Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| AGT001 Centerville Fuel Cell | 2016 ESA Project Company, LLC | Wilmington, DE | PJM Interconnection, LLC (PJM) | 10.1 GWh | Feb 2019 | Dec 2024 | Natural Gas |
| AGT000 Stevens Creek Fuel Cell | 2016 ESA Project Company, LLC | Santa Clara, CA | California Independent System Operator (CISO) | 7.6 GWh | Aug 2018 | Dec 2024 | Natural Gas |
| ABC Coke | ABC Coke - Drummond Co, Inc | Tarrant, AL | Southern Company Services, Inc. - Trans (SOCO) | 9.0 MWh | Jul 1997 | Dec 2024 | Other Gas : 55.4% Natural Gas : 44.6% |
| ABEC #2 dba West-Star Dairy | ABEC #2 LLC | Buttonwillow, CA | California Independent System Operator (CISO) | 8.5 GWh | Jan 2018 | Dec 2024 | Other Biomass Gas |
| ABEC #3 dba Lakeview Dairy | ABEC #3 LLC | Bakersfield, CA | California Independent System Operator (CISO) | 6.0 GWh | Jan 2018 | Dec 2024 | Other Biomass Gas |
| ABEC #4 dba CE&S Dairy | ABEC #4 LLC | Bakersfield, CA | California Independent System Operator (CISO) | 7.9 GWh | Jan 2018 | Dec 2024 | Other Biomass Gas |
| ABEC Bidart-Old River LLC | ABEC Bidart-Old River LLC | Bakersfield, CA | California Independent System Operator (CISO) | 16.3 GWh | Nov 2013 | Dec 2024 | Other Biomass Gas |
| Abel Road Bioenergy | ACC Renewable Resources | Williams, CA | California Independent System Operator (CISO) | 22.3 GWh | Jun 2022 | Dec 2024 | Agricultural By-Products |
| Anchor Wind, LLC | Acciona Energy USA Global, LLC | Mechanicsville, IA | Midcontinent Independent System Operator, Inc. (MISO) | 5.9 GWh | Sep 2012 | May 2024 | Wind |
| AEUG Union Solar, LLC | Acciona Energy USA Global, LLC | West Mansfield, OH | PJM Interconnection, LLC (PJM) | 599.5 GWh | Oct 2024 | Sep 2025 | Solar |
| ACE-Stanton A PV | ACE-Stanton A, LLC | Orlando, FL | Florida Municipal Power Pool (FMPP) | 7.8 GWh | Aug 2017 | Dec 2024 | Solar |
| ACE-Stanton PV | ACE-Stanton, LLC | Orlando, FL | Florida Municipal Power Pool (FMPP) | 9.2 GWh | Aug 2017 | Dec 2024 | Solar |
| Apple Canyon Lake Solar | ACM Solar, LLC. | Apple River, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.5 GWh | Nov 2020 | Dec 2024 | Solar |
| Acme Solar, LLC | Acme Solar, LLC | Riegelwood, NC | Duke Energy Progress East (CPLE) | 6.5 GWh | Mar 2021 | Dec 2024 | Solar |
| Acton | Acton H Road Solar 1, LLC | Acton, ME | ISO New England (ISNE) | 4.6 GWh | Nov 2021 | Dec 2024 | Solar |
| ADA Carbon Solutions Red River | ADA Carbon Solutions (Red River), LLC | Coushatta, LA | Midcontinent Independent System Operator, Inc. (MISO) | 99.0 GWh | Jan 2011 | Sep 2025 | Waste Heat |
| Ada Cogeneration LP | Ada Cogeneration LLC | Ada, MI | Midcontinent Independent System Operator, Inc. (MISO) | 157.9 GWh | Sep 1990 | Dec 2024 | Natural Gas |
| Adams Community Solar Garden III LLC | Adams Community Solar Garden III LLC | Watkins, CO | Public Service Company of Colorado (PSCO) | 3.9 GWh | Jun 2015 | Dec 2024 | Solar |
| Adams Community Solar Garden LLC | Adams Community Solar Garden LLC | Watkins, CO | Public Service Company of Colorado (PSCO) | 3.9 GWh | Jun 2015 | Dec 2024 | Solar |
| Adams PV Plant | Adams PV Plant (WI) | Adams, WI | Midcontinent Independent System Operator, Inc. (MISO) | 16.8 GWh | Jun 2023 | Dec 2024 | Solar |
| Adams Solar LLC PA | Adams Solar LLC (PA) | Gettysburg, PA | PJM Interconnection, LLC (PJM) | 143.5 GWh | Nov 2023 | Sep 2025 | Solar |
| Adams | Adams Solar SC, LLC | Piedmont, SC | Duke Energy Carolinas (DUK) | 4.8 GWh | Oct 2021 | Dec 2024 | Solar |
| Adapture CA2, LLC | Adapture Renewables, Inc. | Orland, CA | PacifiCorp West (PACW) | 3.1 GWh | Feb 2016 | Dec 2024 | Solar |
| Adelanto Solar II, LLC | Adelanto Solar II, LLC | Adelanto, CA | California Independent System Operator (CISO) | 14.4 GWh | Jun 2015 | Dec 2024 | Solar |
| Adelanto Solar, LLC | Adelanto Solar, LLC | Adelanto, CA | California Independent System Operator (CISO) | 53.2 GWh | Aug 2015 | Dec 2024 | Solar |
| Adkins Energy LLC | Adkins Energy LLC | Lena, IL | PJM Interconnection, LLC (PJM) | 39.0 GWh | Jul 2002 | Dec 2024 | Natural Gas |
| ADP Roseland, NJ | ADP Boulevard Solar Project 2021, LLC | Roseland, NJ | PJM Interconnection, LLC (PJM) | 1.0 GWh | Feb 2024 | Dec 2024 | Solar |
| Adrian | Adrian Public Utilities Comm | Adrian, MN | Southwest Power Pool (SWPP) | 21.0 MWh | Apr 2005 | Dec 2024 | Distillate Fuel Oil |
| ADS Renewable Energy-Wolf Creek LLC | ADS Renewable Energy- Wolf Creek, LLC | Dry Branch, GA | Southern Company Services, Inc. - Trans (SOCO) | 18.1 GWh | Oct 2011 | Dec 2024 | Landfill Gas |
| Aegean Drive Solar | Aegean Drive Solar LLC | Methuen, MA | ISO New England (ISNE) | 2.6 GWh | Aug 2021 | Dec 2024 | Solar |
| AEP Jacksonville Solar Project | AEP Onsite Partners, LLC | Duval, FL | JEA (JEA) | 13.0 GWh | Apr 2017 | Dec 2024 | Solar |
| Aera San Ardo Cogen Facility | Aera Energy LLC-San Ardo | San Ardo, CA | California Independent System Operator (CISO) | 17.2 GWh | Jun 1989 | Dec 2024 | Natural Gas |
| AES Alamitos Energy Center | AES Alamitos Energy, LLC | Long Beach, CA | California Independent System Operator (CISO) | 1.9 TWh | Jan 2020 | Sep 2025 | Natural Gas |
| AES Alamitos LLC | AES Alamitos LLC | Long Beach, CA | California Independent System Operator (CISO) | 38.3 GWh | Aug 1956 | Aug 2025 | Natural Gas |
| AES Daigle Solar, LLC | AES Clean Energy | Fort Kent, ME | (NBSO) | 6.7 GWh | Apr 2023 | Dec 2024 | Solar |
| AES Pelletier Solar, LLC | AES Clean Energy | Fort Kent, ME | (NBSO) | 3.6 GWh | Apr 2023 | Dec 2024 | Solar |
| Antelope DSR 3 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 57.7 GWh | Aug 2019 | Dec 2024 | Solar |
| Adera Solar | AES Distributed Energy | Chowchilla, CA | California Independent System Operator (CISO) | 17.3 GWh | Nov 2015 | Dec 2024 | Solar |
| Antelope Big Sky Ranch | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 54.0 GWh | Jul 2016 | Dec 2024 | Solar |
| Amazon - Patterson PV | AES Distributed Energy | Patterson, CA | Balancing Authority of Northern California (BANC) | 4.8 GWh | Apr 2017 | Dec 2024 | Solar |
| Antelope DSR 1 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 131.6 GWh | Nov 2016 | Sep 2025 | Solar |
| AES West Oahu Solar Hybrid | AES Distributed Energy | Waipahu, HI | (HECO) | 22.6 GWh | Feb 2024 | Sep 2025 | Solar : 99.2% |
| Aspiration G | AES Distributed Energy | Cantua Creek, CA | California Independent System Operator (CISO) | 21.3 GWh | Aug 2017 | Dec 2024 | Solar |
| AC Criminal Courts Complex SPE2, LLC | AES Distributed Energy | Mays Landing, NJ | PJM Interconnection, LLC (PJM) | 496.0 MWh | Nov 2012 | Dec 2024 | Solar |
| Arizona Western College PV | AES Distributed Energy | Yuma, AZ | Arizona Public Service Company (AZPS) | 1.5 GWh | Oct 2011 | Dec 2024 | Solar |
| AES Kekaha Solar, LLC Hybrid | AES Distributed Energy | Kekaha, HI | 26.0 GWh | Nov 2019 | Dec 2024 | Solar | |
| Antelope DSR 2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 12.0 GWh | Nov 2016 | Dec 2024 | Solar |
| AES Lawai Solar Hybrid | AES Distributed Energy | Lawai, HI | 41.3 GWh | Nov 2018 | Sep 2025 | Solar : 99.3% | |
| AES Maui Kuihelani Solar Hybrid | AES Distributed Energy | Waikapu, HI | (HECO) | 109.7 GWh | Apr 2024 | Sep 2025 | Solar |
| Antelope Expansion 1B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 45.4 GWh | Oct 2022 | Dec 2024 | Solar |
| Annese Solar Project Hybrid CSG | AES Distributed Energy | Southbridge, MA | ISO New England (ISNE) | 7.6 GWh | Nov 2020 | Dec 2024 | Solar |
| Antelope Expansion 2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 270.9 GWh | Nov 2018 | Sep 2025 | Solar |
| Allis Medina Solar LLC CSG | AES Distributed Energy | Medina, NY | New York Independent System Operator (NYIS) | 7.1 GWh | Jun 2020 | Dec 2024 | Solar |
| Antelope Expansion 3A | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 31.7 GWh | May 2021 | Dec 2024 | Solar |
| Antelope Expansion 3B | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 11.0 GWh | May 2021 | Dec 2024 | Solar |
| AES Tonawanda Solar LLC | AES Distributed Energy | Tonawanda, NY | New York Independent System Operator (NYIS) | 3.1 GWh | Dec 2019 | Dec 2024 | Solar |
| AES Waikoloa Solar Hybrid | AES Distributed Energy | Waikoloa Village, HI | (HECO) | 61.6 GWh | Mar 2023 | Sep 2025 | Solar : 99.3% |
| Anheuser-Busch Baldwinsville | AES Distributed Energy | Baldwinsville, NY | New York Independent System Operator (NYIS) | 2.8 GWh | Jun 2018 | Dec 2024 | Solar |
| Amaterasu LLC | AES Distributed Energy | Lancaster, MA | ISO New England (ISNE) | 6.8 GWh | May 2021 | Dec 2024 | Solar |
| AES Belleville Solar LLC | AES Distributed Energy | Belleville, IL | Midcontinent Independent System Operator, Inc. (MISO) | 12.9 GWh | Aug 2021 | Nov 2024 | Solar |
| Alicea Solar Project Hybrid CSG | AES Distributed Energy | Southbridge, MA | ISO New England (ISNE) | 3.6 GWh | Nov 2020 | Dec 2024 | Solar |
| AES Griggs Solar, LLC | AES Griggs Solar, LLC | Grant Park, IL | PJM Interconnection, LLC (PJM) | 3.4 GWh | Nov 2020 | Dec 2024 | Solar |
| AES Huntington Beach Energy Project | AES Huntington Beach Energy, LLC | Huntington Beach, CA | California Independent System Operator (CISO) | 2.1 TWh | Jan 2020 | Sep 2025 | Natural Gas |
| AES Huntington Beach LLC | AES Huntington Beach LLC | Huntington Beach, CA | California Independent System Operator (CISO) | 7.5 GWh | May 1958 | Aug 2025 | Natural Gas |
| AES Petersburg | AES Indiana | Petersburg, IN | Midcontinent Independent System Operator, Inc. (MISO) | 4.7 TWh | May 1967 | Sep 2025 | Bituminous Coal : 99.8% |
| AES Redondo Beach LLC | AES Redondo Beach LLC | Redondo Beach, CA | California Independent System Operator (CISO) | 256.2 GWh | Sep 1954 | Dec 2023 | Natural Gas |
| AES Warrior Run Cogeneration Facility | AES WR Ltd Partnership | Cumberland, MD | PJM Interconnection, LLC (PJM) | 726.4 GWh | Jul 1999 | Jun 2024 | Bituminous Coal : 99.8% |
| AGA TAG Solar III LLC | AGA TAG Solar III LLC | Spartanburg, SC | Duke Energy Carolinas (DUK) | 2.9 GWh | Jul 2020 | Dec 2024 | Solar |
| AGA TAG Solar IV LLC | AGA TAG Solar IV LLC | Leland, NC | Duke Energy Progress East (CPLE) | 8.0 GWh | Nov 2019 | Dec 2024 | Solar |
| Auburn Solar Project | Agilitas Energy, Inc. | Auburn, MA | ISO New England (ISNE) | 8.2 GWh | Apr 2022 | Dec 2024 | Solar |
| Agrilectric Power Partners Ltd | Agrilectric Power Partners Ltd | Lake Charles, LA | Midcontinent Independent System Operator, Inc. (MISO) | 78.9 GWh | Jun 1984 | Dec 2024 | Agricultural By-Products : 98.9% Natural Gas : 1.1% |
| Agriwind | Agriwind Holdings, LLC | Tiskilwa, IL | Midcontinent Independent System Operator, Inc. (MISO) | 12.7 GWh | Jun 2007 | Dec 2024 | Wind |
| Agua Caliente Solar Project | Agua Caliente Solar | Dateland, AZ | California Independent System Operator (CISO) | 548.2 GWh | Apr 2012 | Sep 2025 | Solar |
| Ahern Community Solar I, LLC | Ahern Community Solar I, LLC | Morris, IL | PJM Interconnection, LLC (PJM) | 3.0 GWh | Apr 2023 | Dec 2024 | Solar |
| Algonquin Windsor Locks | Ahlstrom Power Windsor Locks LLC | Windsor Locks, CT | ISO New England (ISNE) | 125.2 GWh | Dec 1989 | Sep 2025 | Natural Gas : 99.9% |
| Air Products Port Arthur | Air Products LLC | Port Arthur, TX | Midcontinent Independent System Operator, Inc. (MISO) | 998.1 GWh | Oct 2000 | Dec 2024 | Natural Gas : 92.8% Other Gas : 7.2% |
| Airport Solar | Airport Solar LLC | Lakeview, OR | PacifiCorp West (PACW) | 102.8 GWh | Nov 2019 | Sep 2025 | Solar |
| AJMS, LLC | AJMS, LLC | Shoshone, ID | Idaho Power Company (IPCO) | 3.8 GWh | Sep 2015 | Dec 2024 | Water |
| AMEA Peaking | Alabama Municipal Elec Authority | Sylacauga, AL | Southern Company Services, Inc. - Trans (SOCO) | 35.2 GWh | Apr 2004 | Dec 2024 | Natural Gas |
| ANAD Solar Array | Alabama Power Co | Anniston Army Depot, AL | Southern Company Services, Inc. - Trans (SOCO) | 12.9 GWh | Jun 2017 | Dec 2024 | Solar |
| Alabama Pine Pulp | Alabama River Cellulose LLC | Perdue Hill, AL | Southern Company Services, Inc. - Trans (SOCO) | 399.3 GWh | Oct 1991 | Sep 2025 | Black Liquor : 95.7% Natural Gas : 4.3% |
| Alabama River Pulp | Alabama River Cellulose LLC | Perdue Hill, AL | Southern Company Services, Inc. - Trans (SOCO) | 334.2 GWh | Oct 1978 | Dec 2024 | Black Liquor : 64.4% Wood/Wood Waste Solids : 22.0% Natural Gas : 11.7% Distillate Fuel Oil : 1.8% |
| Annex Creek | Alaska Electric Light & Power Co. | Juneau, AK | 4.9 GWh | Nov 1915 | Dec 2024 | Water | |
| Ambler | Alaska Village Elec Coop, Inc | Ambler, AK | 1.2 GWh | Nov 1990 | Dec 2024 | Distillate Fuel Oil | |
| Albany Green Energy | Albany Green Energy, LLC | Albany, GA | Southern Company Services, Inc. - Trans (SOCO) | 188.9 GWh | Jun 2017 | Sep 2025 | Wood/Wood Waste Solids : 99.9% |
| Albany Medical Ctr Cogen Plant | Albany Medical Center | Albany, NY | New York Independent System Operator (NYIS) | 28.8 GWh | Feb 2013 | Dec 2024 | Natural Gas |
| Albemarle Beach Solar | Albemarle Beach Solar, LLC | Roper, NC | PJM Interconnection, LLC (PJM) | 229.9 GWh | Nov 2020 | Sep 2025 | Solar |
| Albert Einstein College of Medicine | Albert Einstein College of Medicine | Bronx, NY | New York Independent System Operator (NYIS) | 11.0 MWh | Dec 2000 | Dec 2024 | Distillate Fuel Oil |
| Albertson Solar LLC | Albertson Solar LLC | Albertson, NC | Duke Energy Progress East (CPLE) | 10.4 GWh | Jun 2015 | Dec 2024 | Solar |
| Alden Road Harvard Solar 1 | Alden Road Harvard Solar 1, LLC | Harvard, IL | Midcontinent Independent System Operator, Inc. (MISO) | 4.0 GWh | Nov 2020 | Dec 2024 | Solar |
| Algonquin SKIC 10 Solar, LLC | Algonquin Power Co | Taft, CA | California Independent System Operator (CISO) | 14.8 GWh | Dec 2016 | Dec 2024 | Solar |
| Algonquin SKIC20 Solar LLC | Algonquin Power Co | Taft, CA | California Independent System Operator (CISO) | 41.1 GWh | Apr 2015 | Dec 2024 | Solar |
| Algonquin Power Sanger LLC | Algonquin Power Sanger LLC | Sanger, CA | California Independent System Operator (CISO) | 5.1 GWh | Nov 2007 | Sep 2025 | Natural Gas |
| All World Solar Facility | All World Machinery Supply, Inc. | Roscoe, IL | PJM Interconnection, LLC (PJM) | 2.2 GWh | Oct 2023 | Dec 2024 | Solar |
| Allegany Cogen | Allegany Generating Station, LLC | Fillmore, NY | New York Independent System Operator (NYIS) | 15.5 GWh | May 1994 | Dec 2024 | Natural Gas |
| Allegheny Hydro No 9 | Allegheny Hydro LP | Cowansville, PA | PJM Interconnection, LLC (PJM) | 88.2 GWh | Nov 1990 | Dec 2024 | Water |
| Allegheny Hydro No 8 | Allegheny Hydro LP | Adrian, PA | PJM Interconnection, LLC (PJM) | 70.6 GWh | Nov 1990 | Dec 2024 | Water |
| Allendale Biomass | Allendale Biomass LLC | Fairfax, SC | South Carolina Public Service Authority (SC) | 137.6 GWh | Oct 2013 | Dec 2024 | Wood/Wood Waste Solids |
| Armenia Mountain Wind Farm | ALLETE Clean Energy | Mainesburg, PA | PJM Interconnection, LLC (PJM) | 235.4 GWh | Nov 2009 | Dec 2024 | Wind |
| Allie L.L.C. (CSG) | Allie L.L.C. | Renville, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Jul 2022 | Dec 2024 | Solar |
Summary of Power Plants By State
Figures are based on September 2025 generation numbers.| State | Rank | Active Plants | Sep 2025 Generation |
|---|---|---|---|
| Alabama | # 7 | 76 | 12,052.47 GWh |
| Alaska | # 48 | 147 | 527.57 GWh |
| Arizona | # 9 | 183 | 11,602.92 GWh |
| Arkansas | # 21 | 117 | 5,844.09 GWh |
| California | # 4 | 1,769 | 19,371.91 GWh |
| Colorado | # 30 | 304 | 4,433.17 GWh |
| Connecticut | # 32 | 168 | 3,779.74 GWh |
| Delaware | # 49 | 33 | 419.31 GWh |
| District of Columbia | # 51 | 16 | 16.99 GWh |
| Florida | # 2 | 323 | 24,446.09 GWh |
| Georgia | # 8 | 266 | 11,628.97 GWh |
| Hawaii | # 47 | 73 | 826.54 GWh |
| Idaho | # 44 | 148 | 1,495.33 GWh |
| Illinois | # 5 | 385 | 14,642.93 GWh |
| Indiana | # 14 | 213 | 8,730.35 GWh |
| Iowa | # 26 | 295 | 5,224.35 GWh |
| Kansas | # 25 | 189 | 5,250.86 GWh |
| Kentucky | # 23 | 60 | 5,806.86 GWh |
| Louisiana | # 13 | 87 | 9,343.34 GWh |
| Maine | # 45 | 217 | 1,135.36 GWh |
| Maryland | # 39 | 204 | 2,935.42 GWh |
| Massachusetts | # 41 | 652 | 1,746.92 GWh |
| Michigan | # 11 | 279 | 10,468.02 GWh |
| Minnesota | # 29 | 769 | 4,717.95 GWh |
| Mississippi | # 20 | 58 | 6,625.37 GWh |
| Missouri | # 22 | 128 | 5,843.17 GWh |
| State | Rank | Active Plants | Sep 2025 Generation |
|---|---|---|---|
| Montana | # 40 | 72 | 1,949.24 GWh |
| Nebraska | # 34 | 132 | 3,501.38 GWh |
| Nevada | # 31 | 114 | 4,053.88 GWh |
| New Hampshire | # 42 | 60 | 1,549.07 GWh |
| New Jersey | # 27 | 399 | 4,969.45 GWh |
| New Mexico | # 36 | 145 | 3,317.84 GWh |
| New York | # 12 | 966 | 10,145.62 GWh |
| North Carolina | # 10 | 917 | 11,211.15 GWh |
| North Dakota | # 37 | 60 | 3,089.17 GWh |
| Ohio | # 6 | 201 | 12,818.31 GWh |
| Oklahoma | # 17 | 143 | 7,364.05 GWh |
| Oregon | # 28 | 282 | 4,812.51 GWh |
| Pennsylvania | # 3 | 260 | 19,731.43 GWh |
| Rhode Island | # 46 | 100 | 863.62 GWh |
| South Carolina | # 16 | 207 | 7,861.23 GWh |
| South Dakota | # 43 | 52 | 1,535.17 GWh |
| Tennessee | # 19 | 88 | 6,829.06 GWh |
| Texas | # 1 | 946 | 51,969.48 GWh |
| Utah | # 35 | 126 | 3,419.48 GWh |
| Vermont | # 50 | 120 | 165.14 GWh |
| Virginia | # 15 | 241 | 8,580.52 GWh |
| Washington | # 18 | 138 | 7,120.43 GWh |
| West Virginia | # 38 | 39 | 3,057.29 GWh |
| Wisconsin | # 24 | 251 | 5,674.74 GWh |
| Wyoming | # 33 | 73 | 3,641.70 GWh |