Airport Solar
17819 Airport Road, Lakeview, OR 97630Plant Summary Information
Airport Solar is ranked #7 out of 130 solar farms in Oregon in terms of total annual net electricity generation.
Airport Solar generated 30.5 GWh during the 3-month period between July 2025 to October 2025.
| Plant Name | Airport Solar |
|---|---|
| Utility Name | Airport Solar LLC |
| Location | Lake County, OR |
| Initial Operation Date | December 2019 |
| Last Update | Oct 2025 |
| Annual Generation | 102.9 GWh |
| Annual Consumption | 375.1 k MMBtu |
| Ranked #3,379 out of 12,553 Power Plants Nationwide | |
| Ranked #799 out of 6,410 Solar Power Plants Nationwide | |
| Ranked #67 out of 274 Oregon Power Plants | |
| Ranked #7 out of 130 Oregon Solar Power Plants | |
| Fuel Types | Solar |
Map of Airport Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Airport Solar.
Monthly Net Generation for Airport Solar
Airport Solar Details
| Summary Information | |
|---|---|
| Plant Name | Airport Solar (62560) |
| Plant Address | 17819 Airport Road, Lakeview, OR 97630 |
| Utility | Airport Solar LLC (62051) |
| Latitude, Longitude | 42.17018, -120.40232 |
| Generation Dates on File | Dec 2019 to Oct 2025 |
| Initial Operation Date | December 2019 |
| Annual Generation | 102.9 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | PacifiCorp - West (PACW) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | PacifiCorp (14354) OR |
| Grid Voltage | 115.00 kV |
| Energy Storage | No |
Generator APS Details Operating December 2019
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 47.3 MW |
| Summer Capacity | 47.3 MW |
| Winter Capacity | 47.3 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2019 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Other Solar Technology | No |
| Azimuth Angle | 90 |
| DC Net Capacity | 61 MW |
| Crystalline Silicon | Yes |
| Thin Film CDTE | No |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Airport Solar Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #789 | Pitts Dudik Solar | Hubbard, TX | 105.3 GWh |
| #790 | Salt City Solar Project - Hybrid | Circleville, OH | 104.6 GWh |
| #791 | Riverside Solar | Ruskin, FL | 104.6 GWh |
| #792 | Wythe County Solar | Wythe County, VA | 104.4 GWh |
| #793 | Edwards Sanborn S1 | Mojave, CA | 100.6 GWh |
| #794 | Foothills Solar Plant Hybrid | Yuma, AZ | 97.8 GWh |
| #795 | Luna Valley | Mendota, CA | 103.9 GWh |
| #796 | Elevation Solar C | Lancaster, CA | 103.3 GWh |
| #797 | Mountain View Solar (FL) | Dade City, FL | 103.1 GWh |
| #798 | Bladen Solar | Fayetteville, NC | 103.0 GWh |
| #800 | Luning Energy | Luning, NV | 102.2 GWh |
| #801 | Broad River Solar, LLC | Mooresboro, NC | 102.0 GWh |
| #802 | Red Horse 2 | Willcox, AZ | 147.2 GWh |
| #803 | Flat Fork Solar | Wheatley, AR | 101.7 GWh |
| #804 | Kimmel Road Solar, LLC | Du Quoin, IL | 101.6 GWh |
| #805 | Bullock Solar, LLC | Manson, NC | 101.0 GWh |
| #806 | Ranchland Solar, LLC | Moyock, NC | 100.1 GWh |
| #807 | Waipio Solar | Waipio, HI | 99.8 GWh |
| #808 | Pearl Solar | Fort Stockton, TX | 99.4 GWh |
| #809 | Blue Harvest Solar Park | Continental, OH | 99.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Airport Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| BC Solar | Lakeview, OR | 15.2 GWh | 2.2 mi |
| Black Cap Solar Plant | Lakeview, OR | 3.9 GWh | 2.1 mi |
| Bly Solar Center | Bly, OR | 18.2 GWh | 35.3 mi |
| C-Drop Hydro | Klamath Falls, OR | 574.0 MWh | 65.7 mi |
| Garrett Solar | Lakeview, OR | 22.7 GWh | 0.7 mi |
| Klamath Cogeneration Plant | Klamath Falls, OR | 3.1 TWh | 72.1 mi |
| Klamath Expansion Project | Klamath Falls, OR | 132.3 GWh | 72.3 mi |
| Klamath Falls Solar 2 CSG | Klamath Falls, OR | 6.7 GWh | 69.7 mi |
| Linkville Solar (CSG) | Klamath Falls, OR | 3.9 GWh | 72.3 mi |
| NorWest Energy 4, LLC | Bonanza, OR | 9.5 GWh | 71.6 mi |
| Old Mill Solar | Bly, OR | 7.2 GWh | 33.1 mi |
| OR Solar 3, LLC | Malin, OR | 22.7 GWh | 53.1 mi |
| OR Solar 5, LLC | Merrill, OR | 18.3 GWh | 62.7 mi |
| OR Solar 6, LLC | Lakeview, OR | 22.2 GWh | 3.2 mi |
| OR Solar 8, LLC | Dairy, OR | 21.0 GWh | 60.8 mi |
| Oregon University System OIT Klamath Fal | Klamath Falls, OR | 2.5 GWh | 71 mi |
| Outback Solar At Christmas Valley | Christmas Valley, OR | 6.6 GWh | 73.8 mi |
| Skysol | Merrill, OR | 115.7 GWh | 56.5 mi |
| Sprague Hydro | Bly, OR | 2.3 GWh | 37.7 mi |
| Woodline Solar | Dairy, OR | 14.9 GWh | 60.3 mi |