Prairie Switch Wind LLC
6445 CR 421, El Campo, TX 77434Plant Summary Information
Prairie Switch Wind LLC is ranked #118 out of 228 wind farms in Texas in terms of total annual net electricity generation.
Prairie Switch Wind LLC generated 158.8 GWh during the 3-month period between February 2026 to May 2026.
| Plant Name | Prairie Switch Wind LLC |
|---|---|
| Utility Name | Prairie Switch Wind LLC |
| Location | Wharton County, TX |
| Initial Operation Date | May 2025 |
| Last Update | May 2026 |
| Annual Generation | 508.7 GWh |
| Annual Consumption | 1.9 M MMBtu |
| Ranked #1,346 out of 13,081 Power Plants Nationwide | |
| Ranked #369 out of 1,366 Wind Power Plants Nationwide | |
| Ranked #276 out of 852 Texas Power Plants | |
| Ranked #118 out of 228 Texas Wind Power Plants | |
| Fuel Types | Wind |
Map of Prairie Switch Wind LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Prairie Switch Wind LLC.
Monthly Net Generation for Prairie Switch Wind LLC
Monthly Plant Fuel Consumption for Prairie Switch Wind LLC
Prairie Switch Wind LLC Details
| Summary Information | |
|---|---|
| Plant Name | Prairie Switch Wind LLC (66123) |
| Plant Address | 6445 CR 421, El Campo, TX 77434 |
| Utility | Prairie Switch Wind LLC (65282) |
| Latitude, Longitude | 29.0919, -96.09 |
| Generation Dates on File | May 2025 to May 2026 |
| Initial Operation Date | May 2025 |
| Annual Generation | 508.7 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | EG23-28-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | AEP Texas Central Company (3278) TX |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
Generator PSW1 Details Operating May 2025
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 163.2 MW |
| Summer Capacity | 163.2 MW |
| Winter Capacity | 163.2 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | May 2025 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Carbon Capture Technology | No |
| Turbines/Hydrokinetic Buoys | 48 |
| Multiple Fuels | No |
| Turbine Details | |
| Number Of Turbines | 48 |
|---|---|
| Predominant Turbine Manufacturer | GE |
| Predominant Turbine Model Number | 3.4-140 |
| Design Wind Speed | 16.4 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 384 |
Prairie Switch Wind LLC Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| Fengate Asset Management | 609 Main Street Suite 3525, Houston, TX 77002 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #359 | Rock Creek Wind | McFadden, WY | 519.5 GWh |
| #360 | Manzana Wind LLC | Rosamond, CA | 519.3 GWh |
| #361 | Chapman Ranch Wind I | Corpus Christi, TX | 518.0 GWh |
| #362 | Top of the World Windpower Project | Glenrock, WY | 517.3 GWh |
| #363 | Delta Wind Farm (MS) | Dundee, MS | 513.7 GWh |
| #364 | Border Winds Wind Farm | Rolla, ND | 513.1 GWh |
| #365 | Canadian Hills Wind | El Rino, OK | 511.8 GWh |
| #366 | Wheatridge East Wind | Lexington, OR | 511.1 GWh |
| #367 | Ranchland Wind Project II | Cisco, TX | 511.0 GWh |
| #368 | Twin Ridges Wind Farm | Meyersdale, PA | 510.6 GWh |
| #370 | Big Horn Wind Project | Bickelton, WA | 508.0 GWh |
| #371 | South Fork Wind | East Hampton, NY | 507.2 GWh |
| #372 | Cedar Creek Wind, LLC | Shelley, ID | 504.9 GWh |
| #373 | Frontier Windpower | Newkirk, OK | 503.3 GWh |
| #374 | Maryneal Windpower | Maryneal, TX | 499.2 GWh |
| #375 | Grant Wind, LLC | Medford, OK | 498.5 GWh |
| #376 | Green River Wind Farm | Deer Grove, IL | 497.3 GWh |
| #377 | Montague Wind Power Facility LLC | Arlington, OR | 495.2 GWh |
| #378 | Richland (IA) | Odebolt, IA | 494.1 GWh |
| #379 | Buffalo Ridge II LLC | Elkton, SD | 493.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Prairie Switch Wind LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Aktina Solar | El Campo, TX | 1.1 TWh | 11.4 mi |
| Bernard Creek Solar | Hungerford, TX | 494.0 GWh | 25.1 mi |
| Brazoria County Solar Project (Danciger) | Damon, TX | 411.3 GWh | 20.7 mi |
| Brazoria West | Damon, TX | 422.3 GWh | 26.7 mi |
| Cascade Solar (TX) | Wharton, TX | 9.6 GWh | 8.8 mi |
| Colorado Bend Energy Center | Wharton, TX | 2.1 TWh | 13.6 mi |
| Colorado Bend II | Wharton, TX | 6.5 TWh | 13.7 mi |
| Danish Fields Solar, LLC | El Campo, TX | 926.2 GWh | 9.6 mi |
| Ganado Solar | Gail, TX | 332.7 GWh | 26.5 mi |
| HEB00292 | Bay City, TX | 191.0 MWh | 11 mi |
| Lane City Wind | Lane City, TX | 405.8 GWh | 8.9 mi |
| Long Point Solar | Damon, TX | 96.7 GWh | 27.1 mi |
| Old 300 Solar Center, LLC | Needville, TX | 888.4 GWh | 23.1 mi |
| Peyton Creek Wind Farm II | Bay City, TX | 636.8 GWh | 19.1 mi |
| Peyton Creek Wind Farm LLC | Bay City, TX | 338.6 GWh | 22 mi |
| Red Tailed Hawk Solar LLC | Pierce, TX | 777.4 GWh | 5.6 mi |
| Second Division Solar | West Columbia, TX | 191.6 GWh | 21.7 mi |
| South Texas Project | Wadsworth, TX | 20.6 TWh | 20.7 mi |
| Sweeny Cogen Facility | Old Ocean, TX | 3.2 TWh | 20.9 mi |
| Texas Gulf Sulphur | NewGulf, TX | 4.6 GWh | 16.5 mi |