AES Pelletier Solar, LLC

624 West Main St, Fort Kent, ME 4743

Plant Summary Information

AES Pelletier Solar, LLC is ranked #81 out of 119 solar farms in Maine in terms of total annual net electricity generation.

AES Pelletier Solar, LLC generated 627.0 MWh during the 3-month period between September 2024 to December 2024.

Plant NameAES Pelletier Solar, LLC
Utility NameAES Clean Energy
LocationAroostook County, ME
Initial Operation DateMay 2023
Last Update Dec 2024
Annual Generation 3.6 GWh
Annual Consumption 12.3 k MMBtu
Ranked #8,933 out of 12,539 Power Plants Nationwide
Ranked #3,901 out of 6,400 Solar Power Plants Nationwide
Ranked #164 out of 211 Maine Power Plants
Ranked #81 out of 119 Maine Solar Power Plants
Fuel Types Solar

Map of AES Pelletier Solar, LLC

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for AES Pelletier Solar, LLC.

Create Your Account Today

Monthly Net Generation for AES Pelletier Solar, LLC

AES Pelletier Solar, LLC Details

Summary Information
Plant NameAES Pelletier Solar, LLC (66135)
Plant Address624 West Main St, Fort Kent, ME 4743
UtilityAES Clean Energy (64904)
Latitude, Longitude47.2355, -68.6183
Generation Dates on FileApr 2023 to Dec 2024
Initial Operation DateMay 2023
Annual Generation 3.6 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionNPCC
Balancing AuthorityNew Brunswick System Operator (NBSO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment
Transmission / Distribution OwnerVersant Power (1179) ME
Grid Voltage 34.50 kV
Energy StorageNo

Generator PELLR Details Operating May 2023

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity4 MW
Summer Capacity4 MW
Winter Capacity4 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateMay 2023
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solar Details
Fixed TiltYes
Azimuth Angle180
Tilt Angle25
DC Net Capacity4.7 MW
Crystalline SiliconYes
Net Metering AgreementNo
Virtual Net Metering AgreementNo

AES Pelletier Solar, LLC Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#3891Canton GLC Solar, LLCCanton, ME3.6 GWh
#3892Golden SolarSt. Johnsbury, VT3.6 GWh
#3893Pivot Solar 7 LLC (CSG)Rifle, CO3.6 GWh
#3894Spooner Solar ArraySpooner, WI3.6 GWh
#3895Redbrook Community Solar 1Plympton, MA3.6 GWh
#3896Jessamine SolarMarion, SC3.6 GWh
#3897CMR Solar LLCPine Bush, NY3.6 GWh
#3898Oak Leaf - CSG Portfolio (OL 44)Watkins, CO3.6 GWh
#3899VulcanKankakee, IL3.6 GWh
#3900Ameresco Danville Solar, LLCTilton, IL3.6 GWh
#3902Oak Leaf Solar XXXIII LLC (Lantz)Salida, CO3.6 GWh
#3903Kearsarge GranbyGranby, MA3.6 GWh
#3904Oak Leaf Solar XXV LLC (CSG)Watkins, CO3.6 GWh
#3905Mtn. Solar 3 CSGBrush, CO3.6 GWh
#3906Columbia University - MinisinkMinisink, NY3.6 GWh
#3907IGS Solar I - EWR5Avenel, NJ3.6 GWh
#3908Mount Hope WestMount Hope, NY3.6 GWh
#3909Middletown NY 1Middletown, NY3.6 GWh
#3910Athens RidgeAthens, ME3.6 GWh
#3911Ballston Solar LLCSheridan, OR3.6 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding AES Pelletier Solar, LLC.

Plant NamePlant LocationAnnual GenerationDistance
AES Daigle Solar, LLCFort Kent, ME6.7 GWh3.7 mi
CaribouCaribou, ME6.3 GWh35.1 mi
Easton CSG 1 LLCEaston, ME5.2 GWh52.9 mi
Fort FairfieldFort Fairfield, ME8.1 GWh48.2 mi
Great Lakes Hydro America - MEMillinocket, ME570.9 GWh109.8 mi
Limestone CSG 1 LLCLimestone, ME5.0 MWh42.1 mi
Limestone CSG 2 LLCLimestone, ME62.0 MWh42.5 mi
LoringLimestone, ME6.1 GWh38.4 mi
Mars HillMars Hill, ME95.0 MWh60.6 mi
Mars Hill Wind Farm ProjectMars Hill, ME118.9 GWh61.1 mi
ME - Novel (Lighthouse Ph I) Mars HillWestfield, ME22.0 MWh56.6 mi
ME Novel Lighthouse - Huggard Ave SolarLimestone, ME2.5 GWh43.1 mi
ME Novel Lighthouse - Penobscot CSGPatten, ME812.0 MWh85.7 mi
Mechanic Street (CSG)Presque Island, ME3.0 MWh46.9 mi
Medway HydroMedway, ME23.3 GWh112.6 mi
Missile Street (CSG)Presque Island, ME4.0 MWh45.5 mi
Oakfield Wind ProjectCity of Oakfield, ME367.0 GWh84.4 mi
Skyway Avenue Solar FarmFrenchville, ME1.5 GWh12.4 mi
Squa Pan Hydro StationMasardis, ME426.0 MWh48.9 mi
Twin Rivers Paper Co LLCMadawaska, ME99.1 GWh15.9 mi