Adams PV Plant
529 County Road M, Adams, WI 53936Plant Summary Information
Adams PV Plant is ranked #23 out of 91 solar farms in Wisconsin in terms of total annual net electricity generation.
Adams PV Plant generated 4.2 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Adams PV Plant |
---|---|
Utility Name | Adams PV Plant (WI) |
Location | Adams County, WI |
Initial Operation Date | July 2023 |
Last Update | Dec 2024 |
Annual Generation | 16.8 GWh |
Annual Consumption | 57.3 k MMBtu |
Ranked #5,412 out of 12,299 Power Plants Nationwide | |
Ranked #1,443 out of 6,182 Solar Power Plants Nationwide | |
Ranked #112 out of 239 Wisconsin Power Plants | |
Ranked #23 out of 91 Wisconsin Solar Power Plants | |
Fuel Types | Solar |
Map of Adams PV Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Adams PV Plant.
Monthly Net Generation for Adams PV Plant
Adams PV Plant Details
Summary Information | |
---|---|
Plant Name | Adams PV Plant (67596) |
Plant Address | 529 County Road M, Adams, WI 53936 |
Utility | Adams PV Plant (WI) (66286) |
Latitude, Longitude | 43.95014, -89.68088 |
Generation Dates on File | Jan 2024 to Dec 2024 |
Initial Operation Date | July 2023 |
Annual Generation | 16.8 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | MRO |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Wisconsin Power & Light Co (20856) WI |
Grid Voltage | 34.00 kV |
Energy Storage | No |
Generator AD329 Details Operating July 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 8.3 MW |
Summer Capacity | 7.1 MW |
Winter Capacity | 7.1 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Bifacial | Yes |
Azimuth Angle | 180 |
DC Net Capacity | 11 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 10 MW |
Virtual Net Metering Agreement | No |
Adams PV Plant Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1433 | Otero Solar | La Luz, NM | 17.1 GWh |
#1434 | Westside Solar | Rochester, MN | 17.0 GWh |
#1435 | Richmond 5 | Peru, IN | 17.0 GWh |
#1436 | McGraw Hill Solar | East Windsor Township, NJ | 16.9 GWh |
#1437 | Redstone Arsenal Hybrid | Huntsville, AL | 16.9 GWh |
#1438 | Leavenworth Greenworks LLC | Calverton, NY | 16.9 GWh |
#1439 | Shorthorn Holdings | McColl, SC | 16.9 GWh |
#1440 | Phantom Solar | Fort Hood, TX | 16.9 GWh |
#1441 | L&D Landfill Solar | Mt. Holly, NJ | 16.8 GWh |
#1442 | Dix Solar, L.L.C | Browns Mills, NJ | 16.8 GWh |
#1444 | Tracy Solar | Bailey, NC | 16.8 GWh |
#1445 | Anderson 3 | Anderson, IN | 16.8 GWh |
#1446 | Brighter Future Solar | Granite Falls, NC | 16.8 GWh |
#1447 | Cinnaminson Landfill Solar | Cinnaminson, NJ | 16.7 GWh |
#1448 | Centinela State Prison | Sacramento, CA | 16.7 GWh |
#1449 | Eddy II | Eddy, TX | 16.6 GWh |
#1450 | Gaston Solar I - SC | Gaston, SC | 16.6 GWh |
#1451 | Pittsfield Solar LLC | Pittsfield, ME | 16.5 GWh |
#1452 | Calipatria State Prison | Calipatria, CA | 16.5 GWh |
#1453 | Bovine | Wallis, TX | 16.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Adams PV Plant.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Biron | Biron, WI | 30.9 GWh | 33.6 mi |
Biron Mill | Wisconsin Rapids, WI | 95.7 GWh | 33.5 mi |
Castle Rock | Adams, WI | 91.9 GWh | 14.7 mi |
Columbia (WI) | Pardeville, WI | 5.4 TWh | 34.6 mi |
Elroy | Elroy, WI | 2.0 MWh | 32.7 mi |
Elroy Solar | Mauston, WI | 2.5 GWh | 22.8 mi |
Georgia-Pacific Corp - Nekoosa Mill | Nekoosa, WI | 193.6 GWh | 27.3 mi |
Kilbourn | Wisconsin Dells, WI | 57.6 GWh | 23 mi |
Lemonweir (Oak 1) | Mauston, WI | 5.9 GWh | 22.1 mi |
New Lisbon | New Lisbon, WI | 19.0 MWh | 24.6 mi |
New Lisbon Solar | New Lisbon, WI | 4.1 GWh | 23.1 mi |
Petenwell | Necedah, WI | 108.4 GWh | 18.5 mi |
Port Edwards Mill | Port Edwards, WI | 39.8 GWh | 28.2 mi |
Portage Solar Plant | Portage, WI | 22.8 GWh | 32.2 mi |
Stevens Point Mill | Stevens Point, WI | 12.7 GWh | 28.2 mi |
Wautoma Solar | Wautoma, WI | 188.3 GWh | 20.4 mi |
Webster Creek (Oak 2) | New Lisbon, WI | 2.9 GWh | 24.4 mi |
Whistling Winds DPC Solar | New Lisbon, WI | 2.9 GWh | 19.5 mi |
Wisconsin Rapids | Wisconsin Rapids, WI | 49.9 GWh | 31.5 mi |
Wood County | Nekoosa, WI | 277.9 GWh | 23.6 mi |