Houston Solar
Hawk Lane, Houston, AK 99694Plant Summary Information
Houston Solar is ranked #1 out of 2 solar farms in Alaska in terms of total annual net electricity generation.
Houston Solar generated 347.0 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Houston Solar |
|---|---|
| Utility Name | Energy 49, LLC |
| Location | Matanuska-Susitna Borough, AK |
| Initial Operation Date | September 2023 |
| Last Update | Dec 2025 |
| Annual Generation | 7.1 GWh |
| Annual Consumption | 24.2 k MMBtu |
| Ranked #7,377 out of 13,081 Power Plants Nationwide | |
| Ranked #2,866 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #56 out of 125 Alaska Power Plants | |
| Ranked #1 out of 2 Alaska Solar Power Plants | |
| Fuel Types | Solar |
Map of Houston Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Houston Solar.
Monthly Net Generation for Houston Solar
Monthly Plant Fuel Consumption for Houston Solar
Houston Solar Details
| Summary Information | |
|---|---|
| Plant Name | Houston Solar (66887) |
| Plant Address | Hawk Lane, Houston, AK 99694 |
| Utility | Energy 49, LLC (65807) |
| Latitude, Longitude | 61.59, -149.79 |
| Generation Dates on File | Nov 2023 to Dec 2025 |
| Initial Operation Date | September 2023 |
| Annual Generation | 7.1 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | |
| Balancing Authority | No BA (NA) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | NA |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Matanuska Electric Assn Inc (11824) AK |
| Grid Voltage | 24.90 kV |
| Energy Storage | No |
Generator HOU Details Operating September 2023
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 6 MW |
| Summer Capacity | 6 MW |
| Winter Capacity | 6 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | September 2023 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 40 |
| DC Net Capacity | 8.4 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | Yes |
| Net Metering DC Capacity | 6 MW |
| Virtual Net Metering Agreement | No |
Houston Solar Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #2856 | Yanceyville Farm | Blanch, NC | 7.1 GWh |
| #2857 | Enfield Solar Site 2 | Enfield, NY | 7.1 GWh |
| #2858 | Enfield Solar Site 3 | Enfield, NY | 7.1 GWh |
| #2859 | Enfield Solar Site 1 | Enfield, NY | 7.1 GWh |
| #2860 | Currin Solar, LLC | Oxford, NC | 7.1 GWh |
| #2861 | 1639 RT 29 Solar 1 | Gloversville, NY | 7.1 GWh |
| #2862 | Suffolk CSG, LLC | Suffolk, VA | 7.1 GWh |
| #2863 | Amaterasu LLC | Lancaster, MA | 7.0 GWh |
| #2864 | Lowndes Cowart | Valdosta, GA | 7.1 GWh |
| #2865 | Tift Fletcher | Tifton, GA | 7.1 GWh |
| #2867 | Pecan Grove Solar, LLC | New Bern, NC | 7.1 GWh |
| #2868 | Solar Lee, LLC | Mount Olive, NC | 7.1 GWh |
| #2869 | Maple North 1 | Amsterdam, NY | 7.0 GWh |
| #2870 | Brewer (CSG) | Brewer, ME | 7.0 GWh |
| #2871 | Kokomo Solar 1, LLC | Kokomo, IN | 7.0 GWh |
| #2872 | Sweden 1 | Sweden, NY | 7.0 GWh |
| #2873 | Flowers Solar LLC | Benson, NC | 7.0 GWh |
| #2874 | Walters Solar (FLS 260) | Orrum, NC | 7.0 GWh |
| #2875 | Dusenberry | Troy, NY | 7.0 GWh |
| #2876 | Swaggertown Solar II | Glenville, NY | 7.0 GWh |
Nearby Power Plants
Below are closest 14 power plants surrounding Houston Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bernice Lake | Nikiski, AK | 211.0 MWh | 81.7 mi |
| Bradley Lake | Homer, AK | 414.7 GWh | 131.1 mi |
| Cooper Lake | Cooper Landing, AK | 52.5 GWh | 82.9 mi |
| Eklutna Generation Station | Chugiak, AK | 310.9 GWh | 17.1 mi |
| Eklutna Hydro Project | Palmer, AK | 157.6 GWh | 22.5 mi |
| Fire Island Wind | Anchorage, AK | 49.8 GWh | 35.2 mi |
| George M Sullivan Generation Plant 2 | Anchorage, AK | 1.8 TWh | 25 mi |
| Hank Nikkels Plant 1 | Anchorage, AK | 10.3 GWh | 25.5 mi |
| JBER Landfill Gas Power Plant | Anchorage, AK | 42.8 GWh | 21.8 mi |
| Nikiski Combined Cycle | Nikiski, AK | 445.0 GWh | 82.4 mi |
| Seward (AK) | Seward, AK | 671.0 MWh | 101.5 mi |
| Soldotna | Soldotna, AK | 20.0 GWh | 85.5 mi |
| Southcentral Power Project | Anchorage, AK | 1.1 TWh | 29.4 mi |
| Tesoro Kenai Cogeneration Plant | Kenai, AK | 39.7 GWh | 82.4 mi |