Algonquin Windsor Locks
26 Canal Bank Rd, Windsor Locks, CT 6096Plant Summary Information
Algonquin Windsor Locks is ranked #14 out of 158 power plants in Connecticut in terms of total annual net electricity generation.
Algonquin Windsor Locks is comprised of 3 generators and generated 30.6 GWh during the 3-month period between January 2025 to April 2025.
Plant Name | Algonquin Windsor Locks |
---|---|
Utility Name | Ahlstrom Power Windsor Locks LLC |
Location | Capitol Planning Region, CT |
Initial Operation Date | January 1990 |
Last Update | Apr 2025 |
Annual Generation | 118.4 GWh |
Annual Consumption | 1.6 M MMBtu |
Ranked #3,085 out of 12,299 Power Plants Nationwide | |
Ranked #867 out of 2,221 Natural Gas Power Plants Nationwide | |
Ranked #14 out of 158 Connecticut Power Plants | |
Ranked #11 out of 53 Connecticut Natural Gas Power Plants | |
Fuel Types | Natural Gas : 99.9% |
Previous Operator |
Algonquin Windsor Locks LLC (2013 to 2023) Ahlstrom Power Windsor Locks LLC (2024 to 2024) |
Map of Algonquin Windsor Locks
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Algonquin Windsor Locks.
Monthly Net Generation for Algonquin Windsor Locks
Algonquin Windsor Locks Details
Summary Information | |
---|---|
Plant Name | Algonquin Windsor Locks (10567) |
Plant Address | 26 Canal Bank Rd, Windsor Locks, CT 6096 |
Utility | Ahlstrom Power Windsor Locks LLC (291) |
Latitude, Longitude | 41.9227, -72.6255 |
Generation Dates on File | Jan 2001 to Apr 2025 |
Initial Operation Date | January 1990 |
Annual Generation | 118.4 GWh |
Fuel Types | Natural Gas : 99.9% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | Yes |
FERC Cogeneration Docket Number | 86-765-000 |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Utilities (22) |
Sector | IPP CHP (3) |
Water Source | Windsor Locks Canal |
Ash Impoundment | No |
Transmission / Distribution Owner | Connecticut Light & Power Co (4176) CT |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Natural Gas Information | |
Local Distribution Company (LDC) | YANKEE GAS SVC CO |
Natural Gas Storage | No |
Generator GTG Details Operating January 1990
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | 392 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 392 |
Nameplate Capacity | 40 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 35 MW |
Winter Capacity | 45 MW |
Minimum Load | 20 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1990 |
Combined Heat & Power | Yes |
Sector Name | IPP CHP (3) |
Topping Or Bottoming | T |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | Yes |
Cofire Fuels | Yes |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Cofire Energy Source | NG / DFO |
---|---|
Switch When Operating | Yes |
Net Summer Capacity With Natural Gas | 35 MW |
Net Winter Capacity With Natural Gas | 44 MW |
Net Summer Capacity With Oil | 35 MW |
Net Winter Capacity With Oil | 44 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator STG Details Operating January 1990
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | CC1 |
Ownership | Single Owner |
Duct Burners | No |
RTO ISO LMP Node Designation | 392 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 392 |
Nameplate Capacity | 16 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 16 MW |
Winter Capacity | 16 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 1990 |
Combined Heat & Power | Yes |
Sector Name | IPP CHP (3) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator GTG2 Details Operating July 2012
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | CC1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | 392 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 392 |
Nameplate Capacity | 15 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 13 MW |
Winter Capacity | 15 MW |
Minimum Load | 9 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2012 |
Combined Heat & Power | Yes |
Sector Name | IPP CHP (3) |
Topping Or Bottoming | T |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Algonquin Windsor Locks Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#857 | Crossroads Energy Center | Clarksdale, MS | 123.5 GWh |
#858 | UCONN Cogen Facility | Storrs, CT | 124.8 GWh |
#859 | Purdue CHP | West Lafayette, IN | 123.1 GWh |
#860 | Dickerson Power | Dickerson, MD | 126.5 GWh |
#861 | Woodland Pulp, LLC | Baileyville, ME | 366.6 GWh |
#862 | Lordsburg Generating | Lordsburg, NM | 120.4 GWh |
#863 | Mooreland | Mooreland, OK | 119.8 GWh |
#864 | International Paper Valliant OK | Valliant, OK | 417.4 GWh |
#865 | Concord | Watertown, WI | 119.8 GWh |
#866 | Marsh Landing Generating Station | Antioch, CA | 118.9 GWh |
#868 | Pittsburgh Airport Gas Plant | Coraopolis, PA | 117.5 GWh |
#869 | Ray Olinger | Navada, TX | 117.4 GWh |
#870 | Vernon Boulevard | Long Island City, NY | 117.2 GWh |
#871 | Lee Energy Facility | Dixon, IL | 116.8 GWh |
#872 | James River Power Station | Springfield, MO | 123.0 GWh |
#873 | Kansas Ethanol, LLC | Lyons, KS | 116.3 GWh |
#874 | BYU Central Heating Plant | Provo, UT | 115.6 GWh |
#875 | Peno Creek | Bowling Green, MO | 118.5 GWh |
#876 | Lange Generating Station | Rapid City, SD | 115.4 GWh |
#877 | Chamon Power LLC | Houston, TX | 114.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Algonquin Windsor Locks.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Advance Stores Company, Inc | Enfield, CT | 1.1 GWh | 8.6 mi |
ALDI DC 2 | South Windsor, CT | 1.4 GWh | 4.7 mi |
Berkshire Power | Agawam, MA | 573.3 GWh | 8.7 mi |
Bradley Energy Center | Windsor Locks, CT | 11.8 GWh | 3 mi |
Canis Major Solar Farm | Suffield, CT | 3.6 GWh | 6.1 mi |
East Windsor Solar One | East Windsor, CT | 8.5 GWh | 6 mi |
Enfield Solar One | Hartford, CT | 5.5 GWh | 7.2 mi |
ENGIE 2019 ProjectCo-MA1, LLC | Agawam, MA | 6.4 GWh | 8.3 mi |
Gravel Pit Solar, LLC | East Windsor, CT | 19.9 GWh | 4.6 mi |
Hartford Landfill Solar EGF | Hartford, CT | 1.2 GWh | 9.2 mi |
Niagara Bottling - Bloomfield | Bloomfield, CT | 4.5 GWh | 6.6 mi |
Norcap North | East Windsor, CT | 3.5 GWh | 5 mi |
Norcap South | East Windsor, CT | 3.6 GWh | 5 mi |
Nutmeg Solar | Enfield, CT | 34.4 GWh | 6.9 mi |
Pepperidge Farm Bloomfield | Bloomfield, CT | 15.5 GWh | 6 mi |
Powder Hill | Enfield, CT | 3.3 GWh | 6 mi |
Raffia Road Solar Project | Enfield, CT | 11.0 MWh | 4.4 mi |
Rainbow (CT) | Windsor, CT | 19.6 GWh | 3.5 mi |
South Windsor Fuel Cell | South Windsor, CT | 38.9 GWh | 7.4 mi |
Southington Solar One | Southington, CT | 8.8 GWh | 6 mi |