Egypt Road Solar
5200 Egypt Road, Cambridge, MD 21613Plant Summary Information
Egypt Road Solar is ranked #27 out of 226 power plants in Maryland in terms of total annual net electricity generation.
Egypt Road Solar generated 32.9 GWh during the 3-month period between March 2026 to June 2026.
| Plant Name | Egypt Road Solar |
|---|---|
| Utility Name | Urban Grid Solar |
| Location | Dorchester County, MD |
| Initial Operation Date | December 2025 |
| Last Update | Jun 2026 |
| Annual Generation | 54.3 GWh |
| Annual Consumption | 185.1 k MMBtu |
| Ranked #4,126 out of 13,094 Power Plants Nationwide | |
| Ranked #1,108 out of 7,027 Solar Power Plants Nationwide | |
| Ranked #27 out of 226 Maryland Power Plants | |
| Ranked #5 out of 184 Maryland Solar Power Plants | |
| Fuel Types | Solar |
Map of Egypt Road Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Egypt Road Solar.
Monthly Net Generation for Egypt Road Solar
Monthly Plant Fuel Consumption for Egypt Road Solar
Egypt Road Solar Details
| Summary Information | |
|---|---|
| Plant Name | Egypt Road Solar (66840) |
| Plant Address | 5200 Egypt Road, Cambridge, MD 21613 |
| Utility | Urban Grid Solar (65777) |
| Latitude, Longitude | 38.53067, -76.10036 |
| Generation Dates on File | Dec 2025 to Jun 2026 |
| Initial Operation Date | December 2025 |
| Annual Generation | 54.3 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | RFC |
| Balancing Authority | PJM Interconnection, LLC (PJM) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Delmarva Power (5027) MD |
| Grid Voltage | 51.10 kV |
| Energy Storage | No |
Generator EGYR1 Details Operating December 2025
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | BAYLY |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | BAYLY |
| Nameplate Capacity | 51.1 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 51.1 MW |
|---|---|
| Winter Capacity | 51.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 2025 |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 60 |
| DC Net Capacity | 66.62 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Egypt Road Solar Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1098 | Gaskell West 1 Solar Facility | Lancaster, CA | 55.6 GWh |
| #1099 | Caden Energix Hickory LLC | Chesapeake, VA | 55.5 GWh |
| #1100 | Catalina Solar 2, LLC | Rosamond, CA | 55.4 GWh |
| #1101 | Apache Solar I | Cochise, AZ | 55.4 GWh |
| #1102 | Kingbird B Solar, LLC | Rosamond, CA | 55.2 GWh |
| #1103 | Antelope DSR 3 | Lancaster, CA | 55.1 GWh |
| #1104 | Fort Benning Solar Facility | Fort Mitchell, AL | 54.7 GWh |
| #1105 | Marine Corps Logistics Base Solar | Albany, GA | 54.7 GWh |
| #1106 | Sunray 2 | Daggett, CA | 54.6 GWh |
| #1107 | Longboat Solar, LLC | Barstow, CA | 54.3 GWh |
| #1109 | Three W Solar | Hillsboro, TX | 54.2 GWh |
| #1110 | Whitney Point Solar | Five Points, CA | 54.2 GWh |
| #1111 | Mondu Solar LLC | Livonia, LA | 53.8 GWh |
| #1112 | Cherrywood Solar I | Greensboro, MD | 53.8 GWh |
| #1113 | English Creek Solar | Plant City, FL | 53.3 GWh |
| #1114 | Arrowleaf Solar and Storage | Brawley, CA | 50.2 GWh |
| #1115 | Seville 1 | Ocotillo Wells, CA | 53.3 GWh |
| #1116 | Innovative Solar 31 | Bladenboro, NC | 53.2 GWh |
| #1117 | Axium Modesto Solar | Modesto, CA | 53.2 GWh |
| #1118 | Lone Valley Solar Park II LLC | Lucerne Valley, CA | 53.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Egypt Road Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Cabin Creek MD | Hurlock, MD | 1.2 GWh | 12.5 mi |
| Calvert Cliffs Nuclear Power Plant | Lusby, MD | 14.9 TWh | 19.6 mi |
| Chalk Point Power | Aquasco, MD | 2.7 TWh | 31.7 mi |
| Chesapeake College | Wye Mills, MD | 2.2 GWh | 29.2 mi |
| Chester Woods Point Solar, LLC CSG | Chester, MD | 4.1 GWh | 30.8 mi |
| CNE at Cambridge MD | Cambridge, MD | 5.6 GWh | 4.5 mi |
| Easton | Easton, MD | 4.9 GWh | 17.2 mi |
| Easton 2 | Easton, MD | 6.2 GWh | 18.3 mi |
| Federalsburg Energy Storage 1 LLC | Federaslburg, MD | 1.3 GWh | 22.3 mi |
| Longview Solar | Hebron, MD | 20.0 GWh | 25 mi |
| MEBA | Easton, MD | 2.3 GWh | 16.9 mi |
| Mustang One | Cambridge, MD | 3.2 GWh | 2.5 mi |
| OER Checkerspot | Tracy's Landing, MD | 3.0 GWh | 31 mi |
| Perdue Bridgeville Photovoltaic | Bridgeville, DE | 1.8 GWh | 31.1 mi |
| Todd Solar | Hurlock, MD | 31.5 GWh | 15.4 mi |
| UMCES Ground Mount | Cambridge, MD | 3.4 GWh | 4.1 mi |
| Vienna Operations | Vienna, MD | 4.6 GWh | 15.4 mi |
| Wicomico | Salisbury, MD | 14.0 GWh | 27.2 mi |
| Wor-Wic Community College - Offsite | Hebron, MD | 3.4 GWh | 23.6 mi |
| Wye Mills VNEM CSG | Queen Anne, MD | 17.1 GWh | 28.5 mi |