 44 | 639 | 1,383.17 GWh |
| Michigan | # 13 | 268 | 8,564.76 GWh |
| Minnesota | # 26 | 760 | 4,875.53 GWh |
| Mississippi | # 24 | 55 | 5,467.46 GWh |
| Missouri | # 22 | 125 | 5,500.53 GWh |
| State | Rank | Active Plants | Mar 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 69 | 2,464.49 GWh |
| Nebraska | # 37 | 121 | 3,330.39 GWh |
| Nevada | # 35 | 114 | 3,487.65 GWh |
| New Hampshire | # 43 | 54 | 1,520.13 GWh |
| New Jersey | # 28 | 379 | 4,705.05 GWh |
| New Mexico | # 33 | 142 | 3,587.89 GWh |
| New York | # 9 | 935 | 10,247.40 GWh |
| North Carolina | # 11 | 896 | 9,821.46 GWh |
| North Dakota | # 32 | 59 | 3,854.12 GWh |
| Ohio | # 6 | 200 | 12,175.28 GWh |
| Oklahoma | # 19 | 142 | 7,305.54 GWh |
| Oregon | # 20 | 266 | 6,583.30 GWh |
| Pennsylvania | # 2 | 249 | 20,000.86 GWh |
| Rhode Island | # 47 | 100 | 610.71 GWh |
| South Carolina | # 14 | 204 | 8,273.25 GWh |
| South Dakota | # 41 | 52 | 2,184.62 GWh |
| Tennessee | # 18 | 88 | 7,335.80 GWh |
| Texas | # 1 | 961 | 46,858.09 GWh |
| Utah | # 38 | 125 | 3,184.50 GWh |
| Vermont | # 50 | 117 | 217.82 GWh |
| Virginia | # 16 | 233 | 8,059.42 GWh |
| Washington | # 7 | 131 | 10,773.76 GWh |
| West Virginia | # 34 | 40 | 3,543.98 GWh |
| Wisconsin | # 27 | 239 | 4,794.79 GWh |
| Wyoming | # 36 | 70 | 3,358.51 GWh |