Taygete Energy Project LLC
TBD, Coyanosa, TX 79730Plant Summary Information
Taygete Energy Project LLC is ranked #32 out of 219 solar farms in Texas in terms of total annual net electricity generation.
Taygete Energy Project LLC generated 95.4 GWh during the 3-month period between December 2025 to March 2026.
| Plant Name | Taygete Energy Project LLC |
|---|---|
| Utility Name | Taygete Energy Project LLC |
| Location | Pecos County, TX |
| Initial Operation Date | March 2021 |
| Last Update | Mar 2026 |
| Annual Generation | 545.8 GWh |
| Annual Consumption | 2.0 M MMBtu |
| Ranked #1,264 out of 12,332 Power Plants Nationwide | |
| Ranked #91 out of 6,397 Solar Power Plants Nationwide | |
| Ranked #247 out of 814 Texas Power Plants | |
| Ranked #32 out of 219 Texas Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
7X Energy, Inc. (2018 to 2022) Taygete Energy Project LLC (2023 to 2024) |
Map of Taygete Energy Project LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Taygete Energy Project LLC.
Monthly Net Generation for Taygete Energy Project LLC
Monthly Plant Fuel Consumption for Taygete Energy Project LLC
Taygete Energy Project LLC Details
| Summary Information | |
|---|---|
| Plant Name | Taygete Energy Project LLC (62483) |
| Plant Address | TBD, Coyanosa, TX 79730 |
| Utility | Taygete Energy Project LLC (65925) |
| Latitude, Longitude | 31.16525, -103.12587 |
| Generation Dates on File | Jan 2021 to Mar 2026 |
| Initial Operation Date | March 2021 |
| Annual Generation | 545.8 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | AEP Texas Central Company (3278) TX |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
Generator PV1 Details Operating March 2021
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 255 MW |
| Summer Capacity | 255 MW |
| Winter Capacity | 255 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | March 2021 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Tilt Angle | 60 |
| DC Net Capacity | 344.1 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Taygete Energy Project LLC Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| TE Taygete Energy HoldCo, LLC | 3809 Juniper Trace, Suite 100, Austin, TX 78738 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #81 | AV Solar Ranch One | Lancaster, CA | 564.4 GWh |
| #82 | SR Toombs, LLC | Vidalia, GA | 561.3 GWh |
| #83 | McFarland A Solar and Storage | Dateland, AZ | 552.9 GWh |
| #84 | Golden Field Solar III, LLC | Rosamond, CA | 538.9 GWh |
| #85 | Orion II Solar Project | Rosebud, TX | 559.8 GWh |
| #86 | Fort Bend Solar LLC | East Bernard, TX | 558.5 GWh |
| #87 | Oxbow Solar 1 | New Roads, LA | 556.4 GWh |
| #88 | Desert Sunlight 250, LLC | Desert Center, CA | 555.7 GWh |
| #89 | Orion III Solar Project | Buckholts, TX | 553.9 GWh |
| #90 | Dodge Flat | Reno, NV | 546.6 GWh |
| #92 | Thunder Wolf Energy Center Hybrid | Avondale, CO | 530.5 GWh |
| #93 | Stampede Solar Hybrid | Saltillo, TX | 532.1 GWh |
| #94 | Daggett 2 | Daggett, CA | 523.5 GWh |
| #95 | Galloway 1 Solar Farm | Paint Rock, TX | 536.6 GWh |
| #96 | Phoebe Solar | Kermit, TX | 529.6 GWh |
| #97 | Porter Solar, LLC (TX) | Krum, TX | 527.9 GWh |
| #98 | Escalante (NM) | Grants, NM | 527.6 GWh |
| #99 | Brittlebush Solar | Coolidge, AZ | 527.5 GWh |
| #100 | 7V Solar Ranch | Muldoon, TX | 527.3 GWh |
| #101 | Hardin Solar III | Alger, OH | 526.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Taygete Energy Project LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Barilla Solar | Fort Stockton, TX | 53.7 GWh | 19.4 mi |
| Castle Gap Solar Hybrid | McCarney, TX | 368.4 GWh | 50.8 mi |
| Crane Solar Project | Crane, TX | 403.8 GWh | 48.5 mi |
| East Pecos Solar | McCamey, TX | 222.0 GWh | 51.2 mi |
| Emerald Grove | Crane, TX | 250.1 GWh | 45.6 mi |
| Greasewood II LLC | Girvin, TX | 857.2 GWh | 31 mi |
| Greasewood Solar | Fort Stockton, TX | 433.4 GWh | 38.8 mi |
| Oberon IA | Odessa, TX | 283.8 GWh | 44.8 mi |
| Oberon IB | Odessa, TX | 54.4 GWh | 44.3 mi |
| Permian Basin | Monahans, TX | 464.5 GWh | 30.5 mi |
| Phoebe Solar | Kermit, TX | 529.6 GWh | 49.3 mi |
| RE Roserock | Fort Stockton, TX | 371.7 GWh | 17.8 mi |
| Sherbino II | Ft. Stockton, TX | 570.6 GWh | 45.7 mi |
| Swift Air Solar I | Goldsmith, TX | 402.4 GWh | 48.8 mi |
| Taygete II Energy Project | Coyanosa, TX | 470.1 GWh | 1.4 mi |
| Upton County Solar | McCamey, TX | 283.0 GWh | 49.7 mi |
| WAL897 | Fort Stockton, TX | 103.0 MWh | 22.6 mi |
| West of the Pecos Solar | TBD, TX | 234.1 GWh | 40.1 mi |
| Woodward Mountain I | Girvin, TX | 168.0 GWh | 44.6 mi |
| Woodward Mountain II | Girvin, TX | 168.0 GWh | 44.6 mi |