Swift Air Solar I
14991 S. Wheeler Rd, Goldsmith, TX 79741Plant Summary Information
Swift Air Solar I is ranked #76 out of 245 solar farms in Texas in terms of total annual net electricity generation.
Swift Air Solar I generated 103.6 GWh during the 3-month period between February 2026 to May 2026.
| Plant Name | Swift Air Solar I |
|---|---|
| Utility Name | Origis Energy USA, Inc |
| Location | Ector County, TX |
| Initial Operation Date | April 2025 |
| Last Update | May 2026 |
| Annual Generation | 398.2 GWh |
| Annual Consumption | 1.5 M MMBtu |
| Ranked #1,632 out of 13,081 Power Plants Nationwide | |
| Ranked #189 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #338 out of 852 Texas Power Plants | |
| Ranked #76 out of 245 Texas Solar Power Plants | |
| Fuel Types | Solar |
Map of Swift Air Solar I
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Swift Air Solar I.
Monthly Net Generation for Swift Air Solar I
Monthly Plant Fuel Consumption for Swift Air Solar I
Swift Air Solar I Details
| Summary Information | |
|---|---|
| Plant Name | Swift Air Solar I (68537) |
| Plant Address | 14991 S. Wheeler Rd, Goldsmith, TX 79741 |
| Utility | Origis Energy USA, Inc (58764) |
| Latitude, Longitude | 31.7688, -102.696 |
| Generation Dates on File | Apr 2025 to May 2026 |
| Initial Operation Date | April 2025 |
| Annual Generation | 398.2 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | NA |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
Generator OSAS1 Details Operating April 2025
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 145 MW |
| Summer Capacity | 145 MW |
| Winter Capacity | 145 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | April 2025 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Fixed Tilt | No |
| Parabolic Trough | No |
| Bifacial | No |
| DC Net Capacity | 184 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Swift Air Solar I Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #179 | Bellefield Solar and Energy Storage Farm | Mojave, CA | 381.8 GWh |
| #180 | Brazoria County Solar Project (Danciger) | Damon, TX | 411.3 GWh |
| #181 | AP Sunray LLC | Knippa, TX | 409.3 GWh |
| #182 | Scarlet II Hybrid | Cantua Creek, CA | 387.0 GWh |
| #183 | Posey Solar | Mount Vernon, IN | 405.0 GWh |
| #184 | Misae Solar | Childress, TX | 405.0 GWh |
| #185 | Madison Fields Solar Project, LLC | Irwin, OH | 403.2 GWh |
| #186 | Sun Streams, LLC | Arlington, AZ | 402.8 GWh |
| #187 | Hornshadow Solar II, LLC | Castle Dale, UT | 399.5 GWh |
| #188 | Maverick Solar 7, LLC | Desert Center, CA | 398.2 GWh |
| #190 | Green River Solar | Guston, KY | 398.2 GWh |
| #191 | Springbok Solar Farm 2 | Cantil, CA | 397.1 GWh |
| #192 | Big Plain Solar, LLC | London, OH | 395.3 GWh |
| #193 | Crane Solar Project | Crane, TX | 395.1 GWh |
| #194 | Chestnut | Lemoore, CA | 370.2 GWh |
| #195 | Riverstart Solar Park LLC | Modoc, IN | 392.8 GWh |
| #196 | Yellow Pine II | Enterprise, NV | 377.5 GWh |
| #197 | Mesquite Solar 1 | Tonopah, AZ | 392.2 GWh |
| #198 | Wright Solar Park | Los Banos, CA | 392.1 GWh |
| #199 | Crooked Lake Solar, LLC | Blytheville, AR | 391.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Swift Air Solar I.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| 2W Permian Solar Project Hybrid | Andrews, TX | 1.0 TWh | 25.9 mi |
| Bakke | Andrews, TX | 107.0 MWh | 37.6 mi |
| Ector County Energy Center | Goldsmith, TX | 934.6 GWh | 21.7 mi |
| Goldsmith | Goldsmith, TX | 101.0 MWh | 14.7 mi |
| N. Mary Francis | Odessa, TX | 116.0 MWh | 18.8 mi |
| Notrees Windpower Hybrid | Goldsmith, TX | 220.4 GWh | 17.5 mi |
| Oberon IA | Odessa, TX | 262.9 GWh | 4.5 mi |
| Oberon IB | Odessa, TX | 47.8 GWh | 5.3 mi |
| Odessa-Ector Power Plant | Odessa, TX | 8.5 TWh | 22.3 mi |
| Oxy Renewable Energy - Goldsmith | Goldsmith, TX | 38.8 GWh | 16.5 mi |
| Permian Basin | Monahans, TX | 669.5 GWh | 20.3 mi |
| Phoebe Solar | Kermit, TX | 515.5 GWh | 11.4 mi |
| Prospero Solar | Andrews, TX | 694.4 GWh | 36.8 mi |
| Prospero Solar II | Andrews, TX | 654.3 GWh | 36.1 mi |
| Quail Run Energy Center | Odessa, TX | 3.1 TWh | 22.9 mi |
| SPS1 Dollarhide | Jal, NM | 22.5 GWh | 35.8 mi |
| SPS2 Jal | Jal, NM | 21.8 GWh | 40.5 mi |
| Swift Air Solar II | Odessa, TX | 179.7 GWh | 10.8 mi |
| Swift Air Solar III | Odessa, TX | 123.0 GWh | 10.8 mi |
| Westover | Odessa, TX | 100.0 MWh | 15.4 mi |