Sunnyside 1 Solar
81 Freemans Bridge Road, Scotia, NY 8096Plant Summary Information
Sunnyside 1 Solar is ranked #98 out of 574 solar farms in New York in terms of total annual net electricity generation.
Sunnyside 1 Solar generated 1.4 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Sunnyside 1 Solar |
|---|---|
| Utility Name | Solar DG NY Sunnyside 1, LLC |
| Location | Schenectady County, NY |
| Initial Operation Date | March 2023 |
| Last Update | Dec 2024 |
| Annual Generation | 7.9 GWh |
| Annual Consumption | 27.6 k MMBtu |
| Ranked #6,912 out of 12,539 Power Plants Nationwide | |
| Ranked #2,394 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #368 out of 944 New York Power Plants | |
| Ranked #98 out of 574 New York Solar Power Plants | |
| Fuel Types | Solar |
Map of Sunnyside 1 Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Sunnyside 1 Solar.
Monthly Net Generation for Sunnyside 1 Solar
Sunnyside 1 Solar Details
| Summary Information | |
|---|---|
| Plant Name | Sunnyside 1 Solar (66504) |
| Plant Address | 81 Freemans Bridge Road, Scotia, NY 8096 |
| Utility | Solar DG NY Sunnyside 1, LLC (65503) |
| Latitude, Longitude | 42.83628, -73.94395 |
| Generation Dates on File | Apr 2023 to Dec 2024 |
| Initial Operation Date | March 2023 |
| Annual Generation | 7.9 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | QF23-710 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | NPCC |
| Balancing Authority | New York Independent System Operator (NYIS) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Niagara Mohawk Power Corp. (13573) NY |
| Grid Voltage | 13.20 kV |
| Energy Storage | No |
Generator SS1 Details Operating March 2023
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 5 MW |
| Summer Capacity | 5 MW |
| Winter Capacity | 5 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | March 2023 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 25 |
| DC Net Capacity | 6.5 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Sunnyside 1 Solar Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #2384 | Syncarpha Taos | Taos, NM | 7.9 GWh |
| #2385 | 28 Livermore Hill Road Solar | Westminster, MA | 7.9 GWh |
| #2386 | Hwy 14 Holdco Solar CSG | Byron, MN | 7.9 GWh |
| #2387 | SID Solar I, LLC | Shelby, NC | 7.9 GWh |
| #2388 | Synergen Panorama, LLC CSG | Fort Washington, MD | 7.9 GWh |
| #2389 | Kern Valley SP | Delano, CA | 7.9 GWh |
| #2390 | Syncarpha Millbury Hybrid (CSG) | Millbury, MA | 7.9 GWh |
| #2391 | Lenoir Farm 2 | Kinston, NC | 7.9 GWh |
| #2392 | Owlville Creek Solar 2, LLC | Canastota, NY | 7.8 GWh |
| #2393 | BWC Lake Lashaway, LLC Hybrid | North Brookfield, MA | 7.9 GWh |
| #2395 | Everetts Wildcat Solar, LLC | Williamston, NC | 7.9 GWh |
| #2396 | Pine Hill | Johnston, RI | 7.9 GWh |
| #2397 | Bright Hill Solar LLC(CSG) | Dansville, NY | 7.9 GWh |
| #2398 | Bristol Landfill Solar | Bristol, RI | 7.9 GWh |
| #2399 | North Palm Springs 4A | Palm Springs, CA | 7.9 GWh |
| #2400 | Dennis Landfill | Dennis, MA | 7.9 GWh |
| #2401 | North Gainesville Solar | Gainesville, TX | 7.9 GWh |
| #2402 | Ray Wilson Solar | Advance, NC | 7.9 GWh |
| #2403 | Wheatland 2A Solar | Scottsville, NY | 7.9 GWh |
| #2404 | Great Lakes Seaway Community Solar | Clayton, NY | 7.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Sunnyside 1 Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| (3K) 59 Hetcheltown Rd | Glenville, NY | 1.7 GWh | 3.3 mi |
| 25 Ashdown Road Solar, LLC | Clifton Park, NY | 6.0 GWh | 4.6 mi |
| Clifton Park Solar 1, LLC | Rexford, NY | 8.3 GWh | 5.5 mi |
| Clifton Park Solar 2, LLC | Rexford, NY | 3.2 GWh | 5.5 mi |
| Gifford CSG | Schenectady, NY | 2.4 GWh | 6.5 mi |
| Glenville Solar (CSG) | Glenville, NY | 6.9 GWh | 0.6 mi |
| Knaggs Brothers Farm | Altamont, NY | 6.9 GWh | 7.4 mi |
| Mohonasen Central School District | Schenectady, NY | 1.6 GWh | 4.8 mi |
| Princetown Solar 1 | Duanesburg, NY | 221.0 MWh | 7.5 mi |
| SCH - (2A) 156 Barhydt Rd Glenville | Glenville, NY | 6.4 GWh | 5.5 mi |
| SCH County - (1B) 10 Alice Wagner Way Ni | Niskayuna, NY | 4.5 GWh | 2.3 mi |
| SCH County - (1E) 398 Anthony St Schenec | Schenectady, NY | 1.3 GWh | 1.4 mi |
| SCH County - (2D) 98 Cheltingham Ave Sch | Schenectady, NY | 2.1 GWh | 3.1 mi |
| Sugar Hill Solar 1 | Clifton Park, NY | 8.4 GWh | 5.1 mi |
| Sugarhill Road - Solitude Solar CSG | Rexford, NY | 8.2 GWh | 4.9 mi |
| Sunnyside 2 Solar | Scotia, NY | 8.2 GWh | 0 mi |
| Swaggertown Solar I | Glenville, NY | 122.0 MWh | 4.2 mi |
| Swaggertown Solar II | Glenville, NY | 1.3 GWh | 4.2 mi |
| Vischer Ferry | Rexford, NY | 55.6 GWh | 5.5 mi |
| Washington Avenue Solar, LLC | Glenville, NY | 4.2 GWh | 1.1 mi |