Annese Solar Project Hybrid CSG is ranked #37 out of 541 solar farms in Massachusetts in terms of total annual net electricity generation.

Annese Solar Project Hybrid CSG generated 1.5 GWh during the 3-month period between September 2025 to December 2025.

Plant NameAnnese Solar Project Hybrid CSG
Utility NameAES Distributed Energy
LocationWorcester County, MA
Initial Operation DateDecember 2020
Last Update Dec 2025
Annual Generation 8.1 GWh
Annual Consumption 27.8 k MMBtu
Ranked #6,949 out of 13,081 Power Plants Nationwide
Ranked #2,555 out of 7,015 Solar Power Plants Nationwide
Ranked #95 out of 648 Massachusetts Power Plants
Ranked #37 out of 541 Massachusetts Solar Power Plants
Fuel Types Solar : 99.1% Electricity used for energy storage : 0.9%

Map of Annese Solar Project Hybrid CSG

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Annese Solar Project Hybrid CSG.

Create Your Account Today

Monthly Net Generation for Annese Solar Project Hybrid CSG

Monthly Plant Fuel Consumption for Annese Solar Project Hybrid CSG

Annese Solar Project Hybrid CSG Details

Summary Information
Plant NameAnnese Solar Project Hybrid CSG (63474)
Plant Address348 Dresser Hill Road, Southbridge, MA 1550
UtilityAES Distributed Energy (61012)
Latitude, Longitude42.0755, -72.0052
Generation Dates on FileJan 2021 to Dec 2025
Initial Operation DateDecember 2020
Annual Generation 8.1 GWh
Fuel Types Solar : 99.1% Electricity used for energy storage : 0.9%
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionNPCC
Balancing AuthorityISO New England Inc. (ISNE)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment
Transmission / Distribution OwnerMassachusetts Electric Co (11804) MA
Grid Voltage 13.80 kV
Energy StorageYes

Generator ANNES Details Operating December 2020

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity4.3 MW
Summer Capacity4.3 MW
Winter Capacity4.3 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateDecember 2020
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Time From Cold Shutdown To Full Load10M
Solar Details
Fixed TiltYes
Azimuth Angle13
Tilt Angle26
DC Net Capacity7 MW
Crystalline SiliconYes
Net Metering AgreementNo
Virtual Net Metering AgreementYes
Virtual Net Metering DC Capacity7 MW

Generator BATT Details Operating December 2020

TechnologyBatteries
Prime MoverBattery
OwnershipSingle Owner
Nameplate Capacity3.5 MW
Summer Capacity3.5 MW
Winter Capacity3.5 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateDecember 2020
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceElectricity used for energy storage
Time From Cold Shutdown To Full Load10M
Energy Storage Details
Nameplate Energy Capacity MWH6.7
Maximum Charge Rate3.5 MW
Maximum Discharge Rate3.5 MW
Storage TechnologyLIB
Nameplate Reactive Power Rating0.9
Storage Enclosure TypeCS
System Peak ShavingYes
Excess Wind And Solar GenerationP
DC Tightly CoupledYes
Direct Support Of Another UnitYes
Direct Support Plant Id63474
Direct Support Gen IdANNES
Support T D AssetNo

Annese Solar Project Hybrid CSG Plant Owners

Owner NameAddressGeneratorOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#2545Gopher CSGTaylor Falls, MN8.0 GWh
#2546Lenoir Farm 2Kinston, NC8.0 GWh
#2547Chadbourn FarmWhiteville, NC8.0 GWh
#2548Waterville CSG Solar Holdings LLCWaterville, MN8.0 GWh
#2549GSPP 4643 Twelve Corners Road, LLCAuburn, NY8.0 GWh
#2550Sugar Hill Solar 1Clifton Park, NY8.0 GWh
#2551Vega Community SolarGlenwood, MN8.0 GWh
#2552Main Rd Community SolarNewstead, NY8.0 GWh
#2553Lake HermanBenicia, CA8.0 GWh
#2554Pine HillJohnston, RI8.0 GWh
#2556Finney SolarFort Johnson, NY8.0 GWh
#2557West Creek SolarNewark Valley, NY8.0 GWh
#2558Charlotte SolarForest City, NC8.0 GWh
#2559Wheatland 2B SolarScottsville, NY8.0 GWh
#2560Dundas Solar Holdings LLC CSGNorthfield, MN8.0 GWh
#2561Millers Chapel SolarLa Grange, NC8.0 GWh
#2562ACE-Stanton A PVOrlando, FL8.0 GWh
#2563Sonne TwoNewton, NC8.0 GWh
#2564RT405 Westerlo Solar 2Albany, NY8.0 GWh
#2565Turquoise Liberty SolarSparks, NV7.9 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Annese Solar Project Hybrid CSG.

Plant NamePlant LocationAnnual GenerationDistance
Alicea Solar Project Hybrid CSGSouthbridge, MA4.0 GWh0.5 mi
BWC Origination 8 LLC Sturbridge 1Sturbridge, MA1.2 GWh4.3 mi
BWC Origination 8 LLC Sturbridge 2Sturbridge, MA1.3 GWh4.5 mi
Charlton Solar I CSGCharlton, MA5.3 GWh3.6 mi
Cohasse Solar, LLC CSGSouthbridge, MA1.5 GWh2.4 mi
Dresser Hill CSGSouthbridge, MA6.1 GWh0.4 mi
DudleyDudley, MA7.5 GWh2 mi
Dudley River 2 Solar, LLC CSGSouthbridge, MA1.6 GWh0.5 mi
Dudley River 3 Solar, LLC CSGSouthbridge, MA1.7 GWh0.5 mi
Dudley River Solar, LLC CSGSouthbridge, MA1.6 GWh0.4 mi
Dudley Solar CSGDudley, MA2.8 GWh4.5 mi
Farley Road Community SolarDudley, MA1.6 GWh1.7 mi
Incom Solar, LLC CSGCharlton, MA3.2 GWh2.3 mi
Millennium PowerCharlton, MA995.2 GWh2.6 mi
Sampson Road Community SolarCharlton, MA3.1 GWh1.7 mi
Southbridge Landfill Gas-to-EnergySouthbridge, MA9.6 GWh2.4 mi
Southbridge PVSouthbridge, MA3.8 GWh2 mi
Southbridge SolarSouthbridge, MA2.2 GWh1.1 mi
West A&B Solar Project Hybrid CSGSouthbridge, MA4.7 GWh0.1 mi
ZPD-PT Solar Project 2017-023 LLC HybridSouthbridge, MA4.0 GWh0.5 mi