Aktina Solar
29714 US-59, El Campo, TX 77437Plant Summary Information
Aktina Solar is ranked #10 out of 6,487 solar farms nationwide in terms of total annual net electricity generation.
Aktina Solar generated 163.8 GWh during the 3-month period between November 2025 to February 2026.
| Plant Name | Aktina Solar |
|---|---|
| Utility Name | Hecate Energy Ramsey, LLC |
| Location | Wharton County, TX |
| Initial Operation Date | December 2023 |
| Last Update | Feb 2026 |
| Annual Generation | 1.0 TWh |
| Annual Consumption | 3.4 M MMBtu |
| Ranked #748 out of 12,637 Power Plants Nationwide | |
| Ranked #10 out of 6,487 Solar Power Plants Nationwide | |
| Ranked #124 out of 820 Texas Power Plants | |
| Ranked #6 out of 219 Texas Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
Hecate Energy Ramsey , LLC (2021 to 2021) Hecate Energy Ramsey, LLC (2022 to 2024) |
Map of Aktina Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Aktina Solar.
Monthly Net Generation for Aktina Solar
Monthly Plant Fuel Consumption for Aktina Solar
Aktina Solar Details
| Summary Information | |
|---|---|
| Plant Name | Aktina Solar (64927) |
| Plant Address | 29714 US-59, El Campo, TX 77437 |
| Utility | Hecate Energy Ramsey, LLC (64409) |
| Latitude, Longitude | 29.122, -96.276 |
| Generation Dates on File | Aug 2021 to Feb 2026 |
| Initial Operation Date | December 2023 |
| Annual Generation | 1.0 TWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | CenterPoint Energy (8901) TX |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator AKS01 Details Operating December 2023
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 500 MW |
| Summer Capacity | 500 MW |
| Winter Capacity | 500 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2023 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 630 MW |
| Crystalline Silicon | Yes |
| Other Materials | No |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Aktina Solar Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1 | Gemini Solar Hybrid | Unincorporated, NV | 2.1 TWh |
| #2 | Hornet Solar (TX) | Tulia, TX | 1.4 TWh |
| #3 | Hecate Energy Frye Solar LLC | Kress, TX | 1.3 TWh |
| #4 | Fox Squirrel Solar | Mt Sterling, OH | 1.2 TWh |
| #5 | Sonoran Solar Energy | Buckeye, AZ | 1.1 TWh |
| #6 | Roseland Solar Project, LLC | Riesel, TX | 1.1 TWh |
| #7 | Roadrunner, LLC Hybrid | McCamey, TX | 1.1 TWh |
| #8 | Topaz Solar Farm | Santa Margarita, CA | 1.0 TWh |
| #9 | 2W Permian Solar Project Hybrid | Andrews, TX | 1.0 TWh |
| #11 | Mockingbird Solar Center | Brookston, TX | 943.5 GWh |
| #12 | Old 300 Solar Center, LLC | Needville, TX | 939.4 GWh |
| #13 | Waco Solar | Mt Calm, TX | 915.1 GWh |
| #14 | Eagle Shadow Mountain Solar Farm | Moapa, NV | 893.1 GWh |
| #15 | Solar Star 1 | Rosamond, CA | 888.2 GWh |
| #16 | Double Back Diamond | Virden, IL | 887.5 GWh |
| #17 | Daggett 3 | Daggett, CA | 859.8 GWh |
| #18 | Solana Generating Station | Gila Bend, AZ | 853.4 GWh |
| #19 | Desert Quartzite | Blythe, CA | 830.4 GWh |
| #20 | Greasewood II LLC | Girvin, TX | 846.1 GWh |
| #21 | Eleven Mile Solar Center | Coolidge, AZ | 791.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Aktina Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bernard Creek Solar | Hungerford, TX | 514.0 GWh | 25.7 mi |
| Brazoria County Solar Project (Danciger) | Damon, TX | 435.0 GWh | 31.3 mi |
| Cascade Solar (TX) | Wharton, TX | 17.3 GWh | 16.3 mi |
| Colorado Bend Energy Center | Wharton, TX | 2.1 TWh | 17 mi |
| Colorado Bend II | Wharton, TX | 6.0 TWh | 17.2 mi |
| Formosa Utility Venture Ltd | Point Comfort, TX | 4.9 TWh | 33.8 mi |
| Ganado Solar | Gail, TX | 347.1 GWh | 15.3 mi |
| HEB00292 | Bay City, TX | 246.0 MWh | 21.5 mi |
| Lane City Wind | Lane City, TX | 227.1 GWh | 16.1 mi |
| Newgulf Cogen | NewGulf, TX | 12.7 GWh | 24.7 mi |
| Old 300 Solar Center, LLC | Needville, TX | 939.4 GWh | 30.8 mi |
| Peyton Creek Wind Farm II | Bay City, TX | 449.8 GWh | 29.3 mi |
| Peyton Creek Wind Farm LLC | Bay City, TX | 309.9 GWh | 31.5 mi |
| Prairie Switch Wind LLC | El Campo, TX | 402.0 GWh | 11.4 mi |
| Red Tailed Hawk Solar LLC | Pierce, TX | 798.8 GWh | 8.5 mi |
| Second Division Solar | West Columbia, TX | 194.8 GWh | 32.4 mi |
| Sky Global Power One | Rock Island, TX | 79.7 GWh | 33.5 mi |
| South Texas Project | Wadsworth, TX | 21.8 TWh | 26.5 mi |
| Sweeny Cogen Facility | Old Ocean, TX | 3.3 TWh | 32.2 mi |
| Tres Bahias | Port Lavaca, TX | 446.6 GWh | 33.1 mi |