Egypt Road Solar
5200 Egypt Road, Cambridge, MD 21613Plant Summary Information
Egypt Road Solar is ranked #154 out of 159 solar farms in Maryland in terms of total annual net electricity generation.
Egypt Road Solar generated 668.0 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Egypt Road Solar |
|---|---|
| Utility Name | Urban Grid Solar |
| Location | Dorchester County, MD |
| Initial Operation Date | Not Available |
| Last Update | Dec 2025 |
| Annual Generation | 668.0 MWh |
| Annual Consumption | 2.3 k MMBtu |
| Ranked #11,645 out of 12,613 Power Plants Nationwide | |
| Ranked #6,260 out of 6,463 Solar Power Plants Nationwide | |
| Ranked #193 out of 202 Maryland Power Plants | |
| Ranked #154 out of 159 Maryland Solar Power Plants | |
| Fuel Types | Solar |
Map of Egypt Road Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Egypt Road Solar.
Monthly Net Generation for Egypt Road Solar
Monthly Plant Fuel Consumption for Egypt Road Solar
Egypt Road Solar Details
| Summary Information | |
|---|---|
| Plant Name | Egypt Road Solar (66840) |
| Plant Address | 5200 Egypt Road, Cambridge, MD 21613 |
| Utility | Urban Grid Solar (65777) |
| Latitude, Longitude | 38.53067, -76.10036 |
| Generation Dates on File | Dec 2025 to Dec 2025 |
| Initial Operation Date | Not Available |
| Annual Generation | 668.0 MWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | RFC |
| Balancing Authority | PJM Interconnection, LLC (PJM) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Delmarva Power (5027) MD |
| Grid Voltage | 69.00 kV |
| Energy Storage | No |
Egypt Road Solar Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #6250 | SunEdison Walmart Apple Valley DC | Apple Valley, CA | 716.0 MWh |
| #6251 | Niagara Solar Project | Randomville, NY | 701.0 MWh |
| #6252 | Overland | Hudson, CO | 698.0 MWh |
| #6253 | PPL Renewable Energy Merck Solar | Summit, NJ | 691.0 MWh |
| #6254 | Red Lake Falls Community Hybrid | Red Lake Falls, MN | 14.0 GWh |
| #6255 | Marshall Solar Plus LLC | Marshall, MN | 539.0 MWh |
| #6256 | Brentwood Solar | Brentwood, NY | 687.0 MWh |
| #6257 | Blue Moon Farms | Tipton, CA | 683.0 MWh |
| #6258 | Wild Horse | Ellensburg, WA | 591.0 GWh |
| #6259 | Lakewood Cheddar School | Lakewood, NJ | 676.0 MWh |
| #6261 | Spring Lane | Ligonier, PA | 667.0 MWh |
| #6262 | Bloomington Solar I | St George, UT | 667.0 MWh |
| #6263 | Golden Springs Building D | Santa Fe Springs, CA | 651.0 MWh |
| #6264 | Copperton Solar Plant No. 1 | Bingham Canyon, UT | 648.0 MWh |
| #6265 | SV CSG AFTON I | Afton, MN | 642.0 MWh |
| #6266 | CFW Solar X LLC - Vaughn | San Fernando, CA | 642.0 MWh |
| #6267 | Antelope Creek | Eagle Point, OR | 641.0 MWh |
| #6268 | Highland Park Borough Solar | Highland Park, NJ | 635.0 MWh |
| #6269 | USS Slayton Solar LLC (CSG) | Slayton, MN | 627.0 MWh |
| #6270 | MD JESSUP 7950 OCEANO AVE | Jessup, MD | 623.0 MWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Egypt Road Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Calvert Cliffs Nuclear Power Plant | Lusby, MD | 14.8 TWh | 19.6 mi |
| Chalk Point Power | Aquasco, MD | 1.7 TWh | 31.7 mi |
| Chesapeake College | Wye Mills, MD | 2.4 GWh | 29.2 mi |
| Chester Woods Point Solar, LLC CSG | Chester, MD | 3.9 GWh | 30.8 mi |
| CNE at Cambridge MD | Cambridge, MD | 5.5 GWh | 4.5 mi |
| Easton | Easton, MD | 2.7 GWh | 17.2 mi |
| Easton 2 | Easton, MD | 4.4 GWh | 18.3 mi |
| Federalsburg Energy Storage 1 LLC | Federaslburg, MD | 1.3 GWh | 22.3 mi |
| Longview Solar | Hebron, MD | 22.5 GWh | 25 mi |
| MEBA | Easton, MD | 2.4 GWh | 16.9 mi |
| Mustang One | Cambridge, MD | 3.0 GWh | 2.5 mi |
| NRG Chalk Point CT | Aquasco, MD | 7.1 GWh | 31.7 mi |
| OER Checkerspot | Tracy's Landing, MD | 2.7 GWh | 31 mi |
| Perdue Bridgeville Photovoltaic | Bridgeville, DE | 2.0 GWh | 31.1 mi |
| Todd Solar | Hurlock, MD | 33.9 GWh | 15.4 mi |
| UMCES Ground Mount | Cambridge, MD | 3.5 GWh | 4.1 mi |
| Vienna Operations | Vienna, MD | 4.6 GWh | 15.4 mi |
| Wicomico | Salisbury, MD | 11.7 GWh | 27.2 mi |
| Wor-Wic Community College - Offsite | Hebron, MD | 3.6 GWh | 23.6 mi |
| Wye Mills VNEM CSG | Queen Anne, MD | 18.5 GWh | 28.5 mi |