Taygete Energy Project LLC
TBD, Coyanosa, TX 79730Plant Summary Information
Taygete Energy Project LLC is ranked #31 out of 190 solar farms in Texas in terms of total annual net electricity generation.
Taygete Energy Project LLC generated 114.8 GWh during the 3-month period between January 2025 to April 2025.
Plant Name | Taygete Energy Project LLC |
---|---|
Utility Name | Taygete Energy Project LLC |
Location | Pecos County, TX |
Initial Operation Date | March 2021 |
Last Update | Apr 2025 |
Annual Generation | 458.6 GWh |
Annual Consumption | 1.7 M MMBtu |
Ranked #1,397 out of 12,299 Power Plants Nationwide | |
Ranked #88 out of 6,182 Solar Power Plants Nationwide | |
Ranked #272 out of 792 Texas Power Plants | |
Ranked #31 out of 190 Texas Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
7X Energy, Inc. (2018 to 2022) Taygete Energy Project LLC (2023 to 2024) |
Map of Taygete Energy Project LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Taygete Energy Project LLC.
Monthly Net Generation for Taygete Energy Project LLC
Taygete Energy Project LLC Details
Summary Information | |
---|---|
Plant Name | Taygete Energy Project LLC (62483) |
Plant Address | TBD, Coyanosa, TX 79730 |
Utility | Taygete Energy Project LLC (65925) |
Latitude, Longitude | 31.16525, -103.12587 |
Generation Dates on File | Jan 2021 to Apr 2025 |
Initial Operation Date | March 2021 |
Annual Generation | 458.6 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | AEP Texas Central Company (3278) TX |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator PV1 Details Operating March 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 255 MW |
Summer Capacity | 255 MW |
Winter Capacity | 255 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | March 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Tilt Angle | 60 |
DC Net Capacity | 344.1 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Taygete Energy Project LLC Plant Owners
Owner Name | Address | Ownership |
---|---|---|
TE Taygete Energy HoldCo, LLC | 3809 Juniper Trace, Suite 100, Austin, TX 78738 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#78 | Pisgah Ridge Solar, LLC | Richland, TX | 510.9 GWh |
#79 | Cool Springs Solar (Hybrid) | Bainbridge, GA | 509.0 GWh |
#80 | Sky Ranch Solar | Belen, NM | 495.3 GWh |
#81 | RE Tranquillity | Cantua Creek, CA | 491.4 GWh |
#82 | RE Garland | Rosamond, CA | 483.5 GWh |
#83 | Techren Solar II LLC | Boulder, NV | 483.4 GWh |
#84 | Townsite Solar Project Hybrid | Boulder City, NV | 461.6 GWh |
#85 | Oxbow Solar 1 | New Roads, LA | 475.5 GWh |
#86 | Taygete II Energy Project | Coyanosa, TX | 467.7 GWh |
#87 | Noble Solar | Krum, TX | 461.2 GWh |
#89 | Mesquite Solar 3, LLC | Tonopah, AZ | 457.6 GWh |
#90 | Fort Bend Solar LLC | East Bernard, TX | 453.7 GWh |
#91 | Blue Jay Solar I, LLC | Iola, TX | 448.5 GWh |
#92 | Escalante (NM) | Grants, NM | 453.4 GWh |
#93 | Bernard Creek Solar | Hungerford, TX | 452.1 GWh |
#94 | Oak Ridge Solar | Oak Ridge, LA | 451.0 GWh |
#95 | Sun Mountain Solar 1 | Unincorporated Pueblo, CO | 450.8 GWh |
#96 | Pleinmont Solar 2 | Spotsylvania, VA | 444.1 GWh |
#97 | Imperial Valley Solar, LLC | Calexico, CA | 443.5 GWh |
#98 | Misae Solar | Childress, TX | 441.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Taygete Energy Project LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Barilla Solar | Fort Stockton, TX | 53.7 GWh | 19.4 mi |
Castle Gap Solar Hybrid | McCarney, TX | 405.7 GWh | 50.8 mi |
Crane Solar Project | Crane, TX | 413.6 GWh | 48.5 mi |
Emerald Grove | Crane, TX | 268.8 GWh | 45.6 mi |
Greasewood II LLC | Girvin, TX | 386.7 GWh | 31 mi |
Greasewood Solar | Fort Stockton, TX | 210.8 GWh | 38.8 mi |
Oberon IA | Odessa, TX | 279.4 GWh | 44.8 mi |
Oberon IB | Odessa, TX | 57.1 GWh | 44.3 mi |
Pavo | Fort Stockton, TX | 18.0 GWh | 45.9 mi |
Permian Basin | Monahans, TX | 464.5 GWh | 30.5 mi |
Phoebe Solar | Kermit, TX | 535.5 GWh | 49.3 mi |
RE Roserock | Fort Stockton, TX | 373.6 GWh | 17.8 mi |
Sherbino II | Ft. Stockton, TX | 570.6 GWh | 45.7 mi |
Swift Air Solar I | Goldsmith, TX | 28.3 GWh | 48.8 mi |
Taygete II Energy Project | Coyanosa, TX | 467.7 GWh | 1.4 mi |
Upton County Solar | McCamey, TX | 340.7 GWh | 49.7 mi |
WAL897 | Fort Stockton, TX | 103.0 MWh | 22.6 mi |
West of the Pecos Solar | TBD, TX | 252.0 GWh | 40.1 mi |
Woodward Mountain I | Girvin, TX | 168.0 GWh | 44.6 mi |
Woodward Mountain II | Girvin, TX | 168.0 GWh | 44.6 mi |