Fence Post Solar Hybrid Project, LLC
12915 SE CR 3220, Corsicana, TX 75109Plant Summary Information
Fence Post Solar Hybrid Project, LLC is ranked #43 out of 251 solar farms in Texas in terms of total annual net electricity generation.
Fence Post Solar Hybrid Project, LLC generated 139.0 GWh during the 3-month period between March 2026 to June 2026.
| Plant Name | Fence Post Solar Hybrid Project, LLC |
|---|---|
| Utility Name | Fence Post Solar Project, LLC |
| Location | Navarro County, TX |
| Initial Operation Date | September 2024 |
| Last Update | Jun 2026 |
| Annual Generation | 509.9 GWh |
| Annual Consumption | 1.9 M MMBtu |
| Ranked #1,346 out of 13,094 Power Plants Nationwide | |
| Ranked #112 out of 7,027 Solar Power Plants Nationwide | |
| Ranked #276 out of 858 Texas Power Plants | |
| Ranked #43 out of 251 Texas Solar Power Plants | |
| Fuel Types | Solar |
Map of Fence Post Solar Hybrid Project, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Fence Post Solar Hybrid Project, LLC.
Monthly Net Generation for Fence Post Solar Hybrid Project, LLC
Monthly Plant Fuel Consumption for Fence Post Solar Hybrid Project, LLC
Fence Post Solar Hybrid Project, LLC Details
| Summary Information | |
|---|---|
| Plant Name | Fence Post Solar Hybrid Project, LLC (66801) |
| Plant Address | 12915 SE CR 3220, Corsicana, TX 75109 |
| Utility | Fence Post Solar Project, LLC (65774) |
| Latitude, Longitude | 32.07284, -96.22393 |
| Generation Dates on File | Sep 2024 to Jun 2026 |
| Initial Operation Date | September 2024 |
| Annual Generation | 509.9 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
| Grid Voltage | 138.00 kV / 345.00 kV |
| Energy Storage | Yes |
Generator FNCBE Details Operating September 2024
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| Nameplate Capacity | 72 MW |
| Summer Capacity | 70 MW |
| Winter Capacity | 70 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | September 2024 |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 115 |
|---|---|
| Maximum Charge Rate | 70 MW |
| Maximum Discharge Rate | 70 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 217.9 |
| Storage Enclosure Type | CS |
| Arbitrage | P |
| Frequency Regulation | Yes |
| Voltage Or Reactive Power Support | Yes |
| Direct Support Of Another Unit | No |
| Support T D Asset | No |
Generator FNCPT Details Operating September 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 236 MW |
| Summer Capacity | 236 MW |
| Winter Capacity | 236 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | September 2024 |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Bifacial | Yes |
| DC Net Capacity | 300 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Fence Post Solar Hybrid Project, LLC Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #102 | RE Maplewood | McCamey, TX | 527.6 GWh |
| #103 | Orion III Solar Project | Buckholts, TX | 524.7 GWh |
| #104 | Brittlebush Solar | Coolidge, AZ | 524.2 GWh |
| #105 | RE Garland | Rosamond, CA | 509.7 GWh |
| #106 | Fairbanks Solar Project | Fairbanks, IN | 517.9 GWh |
| #107 | Oxbow Solar 1 | New Roads, LA | 517.6 GWh |
| #108 | Desert Sunlight 250, LLC | Desert Center, CA | 516.8 GWh |
| #109 | Sky Ranch Solar | Belen, NM | 505.5 GWh |
| #110 | Escalante (NM) | Grants, NM | 515.6 GWh |
| #111 | Agua Caliente Solar Project | Dateland, AZ | 514.5 GWh |
| #113 | Thunder Wolf Energy Center Hybrid | Avondale, CO | 498.6 GWh |
| #114 | Maple Flats | Louisville, IL | 513.6 GWh |
| #115 | Taygete Energy Project LLC | Coyanosa, TX | 512.8 GWh |
| #116 | Yellowbud Solar, LLC | Williamsport, OH | 511.6 GWh |
| #117 | 7V Solar Ranch | Muldoon, TX | 509.5 GWh |
| #118 | Sparta Solar | Pawnee, TX | 508.5 GWh |
| #119 | Phoebe Solar | Kermit, TX | 507.5 GWh |
| #120 | Daggett 2 | Daggett, CA | 493.8 GWh |
| #121 | Matrix Pleasant Valley | Boise, ID | 498.4 GWh |
| #122 | Fighting Jays Solar Project | Needville, TX | 498.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Fence Post Solar Hybrid Project, LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Ameresco Dallas LLC | Dallas, TX | 24.8 GWh | 46.7 mi |
| Briar Creek Solar 1 | Corsicana, TX | 222.3 GWh | 21.2 mi |
| Elm Branch Solar 1 | Ennis, TX | 246.3 GWh | 30.3 mi |
| Ennis Power Company LLC | Ennis, TX | 1.6 TWh | 31.4 mi |
| Fairfield Solar Project | Fairfield, TX | 14.4 GWh | 24.9 mi |
| Freestone Energy Center | Fairfield, TX | 6.0 TWh | 14.2 mi |
| Gaia Hybrid | Navarro, TX | 72.3 GWh | 6.3 mi |
| Hubbard Wind | Mt Calm, TX | 835.3 GWh | 41 mi |
| Kellam Solar | Ben Wheeler, TX | 111.4 GWh | 40.6 mi |
| Lily Solar Hybrid | Scurry, TX | 311.1 GWh | 34 mi |
| Limestone | Jewett, TX | 6.8 TWh | 45 mi |
| Limestone Wind Project | Coolidge, TX | 1.0 TWh | 27.9 mi |
| Malakoff Solar Project | Malaloff, TX | 15.9 GWh | 14.3 mi |
| Pin Oak Creek Energy Center, LLC | Fairfield, TX | 120.1 GWh | 14 mi |
| Pisgah Ridge Solar, LLC | Richland, TX | 453.7 GWh | 18.7 mi |
| Pitts Dudik Solar | Hubbard, TX | 98.6 GWh | 40.1 mi |
| Sun Valley Solar Project | Abbott, TX | 565.2 GWh | 48.4 mi |
| Trinidad (TX) | Trinidad, TX | 431.9 GWh | 8 mi |
| Waco Solar | Mt Calm, TX | 802.6 GWh | 42.9 mi |
| WAL565 | Corsicana, TX | 311.0 MWh | 10.7 mi |