Oberon IA
31600 W I-20, Odessa, TX 79760Plant Summary Information
Oberon IA is ranked #67 out of 188 solar farms in Texas in terms of total annual net electricity generation.
Oberon IA generated 60.5 GWh during the 3-month period between December 2024 to March 2025.
Plant Name | Oberon IA |
---|---|
Utility Name | Oberon Solar IA |
Location | Ector County, TX |
Initial Operation Date | July 2020 |
Last Update | Mar 2025 |
Annual Generation | 272.5 GWh |
Annual Consumption | 1.0 M MMBtu |
Ranked #2,018 out of 12,288 Power Plants Nationwide | |
Ranked #217 out of 6,174 Solar Power Plants Nationwide | |
Ranked #364 out of 788 Texas Power Plants | |
Ranked #67 out of 188 Texas Solar Power Plants | |
Fuel Types | Solar |
Map of Oberon IA
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Oberon IA.
Monthly Net Generation for Oberon IA
Oberon IA Details
Summary Information | |
---|---|
Plant Name | Oberon IA (62933) |
Plant Address | 31600 W I-20, Odessa, TX 79760 |
Utility | Oberon Solar IA (62788) |
Latitude, Longitude | 31.70326, -102.70121 |
Generation Dates on File | May 2020 to Mar 2025 |
Initial Operation Date | July 2020 |
Annual Generation | 272.5 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | EG19-94-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator OBR1A Details Operating July 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Jointly Owned |
Nameplate Capacity | 150 MW |
Summer Capacity | 150 MW |
Winter Capacity | 150 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Fixed Tilt | Yes |
Azimuth Angle | 165.6 |
Tilt Angle | 52 |
DC Net Capacity | 193 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Oberon IA Plant Owners
Owner Name | Address | Ownership |
---|---|---|
174 Power Global Corp. | 400 Spectrum Center Dr. Ste 1400, Irvine, CA 92618 | 50.00% |
TotalEnergies | 1201 Louisiana St #1800, Houston, TX 77002 | 50.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#207 | Fighting Jays Solar Project | Needville, TX | 282.9 GWh |
#208 | West Line Solar, LLC | City of Eloy, AZ | 279.6 GWh |
#209 | Central Line Solar, LLC | Coolidge, AZ | 279.1 GWh |
#210 | Colonial Trail West | Spring Grove, VA | 278.8 GWh |
#211 | Boulder Solar Power, LLC | Boulder City, NV | 278.4 GWh |
#212 | Emerald Grove | Crane, TX | 277.8 GWh |
#213 | Saint Solar | Coolidge, AZ | 277.6 GWh |
#214 | Wood County | Nekoosa, WI | 276.9 GWh |
#215 | Hunter Solar LLC (UT) | Clawson, UT | 273.5 GWh |
#216 | BPL Files Solar | Itasca, TX | 272.8 GWh |
#218 | Ivanpah 2 | Nipton, CA | 283.1 GWh |
#219 | Grant County | Town of Potosi, WI | 270.6 GWh |
#220 | Golden Triangle II | St.Artesia, MS | 266.2 GWh |
#221 | North Fork Solar Project | Snyder, OK | 269.6 GWh |
#222 | Atrisco Solar LLC | Rio Rancho, NM | 269.0 GWh |
#223 | Sunshine Valley Solar | Armagosa, NV | 267.8 GWh |
#224 | Bellflower Solar 1 | Lewisville, IN | 266.3 GWh |
#225 | Dougherty County Solar, LLC | Albany, GA | 265.5 GWh |
#226 | Imperial Solar Energy Center South | Calexico, CA | 264.3 GWh |
#227 | Fence Post Solar Hybrid Project, LLC | Corsicana, TX | 261.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Oberon IA.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
2W Permian Solar Project Hybrid | Andrews, TX | 939.0 GWh | 30.3 mi |
Bakke | Andrews, TX | 221.0 MWh | 42 mi |
Castle Gap Solar Hybrid | McCarney, TX | 406.7 GWh | 40 mi |
Crane Solar Project | Crane, TX | 411.8 GWh | 38.6 mi |
Ector County Energy Center | Goldsmith, TX | 648.7 GWh | 26.2 mi |
Goldsmith | Goldsmith, TX | 184.0 MWh | 19.2 mi |
Greasewood II LLC | Girvin, TX | 310.8 GWh | 41.8 mi |
N. Mary Francis | Odessa, TX | 216.0 MWh | 21.9 mi |
Notrees Windpower Hybrid | Goldsmith, TX | 272.3 GWh | 21.5 mi |
Oberon IB | Odessa, TX | 55.4 GWh | 0.8 mi |
Odessa-Ector Power Plant | Odessa, TX | 8.0 TWh | 24 mi |
Oxy Renewable Energy - Goldsmith | Goldsmith, TX | 40.5 GWh | 21 mi |
Permian Basin | Monahans, TX | 464.5 GWh | 17.5 mi |
Phoebe Solar | Kermit, TX | 525.2 GWh | 13.8 mi |
Prospero Solar | Andrews, TX | 753.2 GWh | 41.2 mi |
Prospero Solar II | Andrews, TX | 694.7 GWh | 40.4 mi |
Quail Run Energy Center | Odessa, TX | 3.1 TWh | 24.6 mi |
SPS1 Dollarhide | Jal, NM | 23.0 GWh | 38.9 mi |
Upton County Solar | McCamey, TX | 345.3 GWh | 40 mi |
Westover | Odessa, TX | 185.0 MWh | 17.6 mi |