Cicero Energy Storage 1 LLC
7790 Northern Boulevard, East Syracuse, NY 13057Plant Summary Information
Cicero Energy Storage 1 LLC is ranked #190 out of 682 solar farms in New York in terms of total annual net electricity generation.
Cicero Energy Storage 1 LLC generated 868.0 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Cicero Energy Storage 1 LLC |
|---|---|
| Utility Name | Convergent Energy and Power LP |
| Location | Onondaga County, NY |
| Initial Operation Date | March 2022 |
| Last Update | Dec 2025 |
| Annual Generation | 6.9 GWh |
| Annual Consumption | 24.0 k MMBtu |
| Ranked #7,439 out of 13,081 Power Plants Nationwide | |
| Ranked #2,909 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #459 out of 1,045 New York Power Plants | |
| Ranked #190 out of 682 New York Solar Power Plants | |
| Fuel Types | Solar |
Map of Cicero Energy Storage 1 LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Cicero Energy Storage 1 LLC.
Monthly Net Generation for Cicero Energy Storage 1 LLC
Monthly Plant Fuel Consumption for Cicero Energy Storage 1 LLC
Cicero Energy Storage 1 LLC Details
| Summary Information | |
|---|---|
| Plant Name | Cicero Energy Storage 1 LLC (66501) |
| Plant Address | 7790 Northern Boulevard, East Syracuse, NY 13057 |
| Utility | Convergent Energy and Power LP (61978) |
| Latitude, Longitude | 43.14745, -76.08677 |
| Generation Dates on File | Mar 2022 to Dec 2025 |
| Initial Operation Date | March 2022 |
| Annual Generation | 6.9 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 22-429 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | NPCC |
| Balancing Authority | New York Independent System Operator (NYIS) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Niagara Mohawk Power Corp. (13573) NY |
| Grid Voltage | 13.20 kV |
| Energy Storage | Yes |
Generator CCBA1 Details Operating March 2022
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| Nameplate Capacity | 5 MW |
| Summer Capacity | 5 MW |
| Winter Capacity | 5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | March 2022 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Time From Cold Shutdown To Full Load | 10M |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 20 |
|---|---|
| Maximum Charge Rate | 5 MW |
| Maximum Discharge Rate | 5 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 5 |
| Storage Enclosure Type | CS |
| Co Located Renewable Firming | P |
| Transmission And Distribution Deferral | Yes |
| System Peak Shaving | Yes |
| Excess Wind And Solar Generation | Yes |
| DC Coupled | Yes |
| Direct Support Of Another Unit | Yes |
| Direct Support Plant Id | 66501 |
| Direct Support Gen Id | CCPV1 |
| Support T D Asset | No |
Generator CCPV1 Details Operating March 2022
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 5 MW |
| Summer Capacity | 5 MW |
| Winter Capacity | 5 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | March 2022 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Tilt Angle | 20 |
| DC Net Capacity | 7.7 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Cicero Energy Storage 1 LLC Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #2899 | State Highway 17B Solar | Bethel, NY | 6.9 GWh |
| #2900 | Pivot Solar 30 | Greeley, CO | 6.9 GWh |
| #2901 | GMP Solar - Hartford | Hartford, VT | 6.9 GWh |
| #2902 | NY 26 Carthage CSG | Carthage, NY | 6.9 GWh |
| #2903 | Garrell Solar Farm | Chadbourn, NC | 6.9 GWh |
| #2904 | ZV Solar 2 | Red Springs, NC | 6.9 GWh |
| #2905 | Owen Solar | Lincolnton, NC | 6.9 GWh |
| #2906 | Toyota HQ Plan | Plano, TX | 6.9 GWh |
| #2907 | TJA-NY-Canton Solar Farm LLC | Canton, NY | 6.9 GWh |
| #2908 | Springfield Solar 1 LLC | Strafford, MO | 6.9 GWh |
| #2910 | State Route 14A Solar | Benton, NY | 6.9 GWh |
| #2911 | McDougle-Mitchell Solar Project Hybrid C | Charlton, MA | 6.9 GWh |
| #2912 | Nash 64 Farm | Spring Hope, NC | 6.9 GWh |
| #2913 | AGA TAG Solar IV LLC | Leland, NC | 6.9 GWh |
| #2914 | Bellisario Solar 1 | Lapeer, NY | 6.9 GWh |
| #2915 | Independence East | Independence, NY | 6.9 GWh |
| #2916 | Bulloch County GA S4 LLC | Statesboro, GA | 6.9 GWh |
| #2917 | Chaffey College Rancho Cucamonga Campus | Rancho Cucamonga, CA | 6.9 GWh |
| #2918 | White Brook Renewables PV | West Greenwich, RI | 6.9 GWh |
| #2919 | Oakboro Farm | Laurinburg, NC | 6.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Cicero Energy Storage 1 LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Carr Street Generating Station | East Syracuse, NY | 227.6 GWh | 6 mi |
| CH Resources Syracuse | Solvay, NY | 54.8 GWh | 8.9 mi |
| Cicero Energy Storage 2 LLC | East Syracuse, NY | 6.5 GWh | 0.3 mi |
| Clay Solar CSG | Clay, NY | 7.4 GWh | 7.1 mi |
| Clemons Road Solar | Minoa, NY | 4.1 GWh | 7 mi |
| Green Lakes Solar | Manilus, NY | 7.9 GWh | 9.6 mi |
| Manilus | Manilus, NY | 6.4 GWh | 7.7 mi |
| Manlius East | Manlius, NY | 8.9 GWh | 10.9 mi |
| Meltwater | Manlius, NY | 7.0 MWh | 8.9 mi |
| North Eagle Village Solar | Manilus, NY | 7.3 GWh | 9.6 mi |
| Onondaga County - Metro Water Board | Clay, NY | 1.1 GWh | 7.4 mi |
| Onondaga County - Oak Orchard WWTP | Clay, NY | 2.5 GWh | 2.8 mi |
| Onondaga County Resource Recovery | Jamesville, NY | 179.4 GWh | 10 mi |
| Source Power II - Taft CSG | East Syracuse, NY | 4.3 GWh | 2.8 mi |
| Summit - Cicero | Brewerton, NY | 8.4 GWh | 4 mi |
| Summit - Lysander (CSG) | Lysander, NY | 6.0 GWh | 10 mi |
| Sunvestment Energy Group NY 63 LLC | East Syracuse, NY | 2.9 GWh | 7.5 mi |
| USNY - Geddes | Town of Geddes, NY | 1.4 GWh | 8.8 mi |
| Ver Plank North (CSG) | Clay, NY | 5.0 GWh | 5.8 mi |
| Ver Plank South (CSG) | Clay, NY | 8.3 GWh | 5.5 mi |